A platform for research: civil engineering, architecture and urbanism
MEMBER INSTALLATION APPARATUS AND MEMBER INSTALLATION METHOD
To provide a member installation apparatus that is configured to be compact as a whole and can streamline an installation work of the apparatus, and a member installation method using the member installation apparatus.SOLUTION: An installation apparatus for installation of a member includes a frame main body portion 12 that is vertically extendable and contractive, a cantilever overhang portion 14 that is coupled to the frame main body portion 12 and is cantilevered overhanging from the frame main body portion 12, and a suspension portion 16 that is configured to suspend and support the installed member with a predetermined length downward from the cantilever overhang portion 14 and is configured to be movable along a longitudinal direction of the cantilever overhang portion 14. The installation of the installed member to a predetermined position is done by a downward contraction of the frame main body portion 12.SELECTED DRAWING: Figure 1
【課題】全体がコンパクトに構成されているとともに、装置の設置作業を効率化できる部材据付装置および該部材据付装置を用いた部材据付方法を提供する。【解決手段】部材を据え付けるための据付装置であって、上下方向に伸縮可能なフレーム本体部12と、フレーム本体部12に連結していてフレーム本体部12から片持ちで張り出した片持ち張り出し部14と、据え付けられる前記部材を片持ち張り出し部14から下方に所定の長さを以て吊下げ支持するように構成されているとともに、片持ち張り出し部14の長手方向に沿って移動可能に構成された吊り部16と、を備え、据え付けられる前記部材の所定位置への据え付けは、フレーム本体部12の下方向への収縮により行う。【選択図】図1
MEMBER INSTALLATION APPARATUS AND MEMBER INSTALLATION METHOD
To provide a member installation apparatus that is configured to be compact as a whole and can streamline an installation work of the apparatus, and a member installation method using the member installation apparatus.SOLUTION: An installation apparatus for installation of a member includes a frame main body portion 12 that is vertically extendable and contractive, a cantilever overhang portion 14 that is coupled to the frame main body portion 12 and is cantilevered overhanging from the frame main body portion 12, and a suspension portion 16 that is configured to suspend and support the installed member with a predetermined length downward from the cantilever overhang portion 14 and is configured to be movable along a longitudinal direction of the cantilever overhang portion 14. The installation of the installed member to a predetermined position is done by a downward contraction of the frame main body portion 12.SELECTED DRAWING: Figure 1
【課題】全体がコンパクトに構成されているとともに、装置の設置作業を効率化できる部材据付装置および該部材据付装置を用いた部材据付方法を提供する。【解決手段】部材を据え付けるための据付装置であって、上下方向に伸縮可能なフレーム本体部12と、フレーム本体部12に連結していてフレーム本体部12から片持ちで張り出した片持ち張り出し部14と、据え付けられる前記部材を片持ち張り出し部14から下方に所定の長さを以て吊下げ支持するように構成されているとともに、片持ち張り出し部14の長手方向に沿って移動可能に構成された吊り部16と、を備え、据え付けられる前記部材の所定位置への据え付けは、フレーム本体部12の下方向への収縮により行う。【選択図】図1
MEMBER INSTALLATION APPARATUS AND MEMBER INSTALLATION METHOD
部材据付装置および部材据付方法
TANAKA HIROAKI (author) / OTANI YASUHIRO (author) / NAGASHIMA TETSUYUKI (author) / NAKAMURA NOBUHIDE (author) / DOI KAORI (author)
2023-10-20
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
MEMBER INSTALLATION DEVICE AND MEMBER INSTALLATION METHOD
European Patent Office | 2024
|INSTALLATION MEMBER AND METHOD FOR MANUFACTURING INSTALLATION MEMBER
European Patent Office | 2023
|THROATING MEMBER, THROATING MEMBER INSTALLATION JIG, AND THROATING MEMBER INSTALLATION METHOD
European Patent Office | 2018
|UPPER MEMBER INSTALLATION STRUCTURE, AND UPPER MEMBER INSTALLATION METHOD
European Patent Office | 2024
|