To provide a slope restoration method allowing a construction period to be shortened and construction cost to be reduced.SOLUTION: A slope restoration method for restoring a destroyed slope includes an emergency treatment process for preventing a destruction from progressing and a restoring process for retreating a slope through expansion of a top surface by filling soil after the emergency treatment process, wherein the emergency treatment process includes a step A for installing a first stone-filled cage at a position adjacent to a newly constructed slope through the destruction, and the restoring process includes a step B for installing a second stone-filled cage on the ground at a position separated away from the first stone-filled cage and a step C for filling a filler between the first stone-filled cage and the second stone-filled cage.SELECTED DRAWING: Figure 6
【課題】工事期間を短くできて工事コストも低減することができる法面復旧工法を提供する。【解決手段】崩壊した法面を復旧する法面復旧工法であって、崩壊が進行することを防止する応急処置工程と、応急処置工程の後で盛土を行って天面を拡げ法面を後退させる復旧工程とを備えており、前記応急処置工程では、崩壊により新たに形成された法面に隣り合う位置に第1の石詰籠を設置する工程Aを含み、前記復旧工程は、前記第1の石詰籠から離れた位置の地盤に第2の石詰籠を設置する工程Bと、前記第1の石詰籠と前記第2の石詰籠との間に充填材を充填する工程Cとを含んでいる。【選択図】図6
To provide a slope restoration method allowing a construction period to be shortened and construction cost to be reduced.SOLUTION: A slope restoration method for restoring a destroyed slope includes an emergency treatment process for preventing a destruction from progressing and a restoring process for retreating a slope through expansion of a top surface by filling soil after the emergency treatment process, wherein the emergency treatment process includes a step A for installing a first stone-filled cage at a position adjacent to a newly constructed slope through the destruction, and the restoring process includes a step B for installing a second stone-filled cage on the ground at a position separated away from the first stone-filled cage and a step C for filling a filler between the first stone-filled cage and the second stone-filled cage.SELECTED DRAWING: Figure 6
【課題】工事期間を短くできて工事コストも低減することができる法面復旧工法を提供する。【解決手段】崩壊した法面を復旧する法面復旧工法であって、崩壊が進行することを防止する応急処置工程と、応急処置工程の後で盛土を行って天面を拡げ法面を後退させる復旧工程とを備えており、前記応急処置工程では、崩壊により新たに形成された法面に隣り合う位置に第1の石詰籠を設置する工程Aを含み、前記復旧工程は、前記第1の石詰籠から離れた位置の地盤に第2の石詰籠を設置する工程Bと、前記第1の石詰籠と前記第2の石詰籠との間に充填材を充填する工程Cとを含んでいる。【選択図】図6
SLOPE RESTORATION METHOD
法面復旧工法
MORIYA KAN (author)
2023-11-21
Patent
Electronic Resource
Japanese
Rock slope ecological restoration system and rock slope ecological restoration method
European Patent Office | 2022
|European Patent Office | 2024
|