A platform for research: civil engineering, architecture and urbanism
EXCAVATION ROUTE GENERATION SYSTEM
To generate an appropriate excavation route according to a nature of an excavation target.SOLUTION: An excavation route generation system 1 is used for a work machine 10 provided with an attachment 20 having a bucket 25. The excavation route generation system 1 comprises a property acquisition section 73 and an excavation route generation section 75. The property acquisition section 73 acquires a hardness of an excavation target A and a shape of a surface of the excavation target A. The excavation route generation section 75 generates an excavation route E. The excavation route E is a target route of the bucket 25 when excavating the excavation target A. The excavation route generation section 75 changes an excavation depth D of the bucket 25 with respect to a surface As of the excavation target A according to the hardness of the excavation target A acquired by the property acquisition section 73.SELECTED DRAWING: Figure 3
【課題】掘削対象物の性質に応じた適切な掘削経路を生成する。【解決手段】掘削経路生成システム1は、バケット25を有するアタッチメント20を備える作業機械10に用いられる。掘削経路生成システム1は、性質取得部73と、掘削経路生成部75と、を備える。性質取得部73は、掘削対象物Aの硬度、および、掘削対象物Aの表面の形状を取得する。掘削経路生成部75は、掘削経路Eを生成する。掘削経路Eは、掘削対象物Aを掘削するときのバケット25の目標経路である。掘削経路生成部75は、性質取得部73に取得された掘削対象物Aの硬度に応じて、掘削対象物Aの表面Asに対するバケット25の掘削深度Dを変化させる。【選択図】図3
EXCAVATION ROUTE GENERATION SYSTEM
To generate an appropriate excavation route according to a nature of an excavation target.SOLUTION: An excavation route generation system 1 is used for a work machine 10 provided with an attachment 20 having a bucket 25. The excavation route generation system 1 comprises a property acquisition section 73 and an excavation route generation section 75. The property acquisition section 73 acquires a hardness of an excavation target A and a shape of a surface of the excavation target A. The excavation route generation section 75 generates an excavation route E. The excavation route E is a target route of the bucket 25 when excavating the excavation target A. The excavation route generation section 75 changes an excavation depth D of the bucket 25 with respect to a surface As of the excavation target A according to the hardness of the excavation target A acquired by the property acquisition section 73.SELECTED DRAWING: Figure 3
【課題】掘削対象物の性質に応じた適切な掘削経路を生成する。【解決手段】掘削経路生成システム1は、バケット25を有するアタッチメント20を備える作業機械10に用いられる。掘削経路生成システム1は、性質取得部73と、掘削経路生成部75と、を備える。性質取得部73は、掘削対象物Aの硬度、および、掘削対象物Aの表面の形状を取得する。掘削経路生成部75は、掘削経路Eを生成する。掘削経路Eは、掘削対象物Aを掘削するときのバケット25の目標経路である。掘削経路生成部75は、性質取得部73に取得された掘削対象物Aの硬度に応じて、掘削対象物Aの表面Asに対するバケット25の掘削深度Dを変化させる。【選択図】図3
EXCAVATION ROUTE GENERATION SYSTEM
掘削経路生成システム
MIYAZAKI RYUNOSUKE (author) / TERAUCHI KENICHI (author)
2024-01-09
Patent
Electronic Resource
Japanese
IPC:
E02F
Baggern
,
DREDGING
EXCAVATION TRAJECTORY GENERATION METHOD, SYSTEM, AND EXCAVATION TRAJECTORY GENERATION DEVICE
European Patent Office | 2021
|METHOD FOR GENERATING EXCAVATION TRAJECTORY, SYSTEM, AND EXCAVATION TRAJECTORY GENERATION APPARATUS
European Patent Office | 2022
|EXCAVATION MACHINE, METHOD FOR CONTROLLING EXCAVATION MACHINE, AND EXCAVATION SYSTEM
European Patent Office | 2018
|