A platform for research: civil engineering, architecture and urbanism
SMALL BORE DRAIN PIPE BURIAL METHOD OF SOFT GROUND CONDITION
The present invention provides a small bore drain pipe burial method of a soft ground condition, which prevents disturbance of the surrounding ground on a small scale in a narrow road area and subsidence of the adjacent ground in accordance with a leakage of underground water, enables construction of a working hole which is an oscillating hole, and enables construction without a change in intensity of illumination on the internal surface of a drain pipe. According to an appropriate embodiment of the present invention, the small bore drain pipe burial method of a soft ground condition comprises the following steps of: (a) pressing a steel pipe in the ground; (b) depositing floor concrete; (c) installing an entrance; (d) propelling a plurality of reed pipes toward a manhole; (e) disassembling the reed pipes in order; (f) disassembling an auger in order; (g) disassembling a leading pipe; (h) removing a propeller from the working hole; (i) laying an aggregate on the floor of the working hole; and (j) installing a manhole within the working hole.
본 발명은 협소한 도로지역에 소규모로 주변지반의 교란과 지하수 유출에 따른 인접지반의 침하를 방지하면서 작업구(발진공)의 시공이 가능하고, 하수관의 내면에 조도 변화가 없이 시공될 수 있도록 한 연약지반의 소구경 하수관 매설 공법을 제공한다. 본 발명의 적절한 실시 형태에 따른 연약지반의 소구경 하수관 매설 공법은, (a) 지상에서 시작 지점에 강관 압입기를 설치한 후, 강관을 강관 압입기에 거치하여 지반에 소요 깊이만큼 압입시켜 놓는 단계와; (b) 상기 강관의 내부를 터파기 실시하여 작업구를 형성시킨 후 바닥 콘크리트를 타설하는 단계와; (c) 상기 작업구의 내부로 왕복 운동하는 추진체와 정역 회전하는 회전축을 갖는 추진기를 도입하여 상기 강관에 고정되게 설치한 후, 강관에 종료지점인 맨홀을 향하여 투입구를 형성한 후, 그 투입구에 선두관(또는 본관)이나 리드관의 관입을 위해 엔트런스를 설치하는 단계와; (d) 상기 추진기의 회전축에 하수관 구간에 설치될 다수개의 리드관을 순차적으로 연결해가면서 선두에 위치된 최초 리드관이 맨홀에 도달될 때까지 상기 엔트런스를 통과시켜 맨홀을 향하여 추진시키는 단계와; (e) 상기 추진기의 추진체를 원위치로 복귀시킨 후 추진체와 회전축에 각기 다수개의 선두관과 오거를 순차적으로 연결해나가면서 최초 선두관이 맨홀에 도달될 때까지 추진을 반복하고, 이와 동시에 추진이 정지될 때마다 맨홀로 빠져나오는 리드관을 순차적으로 해체하는 단계와; (f) 상기 추진기의 회전축을 회전시키면서 오거를 역추진 방향으로 인출해내면서 작업구에서 하나씩 연결 부분을 풀어 순차적으로 해체시키는 단계와; (g) 상기 추진기를 사용하여 본관의 연결 및 추진을 반복하고 동시에 본관에서 밀려 맨홀에 도달하여 나타나는 선두관을 본관의 연결시마다 선두관을 해체하는 단계와; (h) 최초 본관이 맨홀에 도달되면, 추진기를 강관에서 해체한 후 인양하여 작업구에서 제거하는 단계와; (i) 작업구내 잔토를 처리하고, 본관의 갱구부를 면정리 한 후, 작업구의 바닥에 골재를 포설하는 단계; 및 (j) 작업구측 본관에 연결관을 부설하고, 작업구 내에 맨홀을 설치하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
SMALL BORE DRAIN PIPE BURIAL METHOD OF SOFT GROUND CONDITION
The present invention provides a small bore drain pipe burial method of a soft ground condition, which prevents disturbance of the surrounding ground on a small scale in a narrow road area and subsidence of the adjacent ground in accordance with a leakage of underground water, enables construction of a working hole which is an oscillating hole, and enables construction without a change in intensity of illumination on the internal surface of a drain pipe. According to an appropriate embodiment of the present invention, the small bore drain pipe burial method of a soft ground condition comprises the following steps of: (a) pressing a steel pipe in the ground; (b) depositing floor concrete; (c) installing an entrance; (d) propelling a plurality of reed pipes toward a manhole; (e) disassembling the reed pipes in order; (f) disassembling an auger in order; (g) disassembling a leading pipe; (h) removing a propeller from the working hole; (i) laying an aggregate on the floor of the working hole; and (j) installing a manhole within the working hole.
본 발명은 협소한 도로지역에 소규모로 주변지반의 교란과 지하수 유출에 따른 인접지반의 침하를 방지하면서 작업구(발진공)의 시공이 가능하고, 하수관의 내면에 조도 변화가 없이 시공될 수 있도록 한 연약지반의 소구경 하수관 매설 공법을 제공한다. 본 발명의 적절한 실시 형태에 따른 연약지반의 소구경 하수관 매설 공법은, (a) 지상에서 시작 지점에 강관 압입기를 설치한 후, 강관을 강관 압입기에 거치하여 지반에 소요 깊이만큼 압입시켜 놓는 단계와; (b) 상기 강관의 내부를 터파기 실시하여 작업구를 형성시킨 후 바닥 콘크리트를 타설하는 단계와; (c) 상기 작업구의 내부로 왕복 운동하는 추진체와 정역 회전하는 회전축을 갖는 추진기를 도입하여 상기 강관에 고정되게 설치한 후, 강관에 종료지점인 맨홀을 향하여 투입구를 형성한 후, 그 투입구에 선두관(또는 본관)이나 리드관의 관입을 위해 엔트런스를 설치하는 단계와; (d) 상기 추진기의 회전축에 하수관 구간에 설치될 다수개의 리드관을 순차적으로 연결해가면서 선두에 위치된 최초 리드관이 맨홀에 도달될 때까지 상기 엔트런스를 통과시켜 맨홀을 향하여 추진시키는 단계와; (e) 상기 추진기의 추진체를 원위치로 복귀시킨 후 추진체와 회전축에 각기 다수개의 선두관과 오거를 순차적으로 연결해나가면서 최초 선두관이 맨홀에 도달될 때까지 추진을 반복하고, 이와 동시에 추진이 정지될 때마다 맨홀로 빠져나오는 리드관을 순차적으로 해체하는 단계와; (f) 상기 추진기의 회전축을 회전시키면서 오거를 역추진 방향으로 인출해내면서 작업구에서 하나씩 연결 부분을 풀어 순차적으로 해체시키는 단계와; (g) 상기 추진기를 사용하여 본관의 연결 및 추진을 반복하고 동시에 본관에서 밀려 맨홀에 도달하여 나타나는 선두관을 본관의 연결시마다 선두관을 해체하는 단계와; (h) 최초 본관이 맨홀에 도달되면, 추진기를 강관에서 해체한 후 인양하여 작업구에서 제거하는 단계와; (i) 작업구내 잔토를 처리하고, 본관의 갱구부를 면정리 한 후, 작업구의 바닥에 골재를 포설하는 단계; 및 (j) 작업구측 본관에 연결관을 부설하고, 작업구 내에 맨홀을 설치하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
SMALL BORE DRAIN PIPE BURIAL METHOD OF SOFT GROUND CONDITION
연약지반의 소구경 하수관 매설 공법
KIM TAE HOON (author) / LEE YONG TAEK (author)
2016-05-12
Patent
Electronic Resource
Korean
European Patent Office | 2019
|Online Contents | 2005
Small bore tunnelling & pipe jacking
Online Contents | 1993