DESIGN METHOD FOR CONCRETE-FILLED STEEL-PIPE COLUMN
To provide a method for designing a concrete-filled steel-pipe column, which can provide a concrete-filled steel-pipe column that eliminates the need for the installation of a fire proof coating and reduces the influence on the structural resistance of the column due to fire heating.SOLUTION: A design method for a concrete-filled steel-pipe column is applied to a concrete-filled steel-pipe column 2 which is composed of a steel pipe 21 and filled concrete 22 filled inside the steel pipe 21 and is provided in a building 1 having three or more stories except a basement. When the concrete-filled steel-pipe column 2 is heated, the following formula (1) is satisfied, where Ace is a cross-sectional area of an effective cross-section in the transverse direction excluding a portion where proof stress is reduced by heating of the filled concrete 22, Fc is a design specification strength of the filled concrete 22 in the effective cross-section, and LN is a long-term allowable compressive force of the steel pipe 21.[Formula 1].SELECTED DRAWING: Figure 1
【課題】耐火被覆の設置が不要であり、火災の加熱による柱の構造耐力への影響を低減するコンクリート充填鋼管柱を提供できるコンクリート充填鋼管柱の設計法を提供する。【解決手段】鋼管21と、鋼管21の内部に充填された充填コンクリート22と、で構成され、地階を除いて3以上の階層を有する建築物1に備えられるコンクリート充填鋼管柱2に適用されるコンクリート充填鋼管柱の設計法であって、コンクリート充填鋼管柱2が加熱された際に、充填コンクリート22の加熱により耐力が低下する部分を除いた横断方向の有効断面の断面積をAce、有効断面内の充填コンクリート22の設計基準強度をFc、鋼管21の長期許容圧縮力をLNとしたとき、次の式(1)が成立することを特徴とする。[数1]TIFF2023167162000015.tif11170【選択図】図1
DESIGN METHOD FOR CONCRETE-FILLED STEEL-PIPE COLUMN
To provide a method for designing a concrete-filled steel-pipe column, which can provide a concrete-filled steel-pipe column that eliminates the need for the installation of a fire proof coating and reduces the influence on the structural resistance of the column due to fire heating.SOLUTION: A design method for a concrete-filled steel-pipe column is applied to a concrete-filled steel-pipe column 2 which is composed of a steel pipe 21 and filled concrete 22 filled inside the steel pipe 21 and is provided in a building 1 having three or more stories except a basement. When the concrete-filled steel-pipe column 2 is heated, the following formula (1) is satisfied, where Ace is a cross-sectional area of an effective cross-section in the transverse direction excluding a portion where proof stress is reduced by heating of the filled concrete 22, Fc is a design specification strength of the filled concrete 22 in the effective cross-section, and LN is a long-term allowable compressive force of the steel pipe 21.[Formula 1].SELECTED DRAWING: Figure 1
【課題】耐火被覆の設置が不要であり、火災の加熱による柱の構造耐力への影響を低減するコンクリート充填鋼管柱を提供できるコンクリート充填鋼管柱の設計法を提供する。【解決手段】鋼管21と、鋼管21の内部に充填された充填コンクリート22と、で構成され、地階を除いて3以上の階層を有する建築物1に備えられるコンクリート充填鋼管柱2に適用されるコンクリート充填鋼管柱の設計法であって、コンクリート充填鋼管柱2が加熱された際に、充填コンクリート22の加熱により耐力が低下する部分を除いた横断方向の有効断面の断面積をAce、有効断面内の充填コンクリート22の設計基準強度をFc、鋼管21の長期許容圧縮力をLNとしたとき、次の式(1)が成立することを特徴とする。[数1]TIFF2023167162000015.tif11170【選択図】図1
DESIGN METHOD FOR CONCRETE-FILLED STEEL-PIPE COLUMN
コンクリート充填鋼管柱の設計法
KONDO SHIRO (author) / NAKAMURA AKITAKE (author) / SATO TAIYU (author)
2023-11-24
Patent
Electronic Resource
Japanese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
European Patent Office | 2019
|European Patent Office | 2018
|CONSTRUCTION METHOD OF CONCRETE FILLED STEEL-PIPE COLUMN
European Patent Office | 2020
|