LOW PRESSURE PERMEATION GROUTING METHOD FOR FILL DAM
The present invention relates to a low pressure permeable grouting method for a fill dam comprising: a testing step of executing a specimen sampling, a standard penetration test and/or a water permeability test while perforating test holes in a plurality of steps and calculating a limit of injection pressure of a cement grout; a perforated hole shaping step to shape perforated holes at a certain space in a zone of the fill dam to be reinforced with waterproofness; an initial injecting step to initially inject the cement grout by inserting a porous spray injecting device up to a lower side of the perforated holes; a repetitive injecting step to inject the cement grout by raising the porous spray injecting device to a certain height; and a step of repeating the repetitive injecting step up to a required height. Through the present invention, the waterproofing effect of a fill dam can be improved through an enhancement of permeability performance of a cement grout and stability of a fill dam by injecting the cement grout at low pressures generated in a gap of a core in the fill dam wherein water leakage is expected or piping is generated, or in a sinkhole generated due to a fissure or piping phenomenon. Additionally, risk elements of a dam due to construction can be removed by preventing water pressure fracturing of the core due to injection pressure at an injection of the cement grout, and construction costs can be reduced by preventing reparation and re-construction.
본 발명은, 필댐의 저압침투그라우팅 공법에 있어서, 시험공을 다단계에 걸쳐 천공하면서 각 단계에서 시료채취, 표준관입시험, 또는/및 투수시험을 하고, 시멘트그라우트의 한계주입압을 산정하는 시험단계; 상기 필댐의 차수보강하고자 하는 구역에 일정 간격으로 천공구를 형성하는 천공구형성단계; 상기 천공구의 하측까지 다공분사주입장치를 삽입하여 상기 시멘트그라우트를 최초 주입하는 최초주입단계; 상기 다공분사주입장치를 일정 높이 상승시켜 상기 시멘트그라우트를 주입하는 반복주입단계; 및 상기 반복주입단계를 필요한 높이까지 반복하여 수행하는 단계;를 포함하는 필댐의 저압침투그라우팅 공법에 관한 것이다. 본 발명을 통해, 누수가 예상되거나 파이핑이 발생하고 있는 필댐의 코어의 간극과 균열 또는 파이핑 현상으로 발생한 싱크홀에 시멘트그라우트를 저압으로 주입함으로써, 코어의 간극, 미세 균열, 및 싱크홀을 안전하게 충진하여 시멘트그라우트의 침투성능과 필댐의 안전성을 향상시켜 필댐의 차수효과를 향상시키며, 시멘트그라우트 주입시의 주입압력에 의한 코어의 수압할렬을 방지하여 시공으로 인한 댐의 위험요소를 제거하고, 재보수 및 재시공을 방지하여 공사비를 절감하는 효과를 제공할 수 있다.
LOW PRESSURE PERMEATION GROUTING METHOD FOR FILL DAM
The present invention relates to a low pressure permeable grouting method for a fill dam comprising: a testing step of executing a specimen sampling, a standard penetration test and/or a water permeability test while perforating test holes in a plurality of steps and calculating a limit of injection pressure of a cement grout; a perforated hole shaping step to shape perforated holes at a certain space in a zone of the fill dam to be reinforced with waterproofness; an initial injecting step to initially inject the cement grout by inserting a porous spray injecting device up to a lower side of the perforated holes; a repetitive injecting step to inject the cement grout by raising the porous spray injecting device to a certain height; and a step of repeating the repetitive injecting step up to a required height. Through the present invention, the waterproofing effect of a fill dam can be improved through an enhancement of permeability performance of a cement grout and stability of a fill dam by injecting the cement grout at low pressures generated in a gap of a core in the fill dam wherein water leakage is expected or piping is generated, or in a sinkhole generated due to a fissure or piping phenomenon. Additionally, risk elements of a dam due to construction can be removed by preventing water pressure fracturing of the core due to injection pressure at an injection of the cement grout, and construction costs can be reduced by preventing reparation and re-construction.
본 발명은, 필댐의 저압침투그라우팅 공법에 있어서, 시험공을 다단계에 걸쳐 천공하면서 각 단계에서 시료채취, 표준관입시험, 또는/및 투수시험을 하고, 시멘트그라우트의 한계주입압을 산정하는 시험단계; 상기 필댐의 차수보강하고자 하는 구역에 일정 간격으로 천공구를 형성하는 천공구형성단계; 상기 천공구의 하측까지 다공분사주입장치를 삽입하여 상기 시멘트그라우트를 최초 주입하는 최초주입단계; 상기 다공분사주입장치를 일정 높이 상승시켜 상기 시멘트그라우트를 주입하는 반복주입단계; 및 상기 반복주입단계를 필요한 높이까지 반복하여 수행하는 단계;를 포함하는 필댐의 저압침투그라우팅 공법에 관한 것이다. 본 발명을 통해, 누수가 예상되거나 파이핑이 발생하고 있는 필댐의 코어의 간극과 균열 또는 파이핑 현상으로 발생한 싱크홀에 시멘트그라우트를 저압으로 주입함으로써, 코어의 간극, 미세 균열, 및 싱크홀을 안전하게 충진하여 시멘트그라우트의 침투성능과 필댐의 안전성을 향상시켜 필댐의 차수효과를 향상시키며, 시멘트그라우트 주입시의 주입압력에 의한 코어의 수압할렬을 방지하여 시공으로 인한 댐의 위험요소를 제거하고, 재보수 및 재시공을 방지하여 공사비를 절감하는 효과를 제공할 수 있다.
LOW PRESSURE PERMEATION GROUTING METHOD FOR FILL DAM
필댐의 저압침투그라우팅 공법
IM HO YEONG (author)
2015-12-07
Patent
Electronic Resource
Korean
British Library Conference Proceedings | 1993
|European Patent Office | 2020
|Effectiveness of leakage control after application of permeation grouting to earth fill dam
Springer Verlag | 2006
|Cement pressure-grouting stops settlement of ramp piers in fill
Engineering Index Backfile | 1931
|Subsidence Mitigation Using Void Fill Grouting
ASCE | 2003
|