COLUMN-BEAM JOINT METHOD AND COLUMN-BEAM JOINT STRUCTURE
To improve the degree of freedom of construction in a precast concrete structure and to reduce the cost.SOLUTION: A precast column member 12 with a concave column-side shear key 21 is erected at a predetermined position, and a removable temporary support member (23) is attached to the precast column member 12. The end of a precast beam member 13 with a concave beam-side shear key 20 at the end face is placed on the temporary support member (23) so as to face the column-side shear key 21 and the beam-side shear key 20 each other. The void G formed between the precast beam member 13 and the precast column member 12 is filled with a filler material 14. A tension member 15 is placed over the precast beam member 13 and the precast column member 14, and after the filler 14 is cured, prestress is introduced into the precast beam member 13 and precast column member 12 by applying tension to the tension member 15.SELECTED DRAWING: Figure 5
【課題】プレキャストコンクリート構造物における施工の自由度を向上し、且つコストを低減する。【解決手段】凹形状の柱側シアキー21を有するプレキャスト柱部材12を所定の位置に立設し、プレキャスト柱部材12に、着脱可能な仮支持部材(23)を取り付ける。凹形状の梁側シアキー20を端面に有するプレキャスト梁部材13の端部を仮支持部材(23)の上に載置し、柱側シアキー21と梁側シアキー20とを対向させる。プレキャスト梁部材13とプレキャスト柱部材12との間に形成される空隙Gに充填材14を充填する。プレキャスト梁部材13とプレキャスト柱部材14とに亘るように緊張材15を配置し、充填材14が硬化した後に、緊張材15に緊張力を付与することでプレキャスト梁部材13及びプレキャスト柱部材12にプレストレスを導入する。【選択図】図5
COLUMN-BEAM JOINT METHOD AND COLUMN-BEAM JOINT STRUCTURE
To improve the degree of freedom of construction in a precast concrete structure and to reduce the cost.SOLUTION: A precast column member 12 with a concave column-side shear key 21 is erected at a predetermined position, and a removable temporary support member (23) is attached to the precast column member 12. The end of a precast beam member 13 with a concave beam-side shear key 20 at the end face is placed on the temporary support member (23) so as to face the column-side shear key 21 and the beam-side shear key 20 each other. The void G formed between the precast beam member 13 and the precast column member 12 is filled with a filler material 14. A tension member 15 is placed over the precast beam member 13 and the precast column member 14, and after the filler 14 is cured, prestress is introduced into the precast beam member 13 and precast column member 12 by applying tension to the tension member 15.SELECTED DRAWING: Figure 5
【課題】プレキャストコンクリート構造物における施工の自由度を向上し、且つコストを低減する。【解決手段】凹形状の柱側シアキー21を有するプレキャスト柱部材12を所定の位置に立設し、プレキャスト柱部材12に、着脱可能な仮支持部材(23)を取り付ける。凹形状の梁側シアキー20を端面に有するプレキャスト梁部材13の端部を仮支持部材(23)の上に載置し、柱側シアキー21と梁側シアキー20とを対向させる。プレキャスト梁部材13とプレキャスト柱部材12との間に形成される空隙Gに充填材14を充填する。プレキャスト梁部材13とプレキャスト柱部材14とに亘るように緊張材15を配置し、充填材14が硬化した後に、緊張材15に緊張力を付与することでプレキャスト梁部材13及びプレキャスト柱部材12にプレストレスを導入する。【選択図】図5
COLUMN-BEAM JOINT METHOD AND COLUMN-BEAM JOINT STRUCTURE
柱梁接合方法及び柱梁接合構造
NAGAMOTO NAOKI (author) / TANO KENJI (author) / MATSUNAGA KENTARO (author)
2023-01-20
Patent
Electronic Resource
Japanese
COLUMN-BEAM JOINT STRUCTURE, AND COLUMN-BEAM JOINT METHOD
European Patent Office | 2021
|COLUMN-BEAM JOINT STRUCTURE AND COLUMN-BEAM JOINT METHOD
European Patent Office | 2024
|COLUMN-BEAM JOINT STRUCTURE AND COLUMN-BEAM JOINT METHOD
European Patent Office | 2019
|COLUMN-BEAM JOINT STRUCTURE AND COLUMN-BEAM JOINT METHOD
European Patent Office | 2024
|COLUMN BEAM JOINT STRUCTURE AND COLUMN BEAM JOINT METHOD
European Patent Office | 2020
|