CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a connection structure which can shorten a process while securing the quality of a pile head connection part by reducing a diameter of a hole of a precast superstructure.SOLUTION: A connection structure 10 connects a batter pile 4 with a concrete-made precast superstructure 2. In the connection structure 10, the upper part of a projection tube 11 is buried in the precast superstructure 2 so as to come in contact with concrete of the precast superstructure 2, and the lower part of the projection tube 11 projects downward from the precast superstructure 2. The lower end of the projection tube 11 is inserted into a vertical part of a bent-shaped joint tube 12, and the upper end of the batter pile 4 is inserted into the inclined part of the joint tube 12. A space between the joint tube 12 and the projection tube 11, and the batter pile 4 is filled with a filler 13.SELECTED DRAWING: Figure 3
【課題】プレキャスト上部工の孔の径をより小さくすることで、杭頭接続部の品質を確保した上で工程短縮が可能になる接続構造等を提供する。【解決手段】接続構造10は、斜杭4とコンクリート製のプレキャスト上部工2を接続するものである。接続構造10では、プレキャスト上部工2に、突出管11の上部が、プレキャスト上部工2のコンクリートに接するように埋設され、突出管11の下部がプレキャスト上部工2の下方に突出する。屈曲形状の接合管12の鉛直部分に、突出管11の下端が挿入され、接合管12の傾斜部分に、斜杭4の上端が挿入される。そして、接合管12と突出管11および斜杭4との間に充填材13が充填される。【選択図】図3
CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a connection structure which can shorten a process while securing the quality of a pile head connection part by reducing a diameter of a hole of a precast superstructure.SOLUTION: A connection structure 10 connects a batter pile 4 with a concrete-made precast superstructure 2. In the connection structure 10, the upper part of a projection tube 11 is buried in the precast superstructure 2 so as to come in contact with concrete of the precast superstructure 2, and the lower part of the projection tube 11 projects downward from the precast superstructure 2. The lower end of the projection tube 11 is inserted into a vertical part of a bent-shaped joint tube 12, and the upper end of the batter pile 4 is inserted into the inclined part of the joint tube 12. A space between the joint tube 12 and the projection tube 11, and the batter pile 4 is filled with a filler 13.SELECTED DRAWING: Figure 3
【課題】プレキャスト上部工の孔の径をより小さくすることで、杭頭接続部の品質を確保した上で工程短縮が可能になる接続構造等を提供する。【解決手段】接続構造10は、斜杭4とコンクリート製のプレキャスト上部工2を接続するものである。接続構造10では、プレキャスト上部工2に、突出管11の上部が、プレキャスト上部工2のコンクリートに接するように埋設され、突出管11の下部がプレキャスト上部工2の下方に突出する。屈曲形状の接合管12の鉛直部分に、突出管11の下端が挿入され、接合管12の傾斜部分に、斜杭4の上端が挿入される。そして、接合管12と突出管11および斜杭4との間に充填材13が充填される。【選択図】図3
CONNECTION STRUCTURE AND CONNECTION METHOD
接続構造および接続方法
OURA SHIRO (author) / YOSHIHARA TOMOYOSHI (author)
2023-09-21
Patent
Electronic Resource
Japanese