To provide a construction plan support device estimating a removed sludge amount during a sludge removal work accompanied by water injection.SOLUTION: A construction plan support device 100 used in a sludge removal work accompanied by water injection comprises: data input means 110 for inputting predetermined scheduled construction data of unconstructed works; data storage means 120 for storing construction result data including scheduled construction data and water injection rate data of a plurality of already constructed works; data reading means 130 for reading construction result data of a predetermined plurality of already constructed works from the data storage means 120; water injection rate prediction means 130 for predicting water injection rate of the unconstructed works based on the read construction result data of the plurality of already constructed works from the input scheduled construction data of unconstructed works; and removed sludge amount estimation means 130 for estimating a removed sludge amount in the unconstructed works from the predicted water injection rate.SELECTED DRAWING: Figure 2
【課題】注水を伴って排泥を行う工事における排泥量を見積もる工事計画支援装置を提供する。【解決手段】注水を伴って排泥を行う工事に用いられる工事計画支援装置100は、未施工の工事の所定の施工予定データを入力するためのデータ入力手段110と、複数の既施工の工事の施工予定データ及び注水率データを含む施工実績データを格納するデータ格納手段120と、データ格納手段120から所定の複数の既施工の工事の施工実績データを読み取るデータ読取手段130と、入力された未施工の工事の施工予定データから、読み取った複数の既施工の工事の施工実績データに基づいて、未施工の工事の注水率を予測する注水率予測手段130と、予測した注水率から、未施工の工事の排泥量を見積もる排泥量見積手段130とを備える。【選択図】図2
To provide a construction plan support device estimating a removed sludge amount during a sludge removal work accompanied by water injection.SOLUTION: A construction plan support device 100 used in a sludge removal work accompanied by water injection comprises: data input means 110 for inputting predetermined scheduled construction data of unconstructed works; data storage means 120 for storing construction result data including scheduled construction data and water injection rate data of a plurality of already constructed works; data reading means 130 for reading construction result data of a predetermined plurality of already constructed works from the data storage means 120; water injection rate prediction means 130 for predicting water injection rate of the unconstructed works based on the read construction result data of the plurality of already constructed works from the input scheduled construction data of unconstructed works; and removed sludge amount estimation means 130 for estimating a removed sludge amount in the unconstructed works from the predicted water injection rate.SELECTED DRAWING: Figure 2
【課題】注水を伴って排泥を行う工事における排泥量を見積もる工事計画支援装置を提供する。【解決手段】注水を伴って排泥を行う工事に用いられる工事計画支援装置100は、未施工の工事の所定の施工予定データを入力するためのデータ入力手段110と、複数の既施工の工事の施工予定データ及び注水率データを含む施工実績データを格納するデータ格納手段120と、データ格納手段120から所定の複数の既施工の工事の施工実績データを読み取るデータ読取手段130と、入力された未施工の工事の施工予定データから、読み取った複数の既施工の工事の施工実績データに基づいて、未施工の工事の注水率を予測する注水率予測手段130と、予測した注水率から、未施工の工事の排泥量を見積もる排泥量見積手段130とを備える。【選択図】図2
CONSTRUCTION PLAN SUPPORT DEVICE
工事計画支援装置
OMAE TOMOYA (author)
2023-12-20
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
BUILDING CONSTRUCTION PLAN SUPPORT SYSTEM AND BUILDING CONSTRUCTION PLAN SUPPORT METHOD, AND PROGRAM
European Patent Office | 2023
|CONSTRUCTION PLAN PREPARATION SUPPORT SYSTEM AND SUPPORT METHOD THEREFOR
European Patent Office | 2023
|CONSTRUCTION SUPPORT DEVICE AND CONSTRUCTION SUPPORT METHOD
European Patent Office | 2024
|CONSTRUCTION SUPPORT DEVICE AND CONSTRUCTION SUPPORT PROGRAM
European Patent Office | 2020
|CONSTRUCTION SUPPORT DEVICE AND CONSTRUCTION SUPPORT METHOD
European Patent Office | 2023
|