A platform for research: civil engineering, architecture and urbanism
Pipe propulsion method of soft ground condition
The present invention relates to a pipe construction method for soft ground, in which after propelling leads tubes and main tubes, grouting fluid is applied on circumferential surfaces of the main tubes, thereby reinforcing the ground surface and securing safety in the front of a gallery and preventing subsidence of the soft ground. The pipe construction method includes: a first step of mounting a propeller to a construction start area after the construction start area and an arrival work area are excavated at a pipe burial start position and a pipe burial stop position, respectively; a second step pressing each of lead tubes having an excavating head mounted to a front end thereof into a side toward the arrival work area of a wall surface of the construction start area by using the propeller; a third step propelling the multiple lead tubes continuously in series such that the lead tubes having the excavating head mounted thereto advance toward the arrival work area; a fourth step propelling multiple main tubes having screws imbedded therein in series such that all the multiple lead tubes are withdrawn to the arrival work area; a fifth step applying grouting fluid on circumferential surfaces of the main tubes; a sixth step separating the screws from the main tubes by withdrawing the screws mounted in the main tubes backwards after the grouting fluid is hardened.
본 발명에 의한 연약지반에서의 파이프 시공공법은, 파이프의 매설 시작지점과 파이프의 매설 종료지점에 각각 발진작업구와 도달작업구를 굴착한 후 상기 발진작업구에 추진기를 설치하는 제1 단계; 상기 추진기를 이용하여 선단에 굴착헤드가 장착된 리드관을 상기 발진작업구 벽면 중 상기 도달작업구를 향하는 측에 압입시키는 제2 단계; 상기 굴착헤드가 장착된 리드관이 도달작업구를 향해 이송되도록 다수 개의 리드관을 일렬로 연속 추진하는 제3 단계; 상기 다수 개의 리드관이 모두 상기 도달작업구로 인출되도록, 스크류가 내장된 다수 개의 본관을 연속적으로 추진하는 제4 단계; 상기 본관의 외주면에 그라우팅액을 주입시키는 제5 단계; 상기 그라우팅액의 경화가 완료된 이후 상기 본관 내에 장착된 스크류만을 후방으로 인출시켜 해체하는 제6 단계;를 포함한다.
Pipe propulsion method of soft ground condition
The present invention relates to a pipe construction method for soft ground, in which after propelling leads tubes and main tubes, grouting fluid is applied on circumferential surfaces of the main tubes, thereby reinforcing the ground surface and securing safety in the front of a gallery and preventing subsidence of the soft ground. The pipe construction method includes: a first step of mounting a propeller to a construction start area after the construction start area and an arrival work area are excavated at a pipe burial start position and a pipe burial stop position, respectively; a second step pressing each of lead tubes having an excavating head mounted to a front end thereof into a side toward the arrival work area of a wall surface of the construction start area by using the propeller; a third step propelling the multiple lead tubes continuously in series such that the lead tubes having the excavating head mounted thereto advance toward the arrival work area; a fourth step propelling multiple main tubes having screws imbedded therein in series such that all the multiple lead tubes are withdrawn to the arrival work area; a fifth step applying grouting fluid on circumferential surfaces of the main tubes; a sixth step separating the screws from the main tubes by withdrawing the screws mounted in the main tubes backwards after the grouting fluid is hardened.
본 발명에 의한 연약지반에서의 파이프 시공공법은, 파이프의 매설 시작지점과 파이프의 매설 종료지점에 각각 발진작업구와 도달작업구를 굴착한 후 상기 발진작업구에 추진기를 설치하는 제1 단계; 상기 추진기를 이용하여 선단에 굴착헤드가 장착된 리드관을 상기 발진작업구 벽면 중 상기 도달작업구를 향하는 측에 압입시키는 제2 단계; 상기 굴착헤드가 장착된 리드관이 도달작업구를 향해 이송되도록 다수 개의 리드관을 일렬로 연속 추진하는 제3 단계; 상기 다수 개의 리드관이 모두 상기 도달작업구로 인출되도록, 스크류가 내장된 다수 개의 본관을 연속적으로 추진하는 제4 단계; 상기 본관의 외주면에 그라우팅액을 주입시키는 제5 단계; 상기 그라우팅액의 경화가 완료된 이후 상기 본관 내에 장착된 스크류만을 후방으로 인출시켜 해체하는 제6 단계;를 포함한다.
Pipe propulsion method of soft ground condition
연약지반용 파이프 시공공법
SEO CHANG SU (author)
2018-07-04
Patent
Electronic Resource
Korean
SMALL BORE DRAIN PIPE BURIAL METHOD OF SOFT GROUND CONDITION
European Patent Office | 2016
|European Patent Office | 2024
|European Patent Office | 2019
|