A platform for research: civil engineering, architecture and urbanism
PRECAST FLOOR SLAB INSTALLATION JIG AND PRECAST FLOOR SLAB CONNECTION METHOD
To provide a precast floor slab installation jig capable of preventing the occurrence of a crack in a precast floor slab due to frictional force generated between the precast floor slab and a girder.SOLUTION: A precast floor slab installation jig 1 is provided with a support bolt 5 and a hanging mechanism 7 connected to the support bolt, the support bolt 5 is inserted through a hollow pipe 15 embedded in the precast floor slab 2 as a through opening into the through opening, and a base part 6 is abutted on a mounting surface 4 of a girder 3 on which the precast floor slab is mounted, and the hanging mechanism 7 can hang the precast floor slab 2 by taking a reaction force from the girder 3 through the support bolt 5. In the hanging mechanism 7, since a PC steel material 22 is elastically deformed, the precast floor slab 2 can move in the in-plane direction up to a moving width due to a clearance δd extending between the peripheral surface of the support bolt 5 and the inner peripheral surface of the hollow pipe 15.SELECTED DRAWING: Figure 1
【課題】プレキャスト床版と桁との間に生じる摩擦力でプレキャスト床版にひび割れが発生するのを防止可能なプレキャスト床版設置用治具を提供する。【解決手段】本発明に係るプレキャスト床版設置用治具1は、支持ボルト5と該支持ボルトに連結された吊持機構7とを備えていて、支持ボルト5は、プレキャスト床版2に埋設された中空管15を貫通開口として該貫通開口に挿通してあるとともに、該プレキャスト床版が架け渡される桁3の載置面4に基部6がそれぞれ当接されるようになっており、吊持機構7は、支持ボルト5を介して桁3から反力をとることでプレキャスト床版2を吊持できるようになっている。吊持機構7は、PC鋼材22が弾性変形するため、支持ボルト5の周面と中空管15の内周面との間に拡がるクリアランスδdによる移動幅を限度として、プレキャスト床版2が面内方向移動できるようになっている。【選択図】 図1
PRECAST FLOOR SLAB INSTALLATION JIG AND PRECAST FLOOR SLAB CONNECTION METHOD
To provide a precast floor slab installation jig capable of preventing the occurrence of a crack in a precast floor slab due to frictional force generated between the precast floor slab and a girder.SOLUTION: A precast floor slab installation jig 1 is provided with a support bolt 5 and a hanging mechanism 7 connected to the support bolt, the support bolt 5 is inserted through a hollow pipe 15 embedded in the precast floor slab 2 as a through opening into the through opening, and a base part 6 is abutted on a mounting surface 4 of a girder 3 on which the precast floor slab is mounted, and the hanging mechanism 7 can hang the precast floor slab 2 by taking a reaction force from the girder 3 through the support bolt 5. In the hanging mechanism 7, since a PC steel material 22 is elastically deformed, the precast floor slab 2 can move in the in-plane direction up to a moving width due to a clearance δd extending between the peripheral surface of the support bolt 5 and the inner peripheral surface of the hollow pipe 15.SELECTED DRAWING: Figure 1
【課題】プレキャスト床版と桁との間に生じる摩擦力でプレキャスト床版にひび割れが発生するのを防止可能なプレキャスト床版設置用治具を提供する。【解決手段】本発明に係るプレキャスト床版設置用治具1は、支持ボルト5と該支持ボルトに連結された吊持機構7とを備えていて、支持ボルト5は、プレキャスト床版2に埋設された中空管15を貫通開口として該貫通開口に挿通してあるとともに、該プレキャスト床版が架け渡される桁3の載置面4に基部6がそれぞれ当接されるようになっており、吊持機構7は、支持ボルト5を介して桁3から反力をとることでプレキャスト床版2を吊持できるようになっている。吊持機構7は、PC鋼材22が弾性変形するため、支持ボルト5の周面と中空管15の内周面との間に拡がるクリアランスδdによる移動幅を限度として、プレキャスト床版2が面内方向移動できるようになっている。【選択図】 図1
PRECAST FLOOR SLAB INSTALLATION JIG AND PRECAST FLOOR SLAB CONNECTION METHOD
プレキャスト床版設置用治具及びプレキャスト床版の連結方法
TANAKA KOICHI (author) / SASAKI KAZUNARI (author)
2024-02-01
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
PRECAST FLOOR SLAB INSTALLATION METHOD AND PRECAST FLOOR SLAB
European Patent Office | 2018
|PRECAST FLOOR SLAB CONNECTION STRUCTURE, PRECAST FLOOR SLAB SYSTEM, AND BRIDGE STRUCTURE
European Patent Office | 2016
|WATERPROOF STRUCTURE OF PRECAST FLOOR SLAB AND CONNECTION STRUCTURE OF PRECAST FLOOR SLAB
European Patent Office | 2024
|PRECAST FLOOR SLAB JOINT STRUCTURE AND PRECAST FLOOR SLAB
European Patent Office | 2021
|