A platform for research: civil engineering, architecture and urbanism
T Constructing method of precast T type modular composite rahmen bridge and composite rahmen bridge constructed by the same and construction thing therefor
The present invention relates to a method for constructing a precast T-type modular composite Rahmen bridge, a composite Rahmen bridge constructed by the construction method, and a structure for constructing the composite Rahmen bridge. The method for constructing the precast T-type modular composite Rahmen bridge includes: a first step (S100) of constructing an abutment wherein a sheath pipe and an anchor where a PS strand is fixated are embedded; a second step (S200) of manufacturing a T-type or a reverse T-type girder, which is a precast (PC) girder with inclined surfaces inclined at 45 degrees on both ends; a third step (S300) of placing the PC girder on the top of the abutment with a crane; a fourth step (S400) integrating the abutment and the girder by inserting the PS strand into the anchor of the abutment, the sheath pipe, and a mounting block of the girder and applying tension to the PS strand; a fifth step (S500) of arranging reinforcements on the PC girder with the PS strand where tension is applied; a sixth step (S600) of placing concrete for forming an upper slab on the PC girder wherein the reinforcements are arranged; and a seventh step (S700) of curing the placed concrete. The method for constructing a PC T-type modular composite Rahmen bridge integrates the abutment and the girder by inserting the PC strand into the sheath pipe embedded in the abutment in advance and the mounting block mounted in the PC girder and applying tension to the PS strand, thereby improving the constructability for connecting the PC girder and the abutment.
본 발명은 프리캐스트 T 타입 모듈형 합성 라멘교의 시공 방법 및 그 시공방법에 의해 시공된 합성 라멘교, 그리고 그 합성 라멘교를 시공하기 위한 구조물에 관한 것이다.본 발명은 PS강연선이 고정되는 앵커와 쉬스관이 매설되는 교대를 축조하는 제1단계(S100)와; 양쪽 단부에 45°로 경사지는 경사면을 구비하는 프리캐스트 거더(Precast: PC)로서, T 타입 또는 역 T 타입 거더를 제작하는 제2단계(S200)와; 상기 프리캐스트 거더를 크레인으로 교대 상단에 거치하는 제3단계(S300)와; 거치된 프리캐스트 거더의 경사면에 정착블록을 설치하고, 교대의 PS강연선 앵커와 쉬스관 및 상기 거더의 정착블록에 PS강연선을 삽입하고 긴장시켜서 교대와 거더를 일체화시키는 제4단계(S400)와; PS강연선이 긴장된 프리캐스트 거더 위에 철근을 배근하는 제5단계(S500)와; 철근이 배근된 프리캐스트 거더 위에 상부 슬래브가 되는 콘크리트를 타설하는 제6단계(S600) 및 타설된 콘크리트를 양생하는 제7단계(S700)를 포함하는 것으로, 교대에 미리 매설하여 놓은 쉬스관과 프리캐스트 거더에 장착되어 있는 정착블록에 PS강연선을 삽입하고 긴장시켜 교대와 프리캐스트 거더를 일체화시킴으로써, 프리캐스트 거더와 교대를 연결하는 시공성을 개선한다.
T Constructing method of precast T type modular composite rahmen bridge and composite rahmen bridge constructed by the same and construction thing therefor
The present invention relates to a method for constructing a precast T-type modular composite Rahmen bridge, a composite Rahmen bridge constructed by the construction method, and a structure for constructing the composite Rahmen bridge. The method for constructing the precast T-type modular composite Rahmen bridge includes: a first step (S100) of constructing an abutment wherein a sheath pipe and an anchor where a PS strand is fixated are embedded; a second step (S200) of manufacturing a T-type or a reverse T-type girder, which is a precast (PC) girder with inclined surfaces inclined at 45 degrees on both ends; a third step (S300) of placing the PC girder on the top of the abutment with a crane; a fourth step (S400) integrating the abutment and the girder by inserting the PS strand into the anchor of the abutment, the sheath pipe, and a mounting block of the girder and applying tension to the PS strand; a fifth step (S500) of arranging reinforcements on the PC girder with the PS strand where tension is applied; a sixth step (S600) of placing concrete for forming an upper slab on the PC girder wherein the reinforcements are arranged; and a seventh step (S700) of curing the placed concrete. The method for constructing a PC T-type modular composite Rahmen bridge integrates the abutment and the girder by inserting the PC strand into the sheath pipe embedded in the abutment in advance and the mounting block mounted in the PC girder and applying tension to the PS strand, thereby improving the constructability for connecting the PC girder and the abutment.
본 발명은 프리캐스트 T 타입 모듈형 합성 라멘교의 시공 방법 및 그 시공방법에 의해 시공된 합성 라멘교, 그리고 그 합성 라멘교를 시공하기 위한 구조물에 관한 것이다.본 발명은 PS강연선이 고정되는 앵커와 쉬스관이 매설되는 교대를 축조하는 제1단계(S100)와; 양쪽 단부에 45°로 경사지는 경사면을 구비하는 프리캐스트 거더(Precast: PC)로서, T 타입 또는 역 T 타입 거더를 제작하는 제2단계(S200)와; 상기 프리캐스트 거더를 크레인으로 교대 상단에 거치하는 제3단계(S300)와; 거치된 프리캐스트 거더의 경사면에 정착블록을 설치하고, 교대의 PS강연선 앵커와 쉬스관 및 상기 거더의 정착블록에 PS강연선을 삽입하고 긴장시켜서 교대와 거더를 일체화시키는 제4단계(S400)와; PS강연선이 긴장된 프리캐스트 거더 위에 철근을 배근하는 제5단계(S500)와; 철근이 배근된 프리캐스트 거더 위에 상부 슬래브가 되는 콘크리트를 타설하는 제6단계(S600) 및 타설된 콘크리트를 양생하는 제7단계(S700)를 포함하는 것으로, 교대에 미리 매설하여 놓은 쉬스관과 프리캐스트 거더에 장착되어 있는 정착블록에 PS강연선을 삽입하고 긴장시켜 교대와 프리캐스트 거더를 일체화시킴으로써, 프리캐스트 거더와 교대를 연결하는 시공성을 개선한다.
T Constructing method of precast T type modular composite rahmen bridge and composite rahmen bridge constructed by the same and construction thing therefor
프리캐스트 T 타입 모듈형 합성 라멘교의 시공 방법 및 그 시공방법에 의해 시공된 합성 라멘교, 그리고 그 합성 라멘교를 시공하기 위한 구조물
KIM YU TAE (author)
2016-10-12
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
European Patent Office | 2019
|PRECAST RAHMEN BRIDGE WITHOUT ABUTTMENT AND THE CONSTRUCTION METHOD THEREFOR
European Patent Office | 2015
|Composite rahmen bridge construction method thereof and steel girder for composite rahmen bridge
European Patent Office | 2021
|