Cutoff wall structure with pile of wall steel pipe and H-beam and construction method of cutoff wall using the same
The present invention relates to a cutoff wall structure comprising a wall steel pile and an H-beam and a construction method (SBS cutoff construction method) for a cutoff wall using the same. The cutoff wall structure comprising the wall steel pile and the H-beam includes: the multiple wall steel piles installed in multiple deep holes formed in a rock layer at fixed intervals; a pair of connection units facing each other in the longitudinal direction on the outer circumference of each of the multiple wall steel piles; and the multiple H-beams installed in the shallow hole formed in the rock layer, wherein a flange on both sides is inserted into a connection unit of the two wall steel piles adjacent each other among the multiple wall steel piles. According to the present invention, the multiple deep holes for installing a cutoff wall structure are not formed in a column type, and the thin holes are alternately driven at fixed intervals. Therefore, the cutoff wall structure can reduce the number of the holes driven to be deep in comparison with an existing cutoff wall structure and can reduce installation costs of the cutoff wall structure by not using large equipment.
본 발명은 벽강관 파일 및 에이치 빔으로 구성된 차수벽 구조 및 이를 이용한 차수벽 공법에 관한 것으로서, 암반층에 일정 간격으로 형성된 복수의 깊은 천공에 설치되는 복수의 벽강관 파일; 상기 복수의 벽강관 파일 각각의 외주면에 길이 방향으로 서로 마주하도록 설치되는 한 쌍의 결합부; 및 상기 복수의 벽강관 파일 중 서로 인접하는 2개의 벽강관 파일의 결합부에 양단의 플랜지가 삽입되며, 상기 암반층에 형성된 얕은 천공에 설치되는 복수의 에이치 빔;을 포함하며, 상기 한 쌍의 결합부의 각각은 상기 벽강관 파일의 길이방향으로 형성되며 상기 에이치 빔의 웨브가 삽입될 수 있는 개구를 포함하며, 상기 에이치 빔을 상기 인접하는 2개의 벽강관 파일의 결합부의 상기 개구에 삽입하면, 상기 에이치 빔의 한 쌍의 플랜지가 상기 인접하는 2개의 벽강관 파일의 결합부에 결합되어 차수 기능을 수행하며, 상기 결합부와 상기 에이치 빔의 플랜지 사이에는 충진부재가 채워지는 것을 특징으로 벽강관 파일 및 에이치 빔으로 구성된 차수벽 구조 및 이를 이용한 차수벽 공법(SBS 차수 공법)을 제공한다. 본 발명에 따르면, 복수의 벽강관 파일이 근입되는 복수의 구멍을 에이치 빔의 폭만큼 이격하여 상대적으로 깊이 천공하고, 벽강관 파일에 결합된 에이치 빔은 암반층에 상대적으로 얕게 천공된 얕은 천공에 의해 지지되므로, 차수벽 구조를 설치하기 위해 복수의 깊은 천공을 주열식으로 천공을 할 필요가 없고, 깊은 천공과 얕은 천공을 번갈아 형성할 수 있다. 따라서, 본 발명에 의한 차수벽 구조를 설치하기 위한 복수의 깊은 천공을 주열식으로 형성하지 않고 일정 간격으로 이격하여 얕은 천공을 번갈아 하므로, 종래 기술에 의한 차수벽 구조에 비해 깊이 천공하는 구멍의 개수를 줄일 수 있고 대형 장비를 사용하지 않아도 되므로 차수벽 구조의 설치 비용을 줄일 수 있다는 이점이 있으며, 인접한 2개의 벽강관 파일의 결합부에 에이치 빔을 삽입하는 것만으로 벽강관 파일과 에이치 빔을 결합할 수 있으므로, 차수벽 구조의 설치가 용이하다는 이점이 있고, 벽강관 파일의 결합부와 에이치 빔 사이의 틈새로 물이 침입하는 것을 방지하기 위해 결합부의 공간에 내부에 그라우트가 충진된 고무 튜브를 설치하므로 벽강관 파일의 결합부와 에이치 빔 사이의 누수 또는 침수를 효과적으로 방지할 수 있다. 또한, 벽강관 파일과 에이치 빔의 저면부가 일체로 연결되어 연속되게 그라우트가 형성되므로 저면부의 완벽한 차수 기능이 발휘될 수 있는 장점이 있다.
Cutoff wall structure with pile of wall steel pipe and H-beam and construction method of cutoff wall using the same
The present invention relates to a cutoff wall structure comprising a wall steel pile and an H-beam and a construction method (SBS cutoff construction method) for a cutoff wall using the same. The cutoff wall structure comprising the wall steel pile and the H-beam includes: the multiple wall steel piles installed in multiple deep holes formed in a rock layer at fixed intervals; a pair of connection units facing each other in the longitudinal direction on the outer circumference of each of the multiple wall steel piles; and the multiple H-beams installed in the shallow hole formed in the rock layer, wherein a flange on both sides is inserted into a connection unit of the two wall steel piles adjacent each other among the multiple wall steel piles. According to the present invention, the multiple deep holes for installing a cutoff wall structure are not formed in a column type, and the thin holes are alternately driven at fixed intervals. Therefore, the cutoff wall structure can reduce the number of the holes driven to be deep in comparison with an existing cutoff wall structure and can reduce installation costs of the cutoff wall structure by not using large equipment.
본 발명은 벽강관 파일 및 에이치 빔으로 구성된 차수벽 구조 및 이를 이용한 차수벽 공법에 관한 것으로서, 암반층에 일정 간격으로 형성된 복수의 깊은 천공에 설치되는 복수의 벽강관 파일; 상기 복수의 벽강관 파일 각각의 외주면에 길이 방향으로 서로 마주하도록 설치되는 한 쌍의 결합부; 및 상기 복수의 벽강관 파일 중 서로 인접하는 2개의 벽강관 파일의 결합부에 양단의 플랜지가 삽입되며, 상기 암반층에 형성된 얕은 천공에 설치되는 복수의 에이치 빔;을 포함하며, 상기 한 쌍의 결합부의 각각은 상기 벽강관 파일의 길이방향으로 형성되며 상기 에이치 빔의 웨브가 삽입될 수 있는 개구를 포함하며, 상기 에이치 빔을 상기 인접하는 2개의 벽강관 파일의 결합부의 상기 개구에 삽입하면, 상기 에이치 빔의 한 쌍의 플랜지가 상기 인접하는 2개의 벽강관 파일의 결합부에 결합되어 차수 기능을 수행하며, 상기 결합부와 상기 에이치 빔의 플랜지 사이에는 충진부재가 채워지는 것을 특징으로 벽강관 파일 및 에이치 빔으로 구성된 차수벽 구조 및 이를 이용한 차수벽 공법(SBS 차수 공법)을 제공한다. 본 발명에 따르면, 복수의 벽강관 파일이 근입되는 복수의 구멍을 에이치 빔의 폭만큼 이격하여 상대적으로 깊이 천공하고, 벽강관 파일에 결합된 에이치 빔은 암반층에 상대적으로 얕게 천공된 얕은 천공에 의해 지지되므로, 차수벽 구조를 설치하기 위해 복수의 깊은 천공을 주열식으로 천공을 할 필요가 없고, 깊은 천공과 얕은 천공을 번갈아 형성할 수 있다. 따라서, 본 발명에 의한 차수벽 구조를 설치하기 위한 복수의 깊은 천공을 주열식으로 형성하지 않고 일정 간격으로 이격하여 얕은 천공을 번갈아 하므로, 종래 기술에 의한 차수벽 구조에 비해 깊이 천공하는 구멍의 개수를 줄일 수 있고 대형 장비를 사용하지 않아도 되므로 차수벽 구조의 설치 비용을 줄일 수 있다는 이점이 있으며, 인접한 2개의 벽강관 파일의 결합부에 에이치 빔을 삽입하는 것만으로 벽강관 파일과 에이치 빔을 결합할 수 있으므로, 차수벽 구조의 설치가 용이하다는 이점이 있고, 벽강관 파일의 결합부와 에이치 빔 사이의 틈새로 물이 침입하는 것을 방지하기 위해 결합부의 공간에 내부에 그라우트가 충진된 고무 튜브를 설치하므로 벽강관 파일의 결합부와 에이치 빔 사이의 누수 또는 침수를 효과적으로 방지할 수 있다. 또한, 벽강관 파일과 에이치 빔의 저면부가 일체로 연결되어 연속되게 그라우트가 형성되므로 저면부의 완벽한 차수 기능이 발휘될 수 있는 장점이 있다.
Cutoff wall structure with pile of wall steel pipe and H-beam and construction method of cutoff wall using the same
벽강관 파일 및 에이치 빔으로 구성된 차수벽 구조 및 이를 이용한 차수벽 공법
LEE HAK GON (author) / JEON KEUM HWA (author)
2017-12-22
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2017
|CUTOFF EXTERIOR WALL STRUCTURE AND CONSTRUCTION METHOD OF CUTOFF EXTERIOR WALL STRUCTURE
European Patent Office | 2024
|CUTOFF STEEL MEMBER AND CONSTRUCTION METHOD OF CUTOFF WALL USING THEREOF
European Patent Office | 2019
|Composite Cutoff Wall Construction
Online Contents | 2016
|