CONSTRUCTION METHOD OF CONCRETE FILLED STEEL-PIPE COLUMN
To provide a construction method of a concrete filled steel-pipe column that can fill the inside of steel-pipe with ultra high-strength concrete having compression strength over 100 N/mmby simple configuration.SOLUTION: A construction method of concrete filled steel-pipe column is a method of constructing a concrete filling steel-pipe column 1 by filling the inside of steel-pipe 10 with ultra high-strength concrete having compression strength over 100 N/mm. The method includes: steps S1, S2 of erecting the steel-pipe 10 to insert steel concrete piping 30 provided with an air vent hole 31 into the inside of steel-pipe 10 from above and fix at a frame scaffold 20; and a step S3 of filling the steel-pipe 10 with the ultra high-strength concrete toward the upper side from the lower side by pressure-feeding the ultra high-strength concrete into the inside of concrete piping 30 using a concrete pump vehicle 22.SELECTED DRAWING: Figure 2
【課題】圧縮強度が100N/mm2を超える超高強度コンクリートを簡易な構成で鋼管内に充填できる、コンクリート充填鋼管柱の構築方法を提供すること。【解決手段】コンクリート充填鋼管柱の構築方法は、圧縮強度が100N/mm2を超える超高強度コンクリートを鋼管10内に充填してコンクリート充填鋼管柱1を構築する方法であって、鋼管10を立設し、空気抜き孔31が設けられた鋼製のコンクリート配管30を鋼管10の内部に上から挿入するとともに、枠組足場20に固定するステップS1、S2と、超高強度コンクリートをコンクリートポンプ車22によりコンクリート配管30内に圧送することで、鋼管10の下側から上側に向かって超高強度コンクリートを充填するステップS3と、を含む。【選択図】図2
CONSTRUCTION METHOD OF CONCRETE FILLED STEEL-PIPE COLUMN
To provide a construction method of a concrete filled steel-pipe column that can fill the inside of steel-pipe with ultra high-strength concrete having compression strength over 100 N/mmby simple configuration.SOLUTION: A construction method of concrete filled steel-pipe column is a method of constructing a concrete filling steel-pipe column 1 by filling the inside of steel-pipe 10 with ultra high-strength concrete having compression strength over 100 N/mm. The method includes: steps S1, S2 of erecting the steel-pipe 10 to insert steel concrete piping 30 provided with an air vent hole 31 into the inside of steel-pipe 10 from above and fix at a frame scaffold 20; and a step S3 of filling the steel-pipe 10 with the ultra high-strength concrete toward the upper side from the lower side by pressure-feeding the ultra high-strength concrete into the inside of concrete piping 30 using a concrete pump vehicle 22.SELECTED DRAWING: Figure 2
【課題】圧縮強度が100N/mm2を超える超高強度コンクリートを簡易な構成で鋼管内に充填できる、コンクリート充填鋼管柱の構築方法を提供すること。【解決手段】コンクリート充填鋼管柱の構築方法は、圧縮強度が100N/mm2を超える超高強度コンクリートを鋼管10内に充填してコンクリート充填鋼管柱1を構築する方法であって、鋼管10を立設し、空気抜き孔31が設けられた鋼製のコンクリート配管30を鋼管10の内部に上から挿入するとともに、枠組足場20に固定するステップS1、S2と、超高強度コンクリートをコンクリートポンプ車22によりコンクリート配管30内に圧送することで、鋼管10の下側から上側に向かって超高強度コンクリートを充填するステップS3と、を含む。【選択図】図2
CONSTRUCTION METHOD OF CONCRETE FILLED STEEL-PIPE COLUMN
コンクリート充填鋼管柱の構築方法
AKADA TAKUMI (author) / FUKUI HIDEHIRO (author) / NAKAMURA TOSHIYUKI (author) / TSUBOTA REI (author)
2020-04-09
Patent
Electronic Resource
Japanese
European Patent Office | 2019
|CONNECTING STRUCTURE, CONCRETE-FILLED STEEL PIPE COLUMN, AND CONSTRUCTION METHOD
European Patent Office | 2020
|European Patent Office | 2018
|