A platform for research: civil engineering, architecture and urbanism
EMERGENCY TEMPORARY BRIDGE AND CONSTRUCTION METHOD THEREOF
To provide a temporal bridge that can be erected on an emergency basis to save lives and transport supplies in an event of flooding.SOLUTION: An air beam 20, which has a span longer than a distance of a rising water area 3 between an erection starting point side shore 1 and a reaching side shore 2, and whose inner space 21 serves as a passageway, is manufactured by expansion and deployment at the erection starting point side shore 1. The air beam 20 is supported at one end of a bridge end support body 30 provided at the erection starting point side shore 1 and is turned in substantially horizontal around its turning center via a turn table 31 of the bridge end support body 30 until the other end is located on the reaching side shore 2. The other end of the air beam is supported on an airbag bridge abutment 25. This constructs an air beam bridge 10 between the erection starting point side shore 1 and the reaching side shore 2 as an emergency temporal bridge.SELECTED DRAWING: Figure 1
【課題】水害発生時に、人命救助、物資搬送等のために緊急に架設可能な仮設橋を提供する。【解決手段】 架設起点側岸1と到達側岸2との間の増水域3の距離よりも長いスパンを有し、内部空間21が通路となるエアビーム20を、架設起点側岸1で膨張展開して製作する。エアビーム20を、架設起点側岸1に設けた橋端支持体30に一端を支持させて橋端支持体30のターンテーブル31を介して、その旋回中心周りに、他端が到達側岸2に位置するまで略水平旋回させる。エアビーム他端を到達側岸のエアバッグ橋台25上に支持させる。これにより架設起点側1と到達側岸2との間に緊急仮設橋としてのエアビーム橋10を構築する。【選択図】 図1
EMERGENCY TEMPORARY BRIDGE AND CONSTRUCTION METHOD THEREOF
To provide a temporal bridge that can be erected on an emergency basis to save lives and transport supplies in an event of flooding.SOLUTION: An air beam 20, which has a span longer than a distance of a rising water area 3 between an erection starting point side shore 1 and a reaching side shore 2, and whose inner space 21 serves as a passageway, is manufactured by expansion and deployment at the erection starting point side shore 1. The air beam 20 is supported at one end of a bridge end support body 30 provided at the erection starting point side shore 1 and is turned in substantially horizontal around its turning center via a turn table 31 of the bridge end support body 30 until the other end is located on the reaching side shore 2. The other end of the air beam is supported on an airbag bridge abutment 25. This constructs an air beam bridge 10 between the erection starting point side shore 1 and the reaching side shore 2 as an emergency temporal bridge.SELECTED DRAWING: Figure 1
【課題】水害発生時に、人命救助、物資搬送等のために緊急に架設可能な仮設橋を提供する。【解決手段】 架設起点側岸1と到達側岸2との間の増水域3の距離よりも長いスパンを有し、内部空間21が通路となるエアビーム20を、架設起点側岸1で膨張展開して製作する。エアビーム20を、架設起点側岸1に設けた橋端支持体30に一端を支持させて橋端支持体30のターンテーブル31を介して、その旋回中心周りに、他端が到達側岸2に位置するまで略水平旋回させる。エアビーム他端を到達側岸のエアバッグ橋台25上に支持させる。これにより架設起点側1と到達側岸2との間に緊急仮設橋としてのエアビーム橋10を構築する。【選択図】 図1
EMERGENCY TEMPORARY BRIDGE AND CONSTRUCTION METHOD THEREOF
緊急仮設橋及びその構築方法
ISHIDA MASATOSHI (author) / TANIWAKI KOICHI (author) / SHUKU YOSHIKI (author) / KAMATA KAZUTOSHI (author) / TANAKA MASAYOSHI (author)
2023-04-14
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
EMERGENCY TEMPORARY BRIDGE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2022
|Construction temporary bridge and construction method thereof
European Patent Office | 2021
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR TEMPORARY BRIDGE
European Patent Office | 2020
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
European Patent Office | 2023
|