A platform for research: civil engineering, architecture and urbanism
FRP TENDON FIXATION METHOD AND FRP TENDON FIXATION STRUCTURE
To enable a filler to be charged across entire length of a tendon insertion hole having length disallowing a shrinkage-compensating mortar to be charged.SOLUTION: A fixation method of an aramid FRP tendon 3 in a pre-stressed concrete member (1) includes the steps of injecting a partition wall filler (5) to construct a first partition wall 6A at a predetermined position from a left end 4a of a tendon insertion hole 4, injecting the partition wall filler to construct a second partition wall 6B at a predetermined position from a right end 4b of the tendon insertion hole 4, injecting a first filler (7) for fixing the FRP tendon to a precast member (2) to a first end section S1 from one end (4a) of the tendon insertion hole 4 to the first partition wall, injecting a second filler (8) to a central section S3 from the first partition wall to the second partition wall, and injecting the first filler to a second end section S2 from the other end (4b) of the tendon insertion hole 4 to the second partition wall.SELECTED DRAWING: Figure 4
【課題】無収縮モルタルを充填できない長さの緊張材挿通孔に、全長に亘って充填材を充填できるようにする。【解決手段】プレストレストコンクリート部材(1)におけるアラミドFRP緊張材3の定着方法は、緊張材挿通孔4の左端4aから所定の位置に第1仕切り壁6Aを構築するべく仕切り壁用充填材(5)を注入するステップと、緊張材挿通孔4の右端4bから所定の位置に第2仕切り壁6Bを構築するべく仕切り壁用充填材を注入するステップと、緊張材挿通孔4の一端(4a)から第1仕切り壁までの第1端部区間S1に、FRP緊張材をプレキャスト部材(2)に定着させるための第1充填材(7)を注入するステップと、第1仕切り壁から第2仕切り壁までの中央区間S3に第2充填材(8)を注入するステップと、緊張材挿通孔4の他端(4b)から第2仕切り壁までの第2端部区間S2に第1充填材を注入するステップとを含む。【選択図】図4
FRP TENDON FIXATION METHOD AND FRP TENDON FIXATION STRUCTURE
To enable a filler to be charged across entire length of a tendon insertion hole having length disallowing a shrinkage-compensating mortar to be charged.SOLUTION: A fixation method of an aramid FRP tendon 3 in a pre-stressed concrete member (1) includes the steps of injecting a partition wall filler (5) to construct a first partition wall 6A at a predetermined position from a left end 4a of a tendon insertion hole 4, injecting the partition wall filler to construct a second partition wall 6B at a predetermined position from a right end 4b of the tendon insertion hole 4, injecting a first filler (7) for fixing the FRP tendon to a precast member (2) to a first end section S1 from one end (4a) of the tendon insertion hole 4 to the first partition wall, injecting a second filler (8) to a central section S3 from the first partition wall to the second partition wall, and injecting the first filler to a second end section S2 from the other end (4b) of the tendon insertion hole 4 to the second partition wall.SELECTED DRAWING: Figure 4
【課題】無収縮モルタルを充填できない長さの緊張材挿通孔に、全長に亘って充填材を充填できるようにする。【解決手段】プレストレストコンクリート部材(1)におけるアラミドFRP緊張材3の定着方法は、緊張材挿通孔4の左端4aから所定の位置に第1仕切り壁6Aを構築するべく仕切り壁用充填材(5)を注入するステップと、緊張材挿通孔4の右端4bから所定の位置に第2仕切り壁6Bを構築するべく仕切り壁用充填材を注入するステップと、緊張材挿通孔4の一端(4a)から第1仕切り壁までの第1端部区間S1に、FRP緊張材をプレキャスト部材(2)に定着させるための第1充填材(7)を注入するステップと、第1仕切り壁から第2仕切り壁までの中央区間S3に第2充填材(8)を注入するステップと、緊張材挿通孔4の他端(4b)から第2仕切り壁までの第2端部区間S2に第1充填材を注入するステップとを含む。【選択図】図4
FRP TENDON FIXATION METHOD AND FRP TENDON FIXATION STRUCTURE
FRP緊張材の定着方法及びFRP緊張材の定着構造
KANO TAKESHI (author) / FUJIOKA TAISUKE (author) / SHINOZAKI HIROO (author) / NAGAMOTO NAOKI (author) / YOKOYAMA KAZUAKI (author) / MATSUO YUSUKE (author)
2024-05-01
Patent
Electronic Resource
Japanese
FRP TENDON FIXATION METHOD AND FRP TENDON FIXATION STRUCTURE
European Patent Office | 2024
|FIXATION METHOD OF TENDON, TENSILE FORCE ADJUSTMENT METHOD OF TENDON AND JACK DEVICE
European Patent Office | 2021
|ROTATION-RESTRAINING STRUCTURE FOR TENDON COUPLER, AND TENDON COUPLER
European Patent Office | 2016
|TENDON ARRANGEMENT DEVICE AND ARRANGING METHOD FOR TENDON
European Patent Office | 2018
|