A platform for research: civil engineering, architecture and urbanism
HIGH PILE WHARF HAVING BREAKWATER FUNCTION
To provide a high pile wharf that reduces excessive pressure on a platform due to wave impact and quality problems.SOLUTION: A high pile wharf having a breakwater function includes a high pile wharf body, an electric driven pump, a hydraulic cylinder 3, an electric power module A1, and an electric power switch. wherein a support frame 10 is attached on upper ends of a plurality of foundation piles 1. Further, it comprises a wave detection mechanism, a wave detection circuit 5, a control circuit 6, a trigger circuit 7, and a delay circuit 8, wherein lower ends of the plurality of hydraulic cylinders 3 are attached on the support frame 10, respectively, upper ends of the plurality of the hydraulic cylinders 3 and a lower end of a platform 2 are integrally attached to each other, and the wave detection mechanism includes fixation plates and metal pieces, two metal pieces being attached on the side part of one of the foundation piles 1.SELECTED DRAWING: Figure 1
【課題】波の衝撃によるプラットフォームの過大圧力及び品質の問題を減少させるハイ・パイル・ワーフを提供する。【解決手段】防波機能を有するハイ・パイル・ワーフであって、ハイ・パイル・ワーフ本体と、電動油圧ポンプと、油圧シリンダ3と、電源モジュールA1と、電源スイッチとを含み、複数の基礎杭1の上端に支持フレーム10が取り付けられ、さらに波検知機構と、波検知回路5と、制御回路6と、トリガー回路7と、遅延回路8とを有し、複数の油圧シリンダ3の下端は、支持フレーム10にそれぞれ取り付けられ、複数の油圧シリンダ3の上端とプラットフォーム2の下端は、一体にそれぞれ取り付けられ、波検知機構は、固定板と金属片とを含み、2つの金属片は、そのうちの1本の基礎杭1の側部に取り付けられる。【選択図】図1
HIGH PILE WHARF HAVING BREAKWATER FUNCTION
To provide a high pile wharf that reduces excessive pressure on a platform due to wave impact and quality problems.SOLUTION: A high pile wharf having a breakwater function includes a high pile wharf body, an electric driven pump, a hydraulic cylinder 3, an electric power module A1, and an electric power switch. wherein a support frame 10 is attached on upper ends of a plurality of foundation piles 1. Further, it comprises a wave detection mechanism, a wave detection circuit 5, a control circuit 6, a trigger circuit 7, and a delay circuit 8, wherein lower ends of the plurality of hydraulic cylinders 3 are attached on the support frame 10, respectively, upper ends of the plurality of the hydraulic cylinders 3 and a lower end of a platform 2 are integrally attached to each other, and the wave detection mechanism includes fixation plates and metal pieces, two metal pieces being attached on the side part of one of the foundation piles 1.SELECTED DRAWING: Figure 1
【課題】波の衝撃によるプラットフォームの過大圧力及び品質の問題を減少させるハイ・パイル・ワーフを提供する。【解決手段】防波機能を有するハイ・パイル・ワーフであって、ハイ・パイル・ワーフ本体と、電動油圧ポンプと、油圧シリンダ3と、電源モジュールA1と、電源スイッチとを含み、複数の基礎杭1の上端に支持フレーム10が取り付けられ、さらに波検知機構と、波検知回路5と、制御回路6と、トリガー回路7と、遅延回路8とを有し、複数の油圧シリンダ3の下端は、支持フレーム10にそれぞれ取り付けられ、複数の油圧シリンダ3の上端とプラットフォーム2の下端は、一体にそれぞれ取り付けられ、波検知機構は、固定板と金属片とを含み、2つの金属片は、そのうちの1本の基礎杭1の側部に取り付けられる。【選択図】図1
HIGH PILE WHARF HAVING BREAKWATER FUNCTION
防波機能を有するハイ・パイル・ワーフ
CHENG ZI-LIN (author) / ZHANG YIJIA (author)
2024-10-04
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
European Patent Office | 2023
|Wharf breakwater engineering accropode installation process
European Patent Office | 2024
|Prestressed concrete simplifies construction of breakwater/wharf
Engineering Index Backfile | 1969
|Fisherman's Wharf Breakwater Monitoring Study, San Francisco, California
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1994
|