A platform for research: civil engineering, architecture and urbanism
SEDIMENT ACCUMULATION AND CARRYING-OUT SYSTEM, AND SEDIMENT ACCUMULATION AND CARRYING-OUT METHOD
To provide a sediment accumulation and carrying-out system and a soil accumulation and carrying-out method that can increase a space for a sediment pit as much as possible and realize temporary accumulation of a sufficient amount of excavated sediment.SOLUTION: A sediment accumulation and carrying-out system 100 temporarily accumulates generated excavated sediment in a sediment pit 10 provided in a construction site D where excavation work is performed and then carries out the accumulated excavated sediment. The sediment accumulation and carrying-out system 100 includes: a guide rail 20 provided above the sediment pit 10; a traveling frame 30 that travels along the guide rail 20; a heavy machine 40 for boarding the traveling frame 30 from the vicinity of the sediment pit 10 and retreating from the traveling frame 30 to the vicinity of the sediment pit 10, and accumulating and carrying out the excavated soil; and a first control panel 50 for controlling running and stopping of the traveling frame 30.SELECTED DRAWING: Figure 5
【課題】土砂ピットのためのスペースを可及的に増加させて、十分な量の掘削土砂の一時的な集積を実現することのできる、土砂集積搬出システムと土砂集積搬出方法を提供する。【解決手段】掘削施工を行う施工現場Dに設けられている土砂ピット10に対して、発生した掘削土砂を一時的に集積し、集積された掘削土砂を搬出する土砂集積搬出システム100であり、土砂ピット10の上方に設けられているガイドレール20と、ガイドレール20に沿って走行する走行架台30と、土砂ピット10の周辺から走行架台30への搭乗と走行架台30から土砂ピット10の周辺への退避を行うとともに、掘削土砂の集積と搬出を行う重機40と、走行架台30の走行及び停止を制御する第1制御盤50とを有する。【選択図】図5
SEDIMENT ACCUMULATION AND CARRYING-OUT SYSTEM, AND SEDIMENT ACCUMULATION AND CARRYING-OUT METHOD
To provide a sediment accumulation and carrying-out system and a soil accumulation and carrying-out method that can increase a space for a sediment pit as much as possible and realize temporary accumulation of a sufficient amount of excavated sediment.SOLUTION: A sediment accumulation and carrying-out system 100 temporarily accumulates generated excavated sediment in a sediment pit 10 provided in a construction site D where excavation work is performed and then carries out the accumulated excavated sediment. The sediment accumulation and carrying-out system 100 includes: a guide rail 20 provided above the sediment pit 10; a traveling frame 30 that travels along the guide rail 20; a heavy machine 40 for boarding the traveling frame 30 from the vicinity of the sediment pit 10 and retreating from the traveling frame 30 to the vicinity of the sediment pit 10, and accumulating and carrying out the excavated soil; and a first control panel 50 for controlling running and stopping of the traveling frame 30.SELECTED DRAWING: Figure 5
【課題】土砂ピットのためのスペースを可及的に増加させて、十分な量の掘削土砂の一時的な集積を実現することのできる、土砂集積搬出システムと土砂集積搬出方法を提供する。【解決手段】掘削施工を行う施工現場Dに設けられている土砂ピット10に対して、発生した掘削土砂を一時的に集積し、集積された掘削土砂を搬出する土砂集積搬出システム100であり、土砂ピット10の上方に設けられているガイドレール20と、ガイドレール20に沿って走行する走行架台30と、土砂ピット10の周辺から走行架台30への搭乗と走行架台30から土砂ピット10の周辺への退避を行うとともに、掘削土砂の集積と搬出を行う重機40と、走行架台30の走行及び停止を制御する第1制御盤50とを有する。【選択図】図5
SEDIMENT ACCUMULATION AND CARRYING-OUT SYSTEM, AND SEDIMENT ACCUMULATION AND CARRYING-OUT METHOD
土砂集積搬出システムと土砂集積搬出方法
GOTO SHUJI (author) / TAKAO HIRONORI (author) / OTA YAYOI (author)
2024-07-04
Patent
Electronic Resource
Japanese
IPC:
E02F
Baggern
,
DREDGING
On carrying capacity of non-uniform sediment
British Library Conference Proceedings | 1999
|Operation of low-head hydrodevelopments on sediment-carrying rivers
Online Contents | 1978
|Operation of low-head hydrodevelopments on sediment-carrying rivers
Springer Verlag | 1978
|