A platform for research: civil engineering, architecture and urbanism
MANUFACTURING METHOD OF STRUCTURAL MEMBER, STRUCTURAL MEMBER AND BUILDING
To provide a manufacturing method of a structural member, structural member, and building that easily ensure accuracy of reinforcement placement.SOLUTION: A manufacturing method of a structural member includes the processes of: stacking wet-type materials 22 and forming an outer frame member 20 by installing a plurality of guide bars 24 projecting outward from the wet-type materials 22 at each predetermined number of layers of wet-type materials 22; arranging reinforcement bars 30 along an outer frame member 20 and fixing them to the guide bars 24; opposing the outer frame members 20 before or after arranging the reinforcement bars 30; and filling filler material between the oppositely arranged outer frame members 20.SELECTED DRAWING: Figure 5A
【課題】配筋精度を確保し易い構造部材の製造方法、構造部材及び建物を提供する。【解決手段】構造部材の製造方法は、湿式材22を積層すると共に、湿式材22の所定の層数ごとに湿式材22の外側へ突出するガイド筋24を複数設置して外枠部材20を形成する工程と、外枠部材20に沿う鉄筋30をガイド筋24に固定して配筋する工程と、鉄筋30を配筋する前又は配筋した後に外枠部材20を対向配置する工程と、対向配置された外枠部材20間に充填材を充填する工程と、を有する。【選択図】図5A
MANUFACTURING METHOD OF STRUCTURAL MEMBER, STRUCTURAL MEMBER AND BUILDING
To provide a manufacturing method of a structural member, structural member, and building that easily ensure accuracy of reinforcement placement.SOLUTION: A manufacturing method of a structural member includes the processes of: stacking wet-type materials 22 and forming an outer frame member 20 by installing a plurality of guide bars 24 projecting outward from the wet-type materials 22 at each predetermined number of layers of wet-type materials 22; arranging reinforcement bars 30 along an outer frame member 20 and fixing them to the guide bars 24; opposing the outer frame members 20 before or after arranging the reinforcement bars 30; and filling filler material between the oppositely arranged outer frame members 20.SELECTED DRAWING: Figure 5A
【課題】配筋精度を確保し易い構造部材の製造方法、構造部材及び建物を提供する。【解決手段】構造部材の製造方法は、湿式材22を積層すると共に、湿式材22の所定の層数ごとに湿式材22の外側へ突出するガイド筋24を複数設置して外枠部材20を形成する工程と、外枠部材20に沿う鉄筋30をガイド筋24に固定して配筋する工程と、鉄筋30を配筋する前又は配筋した後に外枠部材20を対向配置する工程と、対向配置された外枠部材20間に充填材を充填する工程と、を有する。【選択図】図5A
MANUFACTURING METHOD OF STRUCTURAL MEMBER, STRUCTURAL MEMBER AND BUILDING
構造部材の製造方法、構造部材及び建物
OTA YOSHIHIRO (author) / IDOSAKO YUKI (author) / KOBAYASHI FUKO (author) / OKAZAKI TOMOHITO (author) / NAKAJIMA NAOKO (author) / TAKAO TAKESHI (author) / TAKATSU HIROTO (author)
2023-04-25
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2024
|STRUCTURAL MEMBER AND STRUCTURAL MEMBER MANUFACTURING METHOD
European Patent Office | 2024
|European Patent Office | 2022
|STRUCTURAL MEMBER AND METHOD OF MANUFACTURING STRUCTURAL MEMBER
European Patent Office | 2023
|Structural member for fabricated building and building structure with structural member
European Patent Office | 2022
|