A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION STRUCTURE AND CONSTRUCTION METHOD OF STONE WALL
To provide a construction structure and a construction method for a stone wall that allow stones to be installed in desired locations without using fasteners and without the need for conventional labor.SOLUTION: In a first sling 6, a first end part 6a of one end provided with an annular part is positioned on one lateral side 3b1 of a reserve part 3b of a stone 3. A second end 6b of the other end is provided with pulling resistance force from a resistance material provided in banking 2. In a second sling 7, the first sling 6 is passed through an annular part provided at a third end 7a on one end, covering a part of the surroundings of the reserve part 3b from the one lateral side 3b1, on the other lateral side 3b2 of the reserve part 3b opposite to the one lateral side 3b1. In addition, a fourth end part 7b of the other end is passed through the annular part of the first end part 6a positioned on the one lateral side 3b1, covering the rest of the surroundings of the reserve part 3b from the other lateral side 3b2. The fourth end part 7b is provided with the pulling resistance force from the resistance material provided in the banking 2.SELECTED DRAWING: Figure 2
【課題】 締付け具を用いることなく、しかも、従来の手間を要することなく、築石を所望箇所に設置可能な石垣の構築構造および構築方法を提供する。【解決手段】 第1スリング6は、環状部が設けられた一方の末端の第1端部6aが、築石3の控え部分3bの一方の側面3b1に位置させられる。他方の末端の第2端部6bには、盛土2中に設けられる抵抗材から引抜き抵抗力が与えられる。第2スリング7は、一方の側面3b1に対向する控え部分3bの他方の側面3b2で、一方の末端の第3端部7aに設けられた環状部に、一方の側面3b1から控え部分3bの周囲の一部を覆って、第1スリング6が通される。また、一方の側面3b1に位置させられた第1端部6aの環状部に、他方の側面3b2から控え部分3bの周囲の残部を覆って、他方の末端の第4端部7bが通される。この第4端部7bには、盛土2中に設けられる抵抗材から引抜き抵抗力が与えられる。【選択図】 図2
CONSTRUCTION STRUCTURE AND CONSTRUCTION METHOD OF STONE WALL
To provide a construction structure and a construction method for a stone wall that allow stones to be installed in desired locations without using fasteners and without the need for conventional labor.SOLUTION: In a first sling 6, a first end part 6a of one end provided with an annular part is positioned on one lateral side 3b1 of a reserve part 3b of a stone 3. A second end 6b of the other end is provided with pulling resistance force from a resistance material provided in banking 2. In a second sling 7, the first sling 6 is passed through an annular part provided at a third end 7a on one end, covering a part of the surroundings of the reserve part 3b from the one lateral side 3b1, on the other lateral side 3b2 of the reserve part 3b opposite to the one lateral side 3b1. In addition, a fourth end part 7b of the other end is passed through the annular part of the first end part 6a positioned on the one lateral side 3b1, covering the rest of the surroundings of the reserve part 3b from the other lateral side 3b2. The fourth end part 7b is provided with the pulling resistance force from the resistance material provided in the banking 2.SELECTED DRAWING: Figure 2
【課題】 締付け具を用いることなく、しかも、従来の手間を要することなく、築石を所望箇所に設置可能な石垣の構築構造および構築方法を提供する。【解決手段】 第1スリング6は、環状部が設けられた一方の末端の第1端部6aが、築石3の控え部分3bの一方の側面3b1に位置させられる。他方の末端の第2端部6bには、盛土2中に設けられる抵抗材から引抜き抵抗力が与えられる。第2スリング7は、一方の側面3b1に対向する控え部分3bの他方の側面3b2で、一方の末端の第3端部7aに設けられた環状部に、一方の側面3b1から控え部分3bの周囲の一部を覆って、第1スリング6が通される。また、一方の側面3b1に位置させられた第1端部6aの環状部に、他方の側面3b2から控え部分3bの周囲の残部を覆って、他方の末端の第4端部7bが通される。この第4端部7bには、盛土2中に設けられる抵抗材から引抜き抵抗力が与えられる。【選択図】 図2
CONSTRUCTION STRUCTURE AND CONSTRUCTION METHOD OF STONE WALL
石垣の構築構造および構築方法
YUTA SHINICHI (author) / KONAMI TAKEJI (author)
2024-10-24
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Stone curtain wall structure and construction method thereof
European Patent Office | 2024
|Stone curtain wall connecting structure and construction method
European Patent Office | 2024
|Stone: Types of Wall Construction
Wiley | 2008
|Dry hanging stone curtain wall construction method and curtain wall structure
European Patent Office | 2024
|