JOINT STRUCTURE AND JOINT METHOD
To provide a joint structure and a joint method which can alleviate manufacturing accuracy required for a precast concrete plate and a steel material.SOLUTION: A joint structure 1 for joining a precast concrete plate 3 and a steel material unit 5 includes a steel material connection part 9 connected to a part of the precast concrete plate 3 and a part of the steel material unit 5. The steel material connection part 9 has a connection member 11 buried so as to partially project from an upper surface 3a of the precast concrete plate 3, a deviation preventing part 13 which is provided on the steel material unit 5 and is inserted into an insertion space 15 that is surrounded with the connection member 11 and is opened to the steel material unit 5 side, and a filling and solidification part 19 which is made to fill a gap between the connection member 11 and the deviation preventing part 13 in the insertion space 15, and is solidified.SELECTED DRAWING: Figure 1
【課題】プレキャストコンクリート版や鋼材に要求される製作精度を緩和する接合構造及び接合方法を提供する。【解決手段】プレキャストコンクリート版3と鋼材ユニット5とを接合する接合構造1は、プレキャストコンクリート版3の一部位と鋼材ユニット5の一部位と接続する鋼材接続部9を備えており、鋼材接続部9は、プレキャストコンクリート版3の上面3aから一部が突出するように埋設された接続部材11と、鋼材ユニット5に設けられ、接続部材11で囲繞され鋼材ユニット5側に開口した挿入空間15内に挿入されたずれ止め部13と、挿入空間15内で接続部材11とずれ止め部13との隙間に充填され固化された充填固化部19と、を有する。【選択図】図1
JOINT STRUCTURE AND JOINT METHOD
To provide a joint structure and a joint method which can alleviate manufacturing accuracy required for a precast concrete plate and a steel material.SOLUTION: A joint structure 1 for joining a precast concrete plate 3 and a steel material unit 5 includes a steel material connection part 9 connected to a part of the precast concrete plate 3 and a part of the steel material unit 5. The steel material connection part 9 has a connection member 11 buried so as to partially project from an upper surface 3a of the precast concrete plate 3, a deviation preventing part 13 which is provided on the steel material unit 5 and is inserted into an insertion space 15 that is surrounded with the connection member 11 and is opened to the steel material unit 5 side, and a filling and solidification part 19 which is made to fill a gap between the connection member 11 and the deviation preventing part 13 in the insertion space 15, and is solidified.SELECTED DRAWING: Figure 1
【課題】プレキャストコンクリート版や鋼材に要求される製作精度を緩和する接合構造及び接合方法を提供する。【解決手段】プレキャストコンクリート版3と鋼材ユニット5とを接合する接合構造1は、プレキャストコンクリート版3の一部位と鋼材ユニット5の一部位と接続する鋼材接続部9を備えており、鋼材接続部9は、プレキャストコンクリート版3の上面3aから一部が突出するように埋設された接続部材11と、鋼材ユニット5に設けられ、接続部材11で囲繞され鋼材ユニット5側に開口した挿入空間15内に挿入されたずれ止め部13と、挿入空間15内で接続部材11とずれ止め部13との隙間に充填され固化された充填固化部19と、を有する。【選択図】図1
JOINT STRUCTURE AND JOINT METHOD
接合構造及び接合方法
IWAMOTO TAKUYA (author) / SOGABE NAOKI (author) / OKUBO KAZUMASA (author) / MINAGAWA HARUNA (author)
2023-08-10
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
JOINT STRUCTURE, JOINT, AND INSTALLATION METHOD FOR JOINT STRUCTURE
European Patent Office | 2017
|JOINT DEVICE, JOINT STRUCTURE, AND JOINT METHOD FOR JOINT SECTION
European Patent Office | 2016
|European Patent Office | 2019
|