A platform for research: civil engineering, architecture and urbanism
To sufficiently secure a storage space of a popped up front window.SOLUTION: A cabin of a construction machine includes: right and left front pillars 12; right and left rear pillars 13; a first center pillar 14 positioned on one side of right and left sides; a first cross member 50 for laying the rear pillar positioned on the other side of right and left sides and the first center pillar; a roof rail 16 for connecting the front pillars and the rear pillars on each of the right and left sides; a guide rail 27 provided along the front pillars and the roof rail on each of the right and left sides; and a popping up type front window 25 which is movable along the right and left guide rails. The first cross member is positioned at a position lower than the part of the guide rail provided on the roof rail.SELECTED DRAWING: Figure 3
【課題】跳ね上げられた前窓の収納スペースを十分確保する。【解決手段】建設機械のキャビンは、左右のフロントピラー12と、左右のリヤピラー13と、左右の一方側に位置された第1センターピラー14と、左右の他方側に位置されたリヤピラーと第1センターピラーとを掛け渡して連結する第1クロスメンバ50と、左右のそれぞれにおいてフロントピラーとリヤピラーを連結するルーフレール16と、左右のそれぞれにおいてフロントピラーとルーフレールに沿って設けられたガイドレール27と、左右のガイドレールに沿って移動可能な跳ね上げ式の前窓25とを備える。第1クロスメンバは、ルーフレールに沿って設けられたガイドレールの部分よりも低い位置に位置されている。【選択図】図3
To sufficiently secure a storage space of a popped up front window.SOLUTION: A cabin of a construction machine includes: right and left front pillars 12; right and left rear pillars 13; a first center pillar 14 positioned on one side of right and left sides; a first cross member 50 for laying the rear pillar positioned on the other side of right and left sides and the first center pillar; a roof rail 16 for connecting the front pillars and the rear pillars on each of the right and left sides; a guide rail 27 provided along the front pillars and the roof rail on each of the right and left sides; and a popping up type front window 25 which is movable along the right and left guide rails. The first cross member is positioned at a position lower than the part of the guide rail provided on the roof rail.SELECTED DRAWING: Figure 3
【課題】跳ね上げられた前窓の収納スペースを十分確保する。【解決手段】建設機械のキャビンは、左右のフロントピラー12と、左右のリヤピラー13と、左右の一方側に位置された第1センターピラー14と、左右の他方側に位置されたリヤピラーと第1センターピラーとを掛け渡して連結する第1クロスメンバ50と、左右のそれぞれにおいてフロントピラーとリヤピラーを連結するルーフレール16と、左右のそれぞれにおいてフロントピラーとルーフレールに沿って設けられたガイドレール27と、左右のガイドレールに沿って移動可能な跳ね上げ式の前窓25とを備える。第1クロスメンバは、ルーフレールに沿って設けられたガイドレールの部分よりも低い位置に位置されている。【選択図】図3
CABIN OF CONSTRUCTION MACHINE
建設機械のキャビン
YUCHI TAKESHIGE (author)
2024-03-07
Patent
Electronic Resource
Japanese