HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION TRESTLE, HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION DEVICE, AND HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION METHOD
To provide a horizontal force distribution structure installation trestle capable of enhancing the safety of work and shortening a work period.SOLUTION: A horizontal force distribution structure installation trestle 50 is for attaching a horizontal force distribution structure 100, which is for limiting the lateral displacement of an upper structure 1 relative to a lower structure 2, to the upper structure 1 and the lower structure 2. The trestle has a base section 60 supported by a lifting section 23 of a base machine 20, and an upper plate 70 laterally slidably connected to the base section 60. Components of the horizontal force distribution structure 100 can be placed on an upper surface of the upper plate 70.SELECTED DRAWING: Figure 1
【課題】作業の安全性を高めるとともに、作業期間を短くすることができる水平力分担構造体設置用架台を提供する。【解決手段】下部構造物2に対する上部構造物1の横方向の変位を制限するための水平力分担構造体100を、上部構造物1および下部構造物2に取り付けるための水平力分担構造体設置用架台50であって、ベースマシン20の昇降部23に支持される基部60と、基部60に対して横方向にスライド可能に連結された上部板70と、を有している。上部板70の上面に水平力分担構造体100の構成部材を載置可能である。【選択図】図1
HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION TRESTLE, HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION DEVICE, AND HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION METHOD
To provide a horizontal force distribution structure installation trestle capable of enhancing the safety of work and shortening a work period.SOLUTION: A horizontal force distribution structure installation trestle 50 is for attaching a horizontal force distribution structure 100, which is for limiting the lateral displacement of an upper structure 1 relative to a lower structure 2, to the upper structure 1 and the lower structure 2. The trestle has a base section 60 supported by a lifting section 23 of a base machine 20, and an upper plate 70 laterally slidably connected to the base section 60. Components of the horizontal force distribution structure 100 can be placed on an upper surface of the upper plate 70.SELECTED DRAWING: Figure 1
【課題】作業の安全性を高めるとともに、作業期間を短くすることができる水平力分担構造体設置用架台を提供する。【解決手段】下部構造物2に対する上部構造物1の横方向の変位を制限するための水平力分担構造体100を、上部構造物1および下部構造物2に取り付けるための水平力分担構造体設置用架台50であって、ベースマシン20の昇降部23に支持される基部60と、基部60に対して横方向にスライド可能に連結された上部板70と、を有している。上部板70の上面に水平力分担構造体100の構成部材を載置可能である。【選択図】図1
HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION TRESTLE, HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION DEVICE, AND HORIZONTAL FORCE DISTRIBUTION STRUCTURE INSTALLATION METHOD
水平力分担構造体設置用架台、水平力分担構造体設置装置および水平力分担構造体設置方法
FURUYA TOMOYUKI (author) / NAKAJIMA TORU (author) / ORUI KENJI (author) / INAGAKI TARO (author) / HAYASHI KOTARO (author)
2023-08-29
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
HORIZONTAL FORCE BEARING MEMBER AND HORIZONTAL FORCE BEARING STRUCTURE
European Patent Office | 2015
|INSTALLATION STRUCTURE BODY AND HORIZONTAL SUPPORT STRUCTURE THEREFOR
European Patent Office | 2017
|End horizontal force detection and protection device for embarkation trestle
European Patent Office | 2023
|