A platform for research: civil engineering, architecture and urbanism
To enable a brace to be simply installed and removed by manual work of an operator in a short period without substantially sacrificing strength achieved by the brace.SOLUTION: A brace fixing method includes: a pile driving step to fix a pile to the ground by repeatedly driving and removing the pile to and from the ground, feeding sand as filler into a vertical hole formed in the ground by removing the pile at each time, subsequently driving the pile repeatedly to cause the pile to gradually outwardly expand and compact the sand fed in the vertical hole and surrounding earth thereof, and retaining the pile so that an upper end of the pile protrudes from a ground surface after completion of compaction; and a brace connection step to coaxially connect the brace to the pile so as to contact each other by using a portion protruded from the ground surface of the pile fixed to the ground after the pile is fixed to the ground.SELECTED DRAWING: Figure 8
【課題】支柱において実現される強度を実質的に犠牲にすることなく、作業者の手作業によって簡易に、かつ、短期に、支柱の設置および撤去を行うことを可能にする。【解決手段】支柱固定方法は、地盤に対する杭の打ち込みと引き抜きとを反復するとともに、各回の引き抜きごとにその後に地盤に造成された縦穴内に砂を充填材として投入し、その後に反復される各回の打ち込みにより、同じ杭が、縦穴内に投入された砂およびそれの周辺土壌を段階的に外向きに押し拡げながら締め固め、その締固めが完了すると、杭をそれの上端部が地表から突き出る状態で地中に留置し、それにより、杭を地盤に固定する杭打ち工程と、杭が地盤に固定された後、地盤に固定されている杭のうち地表から突き出る部分を用いて支柱を杭に同軸的にかつ相互に接触する状態で連結する支柱連結工程とを含む。【選択図】図8
To enable a brace to be simply installed and removed by manual work of an operator in a short period without substantially sacrificing strength achieved by the brace.SOLUTION: A brace fixing method includes: a pile driving step to fix a pile to the ground by repeatedly driving and removing the pile to and from the ground, feeding sand as filler into a vertical hole formed in the ground by removing the pile at each time, subsequently driving the pile repeatedly to cause the pile to gradually outwardly expand and compact the sand fed in the vertical hole and surrounding earth thereof, and retaining the pile so that an upper end of the pile protrudes from a ground surface after completion of compaction; and a brace connection step to coaxially connect the brace to the pile so as to contact each other by using a portion protruded from the ground surface of the pile fixed to the ground after the pile is fixed to the ground.SELECTED DRAWING: Figure 8
【課題】支柱において実現される強度を実質的に犠牲にすることなく、作業者の手作業によって簡易に、かつ、短期に、支柱の設置および撤去を行うことを可能にする。【解決手段】支柱固定方法は、地盤に対する杭の打ち込みと引き抜きとを反復するとともに、各回の引き抜きごとにその後に地盤に造成された縦穴内に砂を充填材として投入し、その後に反復される各回の打ち込みにより、同じ杭が、縦穴内に投入された砂およびそれの周辺土壌を段階的に外向きに押し拡げながら締め固め、その締固めが完了すると、杭をそれの上端部が地表から突き出る状態で地中に留置し、それにより、杭を地盤に固定する杭打ち工程と、杭が地盤に固定された後、地盤に固定されている杭のうち地表から突き出る部分を用いて支柱を杭に同軸的にかつ相互に接触する状態で連結する支柱連結工程とを含む。【選択図】図8
BRACE FIXING METHOD
支柱固定方法
YOSHIKAWA AKIHIRO (author)
2023-08-21
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
BRACE FIXING UNIT AND FLOOR SUPPORT STRUCTURE USING BRACE FIXING UNIT
European Patent Office | 2020
|BRACE FIXING METAL FITTING, AND BRACE ATTACHING STRUCTURE
European Patent Office | 2022
|