A platform for research: civil engineering, architecture and urbanism
NEW FOUNDATION FOR MACHINERY INSTALLATION
To reduce a range where an existing slab is chipped when a new foundation where machinery is installed in an existing slab is newly provided.SOLUTION: A new foundation 100 includes a deformed stud 102 joined to a pile head part 62 exposed by chipping an existing slab 10 right above the pile head part 62, and a reinforced-concrete part 110 that is constructed right above the pile head part 62 and in which the deformed stud 102 is embedded.SELECTED DRAWING: Figure 2
【課題】既設のスラブに機械類を設置する新設基礎を新たに設ける際の既設のスラブを斫る範囲を小さくする。【解決手段】新設基礎100は、柱頭部62の直上の既設のスラブ10を斫って露出した柱頭部62に接合された異形スタッド102と、柱頭部62の直上に構築され異形スタッド102が埋設された鉄筋コンクリート部110と、を備えている。【選択図】図2
NEW FOUNDATION FOR MACHINERY INSTALLATION
To reduce a range where an existing slab is chipped when a new foundation where machinery is installed in an existing slab is newly provided.SOLUTION: A new foundation 100 includes a deformed stud 102 joined to a pile head part 62 exposed by chipping an existing slab 10 right above the pile head part 62, and a reinforced-concrete part 110 that is constructed right above the pile head part 62 and in which the deformed stud 102 is embedded.SELECTED DRAWING: Figure 2
【課題】既設のスラブに機械類を設置する新設基礎を新たに設ける際の既設のスラブを斫る範囲を小さくする。【解決手段】新設基礎100は、柱頭部62の直上の既設のスラブ10を斫って露出した柱頭部62に接合された異形スタッド102と、柱頭部62の直上に構築され異形スタッド102が埋設された鉄筋コンクリート部110と、を備えている。【選択図】図2
NEW FOUNDATION FOR MACHINERY INSTALLATION
機械類設置用の新設基礎
ASAI YUTA (author) / AIDA NAOYA (author)
2023-05-18
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Engineering Index Backfile | 1930
|Foundation soil characteristics and machinery foundation
Engineering Index Backfile | 1963
|