A platform for research: civil engineering, architecture and urbanism
BATHOLITH CONCRETE CONSTRUCTION SYSTEM AND BATHOLITH CONCRETE CONSTRUCTION METHOD
To enable planned personnel deployment, reduce construction costs, and improve construction efficiency.SOLUTION: The present invention provides a batholith concrete construction system comprising a mobile work stage 20 that is positioned above a roadbed concrete 11 with a construction space S open below and on which construction vehicles can run, mobile rails 30 provided on tunnel side walls, and a running section 40 that is fixed to the mobile work stage 20 and moves along the mobile rails 30, the mobile work stage 20 has a rebar assembly stage 21, a formwork assembly stage 22, a concrete pouring stage 23, and a concrete curing stage 24, and the multiple stages 22 to 24 are arranged so that they can be moved simultaneously when each work carried out in the construction spaces S1 to S4 below each stage is completed.SELECTED DRAWING: Figure 2
【課題】計画的な人員配置を行うことができ、施工コストを低減でき、施工効率を向上できる。【解決手段】下方に施工スペースSを開けた状態で路盤コンクリート11より上方に配置され、ステージ上で工事用車両が走行可能な移動式作業ステージ20と、トンネル側壁に設けられる移動用レール30と、移動式作業ステージ20に固定され、移動用レール30に沿って移動する走行部40と、を備え、移動式作業ステージ20は、鉄筋組立ステージ21、型枠組立ステージ22、コンクリート打設ステージ23、およびコンクリート養生ステージ24を有し、複数のステージ22~24は、それぞれのステージ下方の施工スペースS1~S4で行われる各作業の終了時に同時に移動可能に設けられている構成の底盤コンクリート施工システムを提供する。【選択図】図2
BATHOLITH CONCRETE CONSTRUCTION SYSTEM AND BATHOLITH CONCRETE CONSTRUCTION METHOD
To enable planned personnel deployment, reduce construction costs, and improve construction efficiency.SOLUTION: The present invention provides a batholith concrete construction system comprising a mobile work stage 20 that is positioned above a roadbed concrete 11 with a construction space S open below and on which construction vehicles can run, mobile rails 30 provided on tunnel side walls, and a running section 40 that is fixed to the mobile work stage 20 and moves along the mobile rails 30, the mobile work stage 20 has a rebar assembly stage 21, a formwork assembly stage 22, a concrete pouring stage 23, and a concrete curing stage 24, and the multiple stages 22 to 24 are arranged so that they can be moved simultaneously when each work carried out in the construction spaces S1 to S4 below each stage is completed.SELECTED DRAWING: Figure 2
【課題】計画的な人員配置を行うことができ、施工コストを低減でき、施工効率を向上できる。【解決手段】下方に施工スペースSを開けた状態で路盤コンクリート11より上方に配置され、ステージ上で工事用車両が走行可能な移動式作業ステージ20と、トンネル側壁に設けられる移動用レール30と、移動式作業ステージ20に固定され、移動用レール30に沿って移動する走行部40と、を備え、移動式作業ステージ20は、鉄筋組立ステージ21、型枠組立ステージ22、コンクリート打設ステージ23、およびコンクリート養生ステージ24を有し、複数のステージ22~24は、それぞれのステージ下方の施工スペースS1~S4で行われる各作業の終了時に同時に移動可能に設けられている構成の底盤コンクリート施工システムを提供する。【選択図】図2
BATHOLITH CONCRETE CONSTRUCTION SYSTEM AND BATHOLITH CONCRETE CONSTRUCTION METHOD
底盤コンクリート施工システムおよび底盤コンクリートの施工方法
IDE YASUO (author) / SAEGUSA SHUHEI (author) / TAKAHASHI YUKI (author) / WASHIMI DAISUKE (author) / MORIYA TAKESHI (author) / KANEKO SHINJI (author) / HAYASHI DAISUKE (author)
2024-08-20
Patent
Electronic Resource
Japanese
Land high-strength batholith construction method under complex geological environment
European Patent Office | 2024
|Overwater high-strength batholith construction method under complex geological environment
European Patent Office | 2024
|SOIL IMPROVEMENT BODY CONSTRUCTION METHOD, SOIL IMPROVEMENT DEVICE, SOIL IMPROVEMENT BATHOLITH
European Patent Office | 2017
|Earth dam batholith blind ditch inverted filtration system and grouting plugging construction method
European Patent Office | 2024
|Construction method of assembled pile-plate-anchor-beam combination type batholith support
European Patent Office | 2016
|