RETAINING WALL CONSTRUCTION METHOD USING ECO-FRIENDLY VEGETATIONAL GABION AND ECO-FRIENDLY VEGETATIONAL GABION THEREWITH
The present invention relates to a retaining wall construction method using an eco-friendly vegetation gabion, which facilitates vegetation and is applicable to a retaining wall around a cutting area, a river, a road, and the like and an eco-friendly vegetation gabion for the same. The retaining wall construction method using an eco-friendly vegetation gabion comprises: a step (a) of preparing a floor surface and a slope; a step (b) of installing a plurality of gabions; a step of installing a deformation prevention rod and a binding support rod; a step (d) of separately installing a front fixating support frame and a rear fixating support frame; a step (e) of filling the inside of the gabions with stone by injecting the stone; a step (f) of removing the rear fixating support frame; a step (g) of placing a backfilling material in a space between the slope and the main body of the gabions; a step (h) of finishing the gabion for a base part; a step (i) of installing a gutter on the top of the gabions of the base part; a step (j) of continuously installing a plurality of wire mesh main bodies except for upper wire meshes from side to side; a step (k) of installing a nonwoven fabric inside the wire mesh main bodies; a step (l) of installing the deformation prevention rod on the outer side of the front wire mesh of the wire mesh main bodies; a step (m) of installing a vegetation inducement part on the inner side of the front wire mesh of the wire mesh main bodies; a step (n) of installing the binding support rod inside the wire mesh main bodies; a step (o) of installing the front and rear fixating support frames; a step (p) of filling the inside of the wire mesh main bodies with a filler; a step (q) of removing the rear fixating support frame; a step (r) of placing the backfilling material in a space between the slope and the wire mesh main bodies; a step (s) of finishing a vegetation gabion; and a step (t) of installing a gutter on the top of the vegetation gabion and repeating the step (j) to step (s).
본 발명은 철망바구니를 이루는 철망본체의 가로철선과 세로철선의 교차점을 용접하며, 배부름방지봉과 결속지지봉을 통해 철망본체 전면부의 배부름을 방지함과 함께 후면부의 압력을 더욱 견고히 견디도록 하여 파손을 방지하며, 최하단 석재부 철망바구니의 상부에 형성되는 식생부 철망바구니의 내부에는 토석을 채워 식생이 용이하고 미관이 뛰어나도록 하여 절개지옹벽, 하천옹벽, 도로변옹벽 등에 적합한 식생가능한 철망바구니를 이용한 옹벽 시공방법 및 이를 위한 식생가능한 철망바구니에 관한 것이다. 상기 과제를 해결하기 위한 본 발명의 식생가능한 철망바구니를 이용한 옹벽 시공방법은, (a) 식생공법이 적용될 수 있도록 바닥면 및 법면의 기초 토공작업을 수행하는 바닥면 및 법면정리 단계; (b) 상기 (a) 단계 후, 기초부 철망바구니 형성을 위해 상부철망을 제외한 철망본체를 바닥면 상부에 좌우로 연속하여 복수 개 설치하는 단계; (c) 상기 (b) 단계 후, 상기 철망본체에 배부름방지봉과 결속지지봉을 설치하는 단계; (d) 상기 (c) 단계 후, 상기 철망본체의 전면 및 후면에 전면고정지지틀과 후면고정지지틀을 각각 설치하는 단계; (e) 상기 (d) 단계 후, 상기 철망본체의 내부에 석재를 투입하여 채우는 단계; (f) 상기 (e) 단계 후, 상기 철망본체의 후면에 설치된 후면고정지지틀을 제거하는 단계; (g) 상기 (f) 단계 후, 법면과 상기 철망본체의 사이에 뒷채움재를 타설하는 단계; (h) 상기 (g) 단계 후, 상기 철망본체의 상부에 상부철망을 설치하여 기초부 철망바구니를 완성하는 단계; (i) 상기 (h) 단계 후, 상기 기초부 철망바구니의 상부에 물받이부를 설치하는 단계; (j) 상기 (i) 단계 후, 식생부 철망바구니 형성을 위해 상부철망을 제외한 철망본체를 좌우로 연속하여 복수 개 설치하는 단계; (k) 상기 (j) 단계 후, 철망본체의 내부에 부직포를 설치하는 단계; (l) 상기 (k) 단계 후, 상기 철망본체의 전면부철망 외부면에 배부름방지봉을 설치하는 단계; (m) 상기 (l) 단계 후, 상기 철망본체의 전면부철망 내부면에 식생유도부를 설치하는 단계; (n) 상기 (m) 단계 후, 상기 철망본체 내부에 결속지지봉을 설치하는 단계; (o) 상기 (n) 단계 후, 상기 철망본체의 전면 및 후면에 전면고정지지틀과 후면고정지지틀을 각각 설치하는 단계; (p) 상기 (o) 단계 후, 상기 철망본체 내부에 충진재를 투입하여 채우는 단계; (q) 상기 (p) 단계 후, 상기 철망본체의 후면에 설치된 후면고정지지틀을 제거하는 단계; (r) 상기 (q) 단계 후, 법면과 상기 철망본체의 사이에 뒷채움재를 타설하는 단계; (s) 상기 (r) 단계 후, 상기 철망본체의 상부에 상부철망을 설치하여 식생부 철망바구니를 완성하는 단계; 및 (t) 상기 (s) 단계 후, 상기 식생부 철망바구니의 상부에 물받이부를 설치 한 다음, (j) 단계 내지 (s) 단계를 반복 수행하는 단계로 이루어지는 것을 특징으로 하는 한다.
RETAINING WALL CONSTRUCTION METHOD USING ECO-FRIENDLY VEGETATIONAL GABION AND ECO-FRIENDLY VEGETATIONAL GABION THEREWITH
The present invention relates to a retaining wall construction method using an eco-friendly vegetation gabion, which facilitates vegetation and is applicable to a retaining wall around a cutting area, a river, a road, and the like and an eco-friendly vegetation gabion for the same. The retaining wall construction method using an eco-friendly vegetation gabion comprises: a step (a) of preparing a floor surface and a slope; a step (b) of installing a plurality of gabions; a step of installing a deformation prevention rod and a binding support rod; a step (d) of separately installing a front fixating support frame and a rear fixating support frame; a step (e) of filling the inside of the gabions with stone by injecting the stone; a step (f) of removing the rear fixating support frame; a step (g) of placing a backfilling material in a space between the slope and the main body of the gabions; a step (h) of finishing the gabion for a base part; a step (i) of installing a gutter on the top of the gabions of the base part; a step (j) of continuously installing a plurality of wire mesh main bodies except for upper wire meshes from side to side; a step (k) of installing a nonwoven fabric inside the wire mesh main bodies; a step (l) of installing the deformation prevention rod on the outer side of the front wire mesh of the wire mesh main bodies; a step (m) of installing a vegetation inducement part on the inner side of the front wire mesh of the wire mesh main bodies; a step (n) of installing the binding support rod inside the wire mesh main bodies; a step (o) of installing the front and rear fixating support frames; a step (p) of filling the inside of the wire mesh main bodies with a filler; a step (q) of removing the rear fixating support frame; a step (r) of placing the backfilling material in a space between the slope and the wire mesh main bodies; a step (s) of finishing a vegetation gabion; and a step (t) of installing a gutter on the top of the vegetation gabion and repeating the step (j) to step (s).
본 발명은 철망바구니를 이루는 철망본체의 가로철선과 세로철선의 교차점을 용접하며, 배부름방지봉과 결속지지봉을 통해 철망본체 전면부의 배부름을 방지함과 함께 후면부의 압력을 더욱 견고히 견디도록 하여 파손을 방지하며, 최하단 석재부 철망바구니의 상부에 형성되는 식생부 철망바구니의 내부에는 토석을 채워 식생이 용이하고 미관이 뛰어나도록 하여 절개지옹벽, 하천옹벽, 도로변옹벽 등에 적합한 식생가능한 철망바구니를 이용한 옹벽 시공방법 및 이를 위한 식생가능한 철망바구니에 관한 것이다. 상기 과제를 해결하기 위한 본 발명의 식생가능한 철망바구니를 이용한 옹벽 시공방법은, (a) 식생공법이 적용될 수 있도록 바닥면 및 법면의 기초 토공작업을 수행하는 바닥면 및 법면정리 단계; (b) 상기 (a) 단계 후, 기초부 철망바구니 형성을 위해 상부철망을 제외한 철망본체를 바닥면 상부에 좌우로 연속하여 복수 개 설치하는 단계; (c) 상기 (b) 단계 후, 상기 철망본체에 배부름방지봉과 결속지지봉을 설치하는 단계; (d) 상기 (c) 단계 후, 상기 철망본체의 전면 및 후면에 전면고정지지틀과 후면고정지지틀을 각각 설치하는 단계; (e) 상기 (d) 단계 후, 상기 철망본체의 내부에 석재를 투입하여 채우는 단계; (f) 상기 (e) 단계 후, 상기 철망본체의 후면에 설치된 후면고정지지틀을 제거하는 단계; (g) 상기 (f) 단계 후, 법면과 상기 철망본체의 사이에 뒷채움재를 타설하는 단계; (h) 상기 (g) 단계 후, 상기 철망본체의 상부에 상부철망을 설치하여 기초부 철망바구니를 완성하는 단계; (i) 상기 (h) 단계 후, 상기 기초부 철망바구니의 상부에 물받이부를 설치하는 단계; (j) 상기 (i) 단계 후, 식생부 철망바구니 형성을 위해 상부철망을 제외한 철망본체를 좌우로 연속하여 복수 개 설치하는 단계; (k) 상기 (j) 단계 후, 철망본체의 내부에 부직포를 설치하는 단계; (l) 상기 (k) 단계 후, 상기 철망본체의 전면부철망 외부면에 배부름방지봉을 설치하는 단계; (m) 상기 (l) 단계 후, 상기 철망본체의 전면부철망 내부면에 식생유도부를 설치하는 단계; (n) 상기 (m) 단계 후, 상기 철망본체 내부에 결속지지봉을 설치하는 단계; (o) 상기 (n) 단계 후, 상기 철망본체의 전면 및 후면에 전면고정지지틀과 후면고정지지틀을 각각 설치하는 단계; (p) 상기 (o) 단계 후, 상기 철망본체 내부에 충진재를 투입하여 채우는 단계; (q) 상기 (p) 단계 후, 상기 철망본체의 후면에 설치된 후면고정지지틀을 제거하는 단계; (r) 상기 (q) 단계 후, 법면과 상기 철망본체의 사이에 뒷채움재를 타설하는 단계; (s) 상기 (r) 단계 후, 상기 철망본체의 상부에 상부철망을 설치하여 식생부 철망바구니를 완성하는 단계; 및 (t) 상기 (s) 단계 후, 상기 식생부 철망바구니의 상부에 물받이부를 설치 한 다음, (j) 단계 내지 (s) 단계를 반복 수행하는 단계로 이루어지는 것을 특징으로 하는 한다.
RETAINING WALL CONSTRUCTION METHOD USING ECO-FRIENDLY VEGETATIONAL GABION AND ECO-FRIENDLY VEGETATIONAL GABION THEREWITH
식생가능한 철망바구니를 이용한 옹벽 시공방법 및 이를 위한 식생가능한 철망바구니
SUK JU HWAN (author)
2015-06-09
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Gabion gabion net ecological retaining wall for river regulation