A platform for research: civil engineering, architecture and urbanism
SCREW FIXING STRUCTURE AND SCREW FIXING METHOD FOR UPPER FRAME IN PARTITION
To provide a screw fixing structure and a screw fixing method for an upper frame 6 of a transom space R to be fixed with screws without a deformed state due to excessive screwing, for preventing the upper frame 6 from inadvertently falling off, in a partition 1 where a transom plate does not incorporate in the transom space R.SOLUTION: In a screw fixing structure and a screw fixing method for an upper frame in partitions, in a state in which a spacer 8 placed in a gap S between an upper rail piece 5b and an upper frame lower piece 6b penetrates through a through-hole 6h provided in the upper frame lower piece 6b, an upper edge part 8a of the spacer abuts on an upper rail piece 5b of a ceiling rail and a screw head 7a abuts on a lower edge part 8b, and thereby a screw 7 cannot be screwed further, so that the upper frame 6 can be fixed in a state where the deformation of the upper frame 6 is prevented.SELECTED DRAWING: Figure 5
【課題】欄間空間Rに欄間板が組み込まれていない間仕切り1において、欄間空間Rの上枠6が不用意に脱落するのを防止するため、上枠6が、過剰螺入による変形がない状態でネジ固定する。【解決手段】レール上片部5bと上枠下片部6bとのあいだの間隙Sに配されるスペーサ8を、上枠下片部6bに設けた貫通孔6hを貫通する状態で、スペーサ上端縁部8aが天井レールのレール上片部5bに当接し下端縁部8bにネジ頭部7aが当接して、これ以上のネジ7の捩じ込みができない状態とすることで、上枠6の変形防止がなされた状態での該上枠6のネジ固定ができるようにする。【選択図】図5
SCREW FIXING STRUCTURE AND SCREW FIXING METHOD FOR UPPER FRAME IN PARTITION
To provide a screw fixing structure and a screw fixing method for an upper frame 6 of a transom space R to be fixed with screws without a deformed state due to excessive screwing, for preventing the upper frame 6 from inadvertently falling off, in a partition 1 where a transom plate does not incorporate in the transom space R.SOLUTION: In a screw fixing structure and a screw fixing method for an upper frame in partitions, in a state in which a spacer 8 placed in a gap S between an upper rail piece 5b and an upper frame lower piece 6b penetrates through a through-hole 6h provided in the upper frame lower piece 6b, an upper edge part 8a of the spacer abuts on an upper rail piece 5b of a ceiling rail and a screw head 7a abuts on a lower edge part 8b, and thereby a screw 7 cannot be screwed further, so that the upper frame 6 can be fixed in a state where the deformation of the upper frame 6 is prevented.SELECTED DRAWING: Figure 5
【課題】欄間空間Rに欄間板が組み込まれていない間仕切り1において、欄間空間Rの上枠6が不用意に脱落するのを防止するため、上枠6が、過剰螺入による変形がない状態でネジ固定する。【解決手段】レール上片部5bと上枠下片部6bとのあいだの間隙Sに配されるスペーサ8を、上枠下片部6bに設けた貫通孔6hを貫通する状態で、スペーサ上端縁部8aが天井レールのレール上片部5bに当接し下端縁部8bにネジ頭部7aが当接して、これ以上のネジ7の捩じ込みができない状態とすることで、上枠6の変形防止がなされた状態での該上枠6のネジ固定ができるようにする。【選択図】図5
SCREW FIXING STRUCTURE AND SCREW FIXING METHOD FOR UPPER FRAME IN PARTITION
間仕切りにおける上枠のネジ固定構造およびネジ固定方法
KIKAMA KIYOFUMI (author)
2023-05-15
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2016
|