A platform for research: civil engineering, architecture and urbanism
To improve accuracy of position and orientation of a pile when the pile is driven to underground.SOLUTION: A method in which at least a piece of pile 30 is manually driven to underground by an operator and at least a piece of brace is fixed to the ground using the pile as a foundation instead of using concrete foundation includes: a pile driving step to fix the pile 30 to the ground by driving the pile 30 to underground; a brace connection step to connect the brace to the pile 30 by using a portion protruding from the ground surface of the pile 30 fixed to the ground after the pile 30 is fixed to the ground; and a guide installation step in which the operator installs a pile guide tool 70 that guides the pile 30 so as to be vertically movable and a pile positioning tool 72 that horizontally positions the pile 30 on the ground surface before driving the pile 30.SELECTED DRAWING: Figure 5
【課題】杭が地中に打ち込まれたときのその杭の位置および向きに関する精度を向上させる。【解決手段】コンクリート基礎を用いる代わりに作業者が手作業で少なくとも1本の杭30を地中に打ち込んでその杭を基礎として用いて少なくとも1本の支柱を地盤に固定する方法は、杭30を地中に打ち込むことにより、杭30を地盤に固定する杭打ち工程と、杭30が地盤に固定された後、地盤に固定されている杭30のうち地表から突き出る部分を用いて前記支柱を杭30に連結する支柱連結工程と、杭30の打ち込みに先立ち、作業者が、杭30を上下動可能にガイドする杭ガイド具70と、地表における杭30を水平方向において位置決めする杭位置決め具72とを設置するガイド設置工程とを含む。【選択図】図5
To improve accuracy of position and orientation of a pile when the pile is driven to underground.SOLUTION: A method in which at least a piece of pile 30 is manually driven to underground by an operator and at least a piece of brace is fixed to the ground using the pile as a foundation instead of using concrete foundation includes: a pile driving step to fix the pile 30 to the ground by driving the pile 30 to underground; a brace connection step to connect the brace to the pile 30 by using a portion protruding from the ground surface of the pile 30 fixed to the ground after the pile 30 is fixed to the ground; and a guide installation step in which the operator installs a pile guide tool 70 that guides the pile 30 so as to be vertically movable and a pile positioning tool 72 that horizontally positions the pile 30 on the ground surface before driving the pile 30.SELECTED DRAWING: Figure 5
【課題】杭が地中に打ち込まれたときのその杭の位置および向きに関する精度を向上させる。【解決手段】コンクリート基礎を用いる代わりに作業者が手作業で少なくとも1本の杭30を地中に打ち込んでその杭を基礎として用いて少なくとも1本の支柱を地盤に固定する方法は、杭30を地中に打ち込むことにより、杭30を地盤に固定する杭打ち工程と、杭30が地盤に固定された後、地盤に固定されている杭30のうち地表から突き出る部分を用いて前記支柱を杭30に連結する支柱連結工程と、杭30の打ち込みに先立ち、作業者が、杭30を上下動可能にガイドする杭ガイド具70と、地表における杭30を水平方向において位置決めする杭位置決め具72とを設置するガイド設置工程とを含む。【選択図】図5
BRACE FIXING METHOD
支柱固定方法
YOSHIKAWA AKIHIRO (author)
2023-08-21
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
BRACE FIXING UNIT AND FLOOR SUPPORT STRUCTURE USING BRACE FIXING UNIT
European Patent Office | 2020
|BRACE FIXING METAL FITTING, AND BRACE ATTACHING STRUCTURE
European Patent Office | 2022
|