SUSPENDED SCAFFOLD ASSEMBLING METHOD
To provide a suspended scaffold assembling method remarkably heightened in assembling work efficiency of a suspended scaffold.SOLUTION: Multiple cables 5 are suspended and fixed to lower flanges 2a of a pair of flange members 2 by a worker A of a moving scaffold device 1 so as to be separated in the direction orthogonal to the moving direction of the moving scaffold device 1. Parent and child members 6 extending in the orthogonal direction between the cables 5 are connected, and while moving the moving scaffold device 1, the cables 5 and the parent and child members 6 are again connected with intervals from the cables 5 and the parent and child members 6 in the downstream side. Multiple laying members 8 are bridged between the parent and child members 6, and floor materials 9 are set on the laying members 8 to assemble a suspended scaffold 10.SELECTED DRAWING: Figure 5
【課題】吊り足場の組立作業効率を著しく高めることが可能な吊り足場組立工法を提供する。【解決手段】移動足場装置1の作業員Aによって一対のフランジ部材2の下フランジ2aに複数の索条5を移動足場装置1の移動方向に対して直交する方向に離間するように吊下げて固定し、これらの索条5間に直交する方向に延びるおやご部材6を連結し、移動足場装置1を移動させながらその下流側で索条5及びおやご部材6に対して間隔をあけて再度索条5及びおやご部材6を連結していき、これらのおやご部材6間に複数のころばし部材8を架け渡し、これらのころばし部材8上に床材9を設置して吊り足場10を組み立てていくようにした。【選択図】図5
SUSPENDED SCAFFOLD ASSEMBLING METHOD
To provide a suspended scaffold assembling method remarkably heightened in assembling work efficiency of a suspended scaffold.SOLUTION: Multiple cables 5 are suspended and fixed to lower flanges 2a of a pair of flange members 2 by a worker A of a moving scaffold device 1 so as to be separated in the direction orthogonal to the moving direction of the moving scaffold device 1. Parent and child members 6 extending in the orthogonal direction between the cables 5 are connected, and while moving the moving scaffold device 1, the cables 5 and the parent and child members 6 are again connected with intervals from the cables 5 and the parent and child members 6 in the downstream side. Multiple laying members 8 are bridged between the parent and child members 6, and floor materials 9 are set on the laying members 8 to assemble a suspended scaffold 10.SELECTED DRAWING: Figure 5
【課題】吊り足場の組立作業効率を著しく高めることが可能な吊り足場組立工法を提供する。【解決手段】移動足場装置1の作業員Aによって一対のフランジ部材2の下フランジ2aに複数の索条5を移動足場装置1の移動方向に対して直交する方向に離間するように吊下げて固定し、これらの索条5間に直交する方向に延びるおやご部材6を連結し、移動足場装置1を移動させながらその下流側で索条5及びおやご部材6に対して間隔をあけて再度索条5及びおやご部材6を連結していき、これらのおやご部材6間に複数のころばし部材8を架け渡し、これらのころばし部材8上に床材9を設置して吊り足場10を組み立てていくようにした。【選択図】図5
SUSPENDED SCAFFOLD ASSEMBLING METHOD
吊り足場組立工法
SHIMOSADA NORIYUKI (author) / NAKAMURA TAKASHI (author) / KUBO MINORU (author) / MIKOSHIBA HIDEAKI (author) / OKA SHIGEHIRO (author) / JOTATSU KOTA (author) / AOKI SHUNJI (author) / SATO SEIJI (author)
2023-12-01
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
SUSPENDED SCAFFOLD DEVICE AND METHOD FOR ASSEMBLING SUSPENDED SCAFFOLD DEVICE
European Patent Office | 2023
|SUSPENDED SCAFFOLD EQUIPMENT AND SUSPENDED SCAFFOLD OPERATION METHOD
European Patent Office | 2022
|SUSPENDED SCAFFOLD AND METHOD FOR INSTALLING SUSPENDED SCAFFOLD
European Patent Office | 2023
|SUSPENDED SCAFFOLD ASSEMBLY METHOD AND SUSPENDED SCAFFOLD ASSEMBLY APPARATUS
European Patent Office | 2024
|