WIRING STRUCTURE OF FEEDER CABLE AND WIRING METHOD
To prevent a feeder cable to a lifting pallet from interfering with the surrounding facilities.SOLUTION: A wiring structure 10 of a feeder cable includes a feeder duct 12 that is formed of continuous multiple nodes 14, with a feeder cable 50 inserted into each node 14. The multiple nodes 14 are connected to be folded in a zigzag manner, and are roughly linear when a lifting pallet 64 is present at the lowermost position, and are folded in a vertically overlapping state when the lifting pallet 64 is present at the uppermost position. By such a structure, the multiple nodes 14 act like a link mechanism, and the feeder cable 50 guided by the feeder duct 12 deforms to the roughly linear state and the folded state, according to lifting movement of the lifting pallet 64. Accordingly, when the lifting pallet 64 is present at the uppermost position or in the course of reaching the state, the feeder cable 50 does not suspend from the lifting pallet 64, to prevent the feeder cable 50 from interfering with the surrounding facilities.SELECTED DRAWING: Figure 1
【課題】昇降パレットへの給電ケーブルが周囲設備に干渉することを防止する。【解決手段】給電ケーブルの配線構造10は、連続した複数の節14からなり、各節14の内部に給電ケーブル50が挿通される給電ダクト12を含み、複数の節14は、ジグザグ状に折れ曲がるように接続され、昇降パレット64がその最下位置にあるときに大略直線状になり、昇降パレット64がその最上位置にあるときに上下に重なって折り畳まれる。このような構成により、複数の節14がリンク機構の如く動作し、給電ダクト12によって案内される給電ケーブル50も、昇降パレット64の昇降移動に合わせて大略直線状及び折り畳み状態へと変形する。従って、昇降パレット64が最上位置にあるときやそこに至るまでの過程において、給電ケーブル50が昇降パレット64から垂れ下がるようなことはなく、給電ケーブル50が周囲設備に干渉することを防止することが可能となる。【選択図】図1
WIRING STRUCTURE OF FEEDER CABLE AND WIRING METHOD
To prevent a feeder cable to a lifting pallet from interfering with the surrounding facilities.SOLUTION: A wiring structure 10 of a feeder cable includes a feeder duct 12 that is formed of continuous multiple nodes 14, with a feeder cable 50 inserted into each node 14. The multiple nodes 14 are connected to be folded in a zigzag manner, and are roughly linear when a lifting pallet 64 is present at the lowermost position, and are folded in a vertically overlapping state when the lifting pallet 64 is present at the uppermost position. By such a structure, the multiple nodes 14 act like a link mechanism, and the feeder cable 50 guided by the feeder duct 12 deforms to the roughly linear state and the folded state, according to lifting movement of the lifting pallet 64. Accordingly, when the lifting pallet 64 is present at the uppermost position or in the course of reaching the state, the feeder cable 50 does not suspend from the lifting pallet 64, to prevent the feeder cable 50 from interfering with the surrounding facilities.SELECTED DRAWING: Figure 1
【課題】昇降パレットへの給電ケーブルが周囲設備に干渉することを防止する。【解決手段】給電ケーブルの配線構造10は、連続した複数の節14からなり、各節14の内部に給電ケーブル50が挿通される給電ダクト12を含み、複数の節14は、ジグザグ状に折れ曲がるように接続され、昇降パレット64がその最下位置にあるときに大略直線状になり、昇降パレット64がその最上位置にあるときに上下に重なって折り畳まれる。このような構成により、複数の節14がリンク機構の如く動作し、給電ダクト12によって案内される給電ケーブル50も、昇降パレット64の昇降移動に合わせて大略直線状及び折り畳み状態へと変形する。従って、昇降パレット64が最上位置にあるときやそこに至るまでの過程において、給電ケーブル50が昇降パレット64から垂れ下がるようなことはなく、給電ケーブル50が周囲設備に干渉することを防止することが可能となる。【選択図】図1
WIRING STRUCTURE OF FEEDER CABLE AND WIRING METHOD
給電ケーブルの配線構造及び配線方法
FUJIKAWA ATSUSHI (author)
2024-07-01
Patent
Electronic Resource
Japanese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
UNDERFLOOR WIRING STRUCTURE AND UNDERFLOOR WIRING METHOD
European Patent Office | 2024
|UNDERFLOOR WIRING STRUCTURE AND METHOD FOR UNDERFLOOR WIRING
European Patent Office | 2022
|