CONSTRUCTION METHOD OF FLOOR PART AND DUCT
To simplify a work while reducing a work space in constructing the entire floor part and duct.SOLUTION: In a construction method of a floor part and a duct for constructing the floor part and the duct to be arranged at the floor part, a basic assembly process of dividing the entire floor part and duct 5 into a plurality of floor duct units 6 having floor members 32, 33 configuring the floor part and the duct 5 and assembling with the divided floor duct unit 6 as unit, an installation process of installing the floor duct unit 6 assembled in the basic assembly process at a prescribed position, and a connection process of connecting the floor members 32, 33 and the ducts 5 in the adjacent floor duct units 6 installed in the installation process and connecting the adjacent floor duct units 6 are executed.SELECTED DRAWING: Figure 3
【課題】床部及びダクトの全体を施工するに当たり、作業スペースの低減を図りながら、作業の簡素化を図ること。【解決手段】床部及びその床部に配設するダクトを施工する床部及びダクトの施工方法において、床部及びダクト5の全体を、床部を構成する床部材32、33とダクト5とを有する複数の床ダクトユニット6に分割して、その分割された床ダクトユニット6単位で組み立てる地組工程と、その地組工程にて組み立てられた床ダクトユニット6を所定位置に設置する設置工程と、その設置工程にて設置された隣接する床ダクトユニット6における床部材32、33同士及びダクト5同士を接続して、隣接する床ダクトユニット6同士を接続する接続工程とを行う。【選択図】図3
CONSTRUCTION METHOD OF FLOOR PART AND DUCT
To simplify a work while reducing a work space in constructing the entire floor part and duct.SOLUTION: In a construction method of a floor part and a duct for constructing the floor part and the duct to be arranged at the floor part, a basic assembly process of dividing the entire floor part and duct 5 into a plurality of floor duct units 6 having floor members 32, 33 configuring the floor part and the duct 5 and assembling with the divided floor duct unit 6 as unit, an installation process of installing the floor duct unit 6 assembled in the basic assembly process at a prescribed position, and a connection process of connecting the floor members 32, 33 and the ducts 5 in the adjacent floor duct units 6 installed in the installation process and connecting the adjacent floor duct units 6 are executed.SELECTED DRAWING: Figure 3
【課題】床部及びダクトの全体を施工するに当たり、作業スペースの低減を図りながら、作業の簡素化を図ること。【解決手段】床部及びその床部に配設するダクトを施工する床部及びダクトの施工方法において、床部及びダクト5の全体を、床部を構成する床部材32、33とダクト5とを有する複数の床ダクトユニット6に分割して、その分割された床ダクトユニット6単位で組み立てる地組工程と、その地組工程にて組み立てられた床ダクトユニット6を所定位置に設置する設置工程と、その設置工程にて設置された隣接する床ダクトユニット6における床部材32、33同士及びダクト5同士を接続して、隣接する床ダクトユニット6同士を接続する接続工程とを行う。【選択図】図3
CONSTRUCTION METHOD OF FLOOR PART AND DUCT
床部及びダクトの施工方法
SUZUKI NOBUHITO (author) / OSAKI TOMOHIRO (author) / FUJISAKI MIREI (author) / YAMAZAKI SHIYOUGO (author) / MOROOKA SHUNSUKE (author) / YOSHIMURA JUNYA (author)
2023-03-02
Patent
Electronic Resource
Japanese
ACCESS FLOOR PANEL INTEGRATED WITH AIR DUCT AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2024
ACCESS FLOOR PANEL INTEGRATED WITH AIR DUCT AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2024
|