A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR UNDERGROUND FOUNDATION STRUCTURE
The present invention relates to a method for forming an underground foundation structure which forms a stable underground structure supported by a rock layer in an underground structure existing on a position where the rock layer is fairly deep. According to the present invention, the method for forming an underground foundation structure comprises: an upper pillar installation step of installing a hollow upper pillar wherein a hollow space of a prescribed diameter is installed in a first through hole formed in a first drilling step; a second drilling step of using a second drilling bit of a drilling machine moving downwards through the hollow space of the upper pillar to form a second through hole from a lower side of the upper pillar to a rock layer; and a hardener filling step of spraying high pressure water and a hardener while rotating and lifting the second drilling bit, supplying the hardener through the inside of the second drilling bit to spray the hardener from a hardener nozzle on an end of the second drilling bit, and supplying the high pressure water through the inside of the second drilling bit to spray the high pressure water from a high pressure nozzle laterally directed from an upper side of the hardener nozzle to continuously fill the hardener to the hollow space of the upper pillar from the rock layer.
본 발명은 암반층이 상당히 깊은 위치에 존재하는 지중구조에서 암반층에 의해 지지받는 안정된 지중구조물을 형성하는 방법에 관한 것이다. 본 발명에 따른 지중 기초구조물 형성방법은, 1차천공단계에서 형성된 1차관통공에 소정 직경의 중심공이 설치된 중공의 상부기둥을 설치하는 상부기둥설치단계; 상기 상부기둥의 중심공을 통해 하방으로 진행하는 천공기의 제2천공비트를 이용하여 상부기둥의 하측에서 암반층까지 제2관통공을 형성하는 2차천공단계; 상기 제2천공비트를 회전과 함께 상승시키면서 고압수와 경화재를 분사하되, 경화재는 제2천공비트의 내부를 통해 공급되어 제2천공비트의 단부의 경화재노즐에서 분사되고, 고압수는 제2천공비트의 내부를 통해 공급되어 경화재노즐의 상측에서 측방을 향하는 고압수노즐에서 분사됨으로써, 경화재가 암반층에서부터 상부기둥의 중심공까지 연속하여 충적되는 경화재충적단계를 포함한다.
CONSTRUCTION METHOD FOR UNDERGROUND FOUNDATION STRUCTURE
The present invention relates to a method for forming an underground foundation structure which forms a stable underground structure supported by a rock layer in an underground structure existing on a position where the rock layer is fairly deep. According to the present invention, the method for forming an underground foundation structure comprises: an upper pillar installation step of installing a hollow upper pillar wherein a hollow space of a prescribed diameter is installed in a first through hole formed in a first drilling step; a second drilling step of using a second drilling bit of a drilling machine moving downwards through the hollow space of the upper pillar to form a second through hole from a lower side of the upper pillar to a rock layer; and a hardener filling step of spraying high pressure water and a hardener while rotating and lifting the second drilling bit, supplying the hardener through the inside of the second drilling bit to spray the hardener from a hardener nozzle on an end of the second drilling bit, and supplying the high pressure water through the inside of the second drilling bit to spray the high pressure water from a high pressure nozzle laterally directed from an upper side of the hardener nozzle to continuously fill the hardener to the hollow space of the upper pillar from the rock layer.
본 발명은 암반층이 상당히 깊은 위치에 존재하는 지중구조에서 암반층에 의해 지지받는 안정된 지중구조물을 형성하는 방법에 관한 것이다. 본 발명에 따른 지중 기초구조물 형성방법은, 1차천공단계에서 형성된 1차관통공에 소정 직경의 중심공이 설치된 중공의 상부기둥을 설치하는 상부기둥설치단계; 상기 상부기둥의 중심공을 통해 하방으로 진행하는 천공기의 제2천공비트를 이용하여 상부기둥의 하측에서 암반층까지 제2관통공을 형성하는 2차천공단계; 상기 제2천공비트를 회전과 함께 상승시키면서 고압수와 경화재를 분사하되, 경화재는 제2천공비트의 내부를 통해 공급되어 제2천공비트의 단부의 경화재노즐에서 분사되고, 고압수는 제2천공비트의 내부를 통해 공급되어 경화재노즐의 상측에서 측방을 향하는 고압수노즐에서 분사됨으로써, 경화재가 암반층에서부터 상부기둥의 중심공까지 연속하여 충적되는 경화재충적단계를 포함한다.
CONSTRUCTION METHOD FOR UNDERGROUND FOUNDATION STRUCTURE
지중 기초구조물 형성방법
KIM DAE WOO (author) / KIM KI BAEK (author) / KIM SEONG YOON (author)
2016-10-31
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of underground frame foundation connecting structure
European Patent Office | 2021
|Construction method of underground structure in foundation pit
European Patent Office | 2024
|Deep foundation pit underground structure construction formwork structure
European Patent Office | 2021
|Underground garage foundation pit supporting structure and construction method
European Patent Office | 2024
|