A platform for research: civil engineering, architecture and urbanism
BUILDING FOUNDATION STRUCTURE AND CONSTRUCTION METHOD FOR BUILDING FOUNDATION STRUCTURE
To provide a foundation structure 1 capable of realizing efficient excavation and filling of filler material.SOLUTION: A foundation structure 1 of a building 110 according to the present embodiment comprises: a first installation hole 11 formed in the ground 100; a second installation hole 12 in communication with the first installation hole 11, formed more slender than the first installation hole 11; a column leg part 13 placed in the first installation hole 11; a core member 14 connected to the column leg part 13, at least a part of which is placed in the second installation hole 12; a filler material 15 that is filled between the first installation hole 11 and the column leg part 13 and is also filled between the second installation hole 12 and the core member 14 to fix the column leg part 13 and the core member 14.SELECTED DRAWING: Figure 2A
【課題】効率的な掘削及び充填部材の充填を実現できる基礎構造1を提供すること。【解決手段】本実施形態の建造物110の基礎構造1は、地盤100に形成される第1設置穴11と、第1設置穴11に連通し、第1設置穴11に対して相対的に細く形成される第2設置穴12と、第1設置穴11に配置される柱脚部13と、柱脚部13に接続され、少なくとも一部が第2設置穴12に配置される芯材14と、第1設置穴11と柱脚部13の間に充填されるとともに、第2設置穴12と芯材14の間に充填されて柱脚部13及び芯材14を固定する充填部材15と、を有する。【選択図】図2A
BUILDING FOUNDATION STRUCTURE AND CONSTRUCTION METHOD FOR BUILDING FOUNDATION STRUCTURE
To provide a foundation structure 1 capable of realizing efficient excavation and filling of filler material.SOLUTION: A foundation structure 1 of a building 110 according to the present embodiment comprises: a first installation hole 11 formed in the ground 100; a second installation hole 12 in communication with the first installation hole 11, formed more slender than the first installation hole 11; a column leg part 13 placed in the first installation hole 11; a core member 14 connected to the column leg part 13, at least a part of which is placed in the second installation hole 12; a filler material 15 that is filled between the first installation hole 11 and the column leg part 13 and is also filled between the second installation hole 12 and the core member 14 to fix the column leg part 13 and the core member 14.SELECTED DRAWING: Figure 2A
【課題】効率的な掘削及び充填部材の充填を実現できる基礎構造1を提供すること。【解決手段】本実施形態の建造物110の基礎構造1は、地盤100に形成される第1設置穴11と、第1設置穴11に連通し、第1設置穴11に対して相対的に細く形成される第2設置穴12と、第1設置穴11に配置される柱脚部13と、柱脚部13に接続され、少なくとも一部が第2設置穴12に配置される芯材14と、第1設置穴11と柱脚部13の間に充填されるとともに、第2設置穴12と芯材14の間に充填されて柱脚部13及び芯材14を固定する充填部材15と、を有する。【選択図】図2A
BUILDING FOUNDATION STRUCTURE AND CONSTRUCTION METHOD FOR BUILDING FOUNDATION STRUCTURE
建造物の基礎構造及び建造物の基礎構造の施工方法
OSAKI KENJI (author) / SAKAI MASAKI (author)
2024-07-03
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Building, foundation structure of building and construction method of foundation structure
European Patent Office | 2021
|FOUNDATION STRUCTURE OF BUILDING, AND CONSTRUCTION METHOD FOR FOUNDATION OF BUILDING
European Patent Office | 2016
|FOUNDATION CONSTRUCTION METHOD OF BUILDING AND FOUNDATION STRUCTURE OF BUILDING
European Patent Office | 2018
|FOUNDATION STRUCTURE OF BUILDING AND CONSTRUCTION METHOD FOR FOUNDATION STRUCTURE OF BUILDING
European Patent Office | 2020
|Soft foundation building foundation structure and construction method
European Patent Office | 2021
|