arch tunnel construction method using divided type lining form
Disclosed is a tunnel construction method. According to an embodiment of the present invention, the tunnel construction method uses lining foam to construct a tunnel with a passage having a dome-shaped cross section in a temporary steel facility zone where a lining board is supported by a center pile. The lining foam is prepared in a divided form including a pair of side units prepared to correspond to a shape of both sides of the passage, and a middle unit prepared to correspond to a shape of a middle portion between both sides of the passage. The tunnel construction method comprises: (a) a step of positioning the side units on both sides of the temporary steel facility zone, moving the side units in the longitudinal direction of the temporary steel facility zone, and pouring lining concrete on the outside of the side units to construct both side walls of the tunnel; and (b) a step of positioning the middle unit on the temporary steel facility zone between both side walls, moving the middle unit in the longitudinal direction of the temporary steel facility zone, and pouring lining concrete on the outside of the middle unit to construct an upper wall of the tunnel to integrate the upper wall with both side walls.
터널시공방법이 개시된다. 본 발명의 실시 예에 따른 터널시공방법은 복공판이 중앙파일에 의해 지지되는 강재가시설구간에 통로의 횡단면이 돔 형태를 이루는 터널을 라이닝 폼을 이용하여 시공하되, 상기 라이닝폼은 상기 통로의 양 측방부 모양에 대응하게 마련된 한 쌍의 측방유닛과, 상기 통로의 양 측방 사이의 중앙부 모양에 대응하게 마련된 중앙유닛을 포함하는 분할형으로 마련되고, (a) 한 쌍의 상기 측방유닛을 상기 강재가시설구간 양측에 위치시키고 상기 강재가시설구간의 길이방향을 따라 이동시키면서 상기 측방유닛 외측으로 라이닝 콘크리트를 타설하여 상기 터널의 양 측벽을 구축하는 단계; 및 (b) 상기 중앙유닛을 상기 양 측벽 사이의 상기 강재가시설구간에 위치시키고 상기 강재가시설구간의 길이방향을 따라 이동시키면서 상기 중앙유닛 외측으로 라이닝 콘크리트를 타설하여 상기 터널의 상부벽을 상기 양 측벽과 일체화되도록 구축하는 단계;를 포함할 수 있다.
arch tunnel construction method using divided type lining form
Disclosed is a tunnel construction method. According to an embodiment of the present invention, the tunnel construction method uses lining foam to construct a tunnel with a passage having a dome-shaped cross section in a temporary steel facility zone where a lining board is supported by a center pile. The lining foam is prepared in a divided form including a pair of side units prepared to correspond to a shape of both sides of the passage, and a middle unit prepared to correspond to a shape of a middle portion between both sides of the passage. The tunnel construction method comprises: (a) a step of positioning the side units on both sides of the temporary steel facility zone, moving the side units in the longitudinal direction of the temporary steel facility zone, and pouring lining concrete on the outside of the side units to construct both side walls of the tunnel; and (b) a step of positioning the middle unit on the temporary steel facility zone between both side walls, moving the middle unit in the longitudinal direction of the temporary steel facility zone, and pouring lining concrete on the outside of the middle unit to construct an upper wall of the tunnel to integrate the upper wall with both side walls.
터널시공방법이 개시된다. 본 발명의 실시 예에 따른 터널시공방법은 복공판이 중앙파일에 의해 지지되는 강재가시설구간에 통로의 횡단면이 돔 형태를 이루는 터널을 라이닝 폼을 이용하여 시공하되, 상기 라이닝폼은 상기 통로의 양 측방부 모양에 대응하게 마련된 한 쌍의 측방유닛과, 상기 통로의 양 측방 사이의 중앙부 모양에 대응하게 마련된 중앙유닛을 포함하는 분할형으로 마련되고, (a) 한 쌍의 상기 측방유닛을 상기 강재가시설구간 양측에 위치시키고 상기 강재가시설구간의 길이방향을 따라 이동시키면서 상기 측방유닛 외측으로 라이닝 콘크리트를 타설하여 상기 터널의 양 측벽을 구축하는 단계; 및 (b) 상기 중앙유닛을 상기 양 측벽 사이의 상기 강재가시설구간에 위치시키고 상기 강재가시설구간의 길이방향을 따라 이동시키면서 상기 중앙유닛 외측으로 라이닝 콘크리트를 타설하여 상기 터널의 상부벽을 상기 양 측벽과 일체화되도록 구축하는 단계;를 포함할 수 있다.
arch tunnel construction method using divided type lining form
분할식 라이닝폼을 이용한 아치형 터널의 시공방법
KIM CHEOL HONG (author) / KANG HYE IHN (author) / KIM DO YUN (author)
2016-12-26
Patent
Electronic Resource
Korean
arch tunnel construction method using divided type lining form
European Patent Office | 2017
|arch tunnel construction method using divided type lining form
European Patent Office | 2018
CONSTRUCTION METHOD OF TUNNEL LINING AND FORM FOR TUNNEL LINING CONCRETE
European Patent Office | 2019
|Open cut tunnel arc arch lining device and construction method
European Patent Office | 2023