A platform for research: civil engineering, architecture and urbanism
METHOD FOR REPAIRING OR REINFORCING CONCRETE STRUCTURE
The present invention relates to a method for repairing or reinforcing a concrete structure which includes a step of arranging a ceiling, a step of installing anchor, a step of installing a ceiling stiffener, a step of installing a profile, and a step of filling mortar in order to repair or reinforce the ceiling of a concrete structure, wherein in the step of installing a profile, the profile is cut into several parts to have a predetermined size and end portions of the cut profiles are inserted and mounted into grooves of a connection member in a longitudinal direction using a coupling device. Furthermore, the present invention relates to a method for repairing or reinforcing a concrete structure which includes a step of arranging a floor, a step of installing an anchor, a step of installing a floor stiffener, a step of installing a profile, a step of sealing a gap between right and left side walls of the profile and the concrete structure and opened front and rear sides of the profile and the concrete structure, and a step of filling mortar fin order to repair or reinforce the ceiling of a concrete structure, wherein in the step of installing a profile, a hook of a clip inserted into a floor stiffener is fitted and mounted to an iron part between the neighboring profiles and the profiles are extended and mounted in the longitudinal direction of the concrete structure such that concave-convex parts of the profiles face the floor. The method for repairing or reinforcing a concrete structure according to the present invention is easy to construct, and can reduce a construction period of time because there is no need to frequently move heavy machine equipment.
본 발명은 콘크리트 구조물의 천정에 대한 보수ㆍ보강을 위하여 천정 정리단계, 앵커 설치단계, 천정 보강재 설치단계, 프로파일 설치단계, 모르타르 충전단계로 이루어진 콘크리트 구조물의 보수ㆍ보강 공법에 있어서; 상기 프로파일 설치단계에서 상기 프로파일을 일정 크기로 절단하여 프로파일들 간의 양 단부를 연결부재의 홈에 삽입하도록 결합장치를 이용하여 종방향으로 설치하는 것을 특징으로 하는 콘크리트 구조물의 보수ㆍ보강공법에 관한 것이다. 본 발명은 또한 콘크리트 구조물의 보수ㆍ보강을 위하여 바닥 정리단계, 앵커 설치단계, 바닥 보강재 설치단계, 프로파일 설치단계, 프로파일과 콘크리트 구조물의 좌우 측벽 사이 및 개방된 전후의 밀봉단계, 및 모르타르 충전단계로 이루어진 콘크리트 구조물의 보수ㆍ보강 공법에 있어서; 상기 프로파일 설치단계에서 바닥 보강재에 삽입된 클립의 후크가 프로파일과 인접한 프로파일 사이의 철부에 끼워져 설치되고, 프로파일의 요철부가 바닥과 마주 보도록 콘크리트 구조물의 길이방향을 따라 프로파일을 종방향으로 연장 설치하는 것을 특징으로 하는 콘크리트 구조물의 보수ㆍ보강공법에 관한 것이다. 본 발명에 따른 콘크리트 구조물의 보수ㆍ보강공법에 의하면, 무거운 기계장비를 빈번하게 이동하지 않고도 시공이 간편하고 시공 시간을 절감할 수 있는 효과가 있다.
METHOD FOR REPAIRING OR REINFORCING CONCRETE STRUCTURE
The present invention relates to a method for repairing or reinforcing a concrete structure which includes a step of arranging a ceiling, a step of installing anchor, a step of installing a ceiling stiffener, a step of installing a profile, and a step of filling mortar in order to repair or reinforce the ceiling of a concrete structure, wherein in the step of installing a profile, the profile is cut into several parts to have a predetermined size and end portions of the cut profiles are inserted and mounted into grooves of a connection member in a longitudinal direction using a coupling device. Furthermore, the present invention relates to a method for repairing or reinforcing a concrete structure which includes a step of arranging a floor, a step of installing an anchor, a step of installing a floor stiffener, a step of installing a profile, a step of sealing a gap between right and left side walls of the profile and the concrete structure and opened front and rear sides of the profile and the concrete structure, and a step of filling mortar fin order to repair or reinforce the ceiling of a concrete structure, wherein in the step of installing a profile, a hook of a clip inserted into a floor stiffener is fitted and mounted to an iron part between the neighboring profiles and the profiles are extended and mounted in the longitudinal direction of the concrete structure such that concave-convex parts of the profiles face the floor. The method for repairing or reinforcing a concrete structure according to the present invention is easy to construct, and can reduce a construction period of time because there is no need to frequently move heavy machine equipment.
본 발명은 콘크리트 구조물의 천정에 대한 보수ㆍ보강을 위하여 천정 정리단계, 앵커 설치단계, 천정 보강재 설치단계, 프로파일 설치단계, 모르타르 충전단계로 이루어진 콘크리트 구조물의 보수ㆍ보강 공법에 있어서; 상기 프로파일 설치단계에서 상기 프로파일을 일정 크기로 절단하여 프로파일들 간의 양 단부를 연결부재의 홈에 삽입하도록 결합장치를 이용하여 종방향으로 설치하는 것을 특징으로 하는 콘크리트 구조물의 보수ㆍ보강공법에 관한 것이다. 본 발명은 또한 콘크리트 구조물의 보수ㆍ보강을 위하여 바닥 정리단계, 앵커 설치단계, 바닥 보강재 설치단계, 프로파일 설치단계, 프로파일과 콘크리트 구조물의 좌우 측벽 사이 및 개방된 전후의 밀봉단계, 및 모르타르 충전단계로 이루어진 콘크리트 구조물의 보수ㆍ보강 공법에 있어서; 상기 프로파일 설치단계에서 바닥 보강재에 삽입된 클립의 후크가 프로파일과 인접한 프로파일 사이의 철부에 끼워져 설치되고, 프로파일의 요철부가 바닥과 마주 보도록 콘크리트 구조물의 길이방향을 따라 프로파일을 종방향으로 연장 설치하는 것을 특징으로 하는 콘크리트 구조물의 보수ㆍ보강공법에 관한 것이다. 본 발명에 따른 콘크리트 구조물의 보수ㆍ보강공법에 의하면, 무거운 기계장비를 빈번하게 이동하지 않고도 시공이 간편하고 시공 시간을 절감할 수 있는 효과가 있다.
METHOD FOR REPAIRING OR REINFORCING CONCRETE STRUCTURE
콘크리트 구조물의 보수ㆍ보강공법
SHIN DONG GU (author) / PARK DAE OH (author) / SEO CHANG HYUNG (author)
2016-06-01
Patent
Electronic Resource
Korean
European Patent Office | 2019
|European Patent Office | 2019
|European Patent Office | 2017
|Reinforced concrete structure reinforcing and repairing method
European Patent Office | 2023
|European Patent Office | 2015
|