Construction method of non-displacement pile by gelled soil
The present invention relates to a method to construct a non-displacement pile by gelled soil, which is able to insert the pile into gelled soil, which is formed by agitating relaxed soil with a gelling agent in accordance with a rotation and insertion of an agitation equipment, to settle the pile on a supporting ground, and to minimize an impact on the surrounding ground by preventing excavation soil from being generated in case of a construction of the pile, thereby greatly reducing a pile construction period at the same time. According to the present invention, the method to construct the non-displacement pile by gelled soil is to insert the pile into the ground, comprising: (a) a step of measuring a position to construct the pile; (b) a step of placing a displacement excavation unit on a bottom side to form a continuous screw for displacement at the point of constructing the pile, to rotate and insert agitation equipment with an agitation unit having an agitation wing into a top side of the displacement excavation unit, and to form a space unit, from which soil on a top side is removed from the ground surface into a certain depth, thereby relaxing soil in the ground to the supporting ground with the agitation equipment, agitating the relaxed soil and the gelling agent by spraying the gelling agent with the agitation equipment, and temporarily gelling the soil; (c) a step of removing the agitation equipment to insert the pile into the gelled soil by its own load and to settle the pile on the supporting ground; and (d) a step of curing the gelled soil to fixate the pile.
본 발명은 교반장비의 회전 관입에 따라 이완된 토사를 겔화제와 교반하여 형성된 겔화된 토사에 파일을 근입하여 지지 지반에 안착시킴으로써, 파일 매입 시공시 굴착토가 발생하지 않아 주변 지반에 미치는 영향을 최소화함과 동시에 파일 시공 기간을 크게 단축할 수 있는 토사 겔화에 의한 비배토 파일 시공 방법에 대한 것이다. 본 발명은 지반에 파일을 근입하기 위한 것으로, (a) 파일이 시공될 위치를 측량하는 단계; (b) 파일 시공 지점에 배토용 연속 스크류가 형성되는 배토굴착부가 하부에 배치되고, 상기 배토굴착부의 상부에 교반날개가 형성되는 교반부가 배치되는 교반장비를 회전 관입하여 지면에서 일정 깊이까지 상부의 토사가 제거된 공간부가 형성하는 한편, 상기 교반장비로 지지 지반까지 지반 내 토사를 이완시키면서, 상기 교반장비로 겔화제를 분사하여 상기 이완된 토사와 겔화제를 교반함으로써 토사를 일시적으로 겔(gel)화시키는 단계; (c) 상기 교반장비를 제거하고 겔화된 토사 내에 파일을 자중에 의해 근입하여 지지 지반 상에 안착시키는 단계; 및 (d) 겔화된 토사를 양생하여 상기 파일을 고정하는 단계; 를 포함하여 구성되는 것을 특징으로 한다.
Construction method of non-displacement pile by gelled soil
The present invention relates to a method to construct a non-displacement pile by gelled soil, which is able to insert the pile into gelled soil, which is formed by agitating relaxed soil with a gelling agent in accordance with a rotation and insertion of an agitation equipment, to settle the pile on a supporting ground, and to minimize an impact on the surrounding ground by preventing excavation soil from being generated in case of a construction of the pile, thereby greatly reducing a pile construction period at the same time. According to the present invention, the method to construct the non-displacement pile by gelled soil is to insert the pile into the ground, comprising: (a) a step of measuring a position to construct the pile; (b) a step of placing a displacement excavation unit on a bottom side to form a continuous screw for displacement at the point of constructing the pile, to rotate and insert agitation equipment with an agitation unit having an agitation wing into a top side of the displacement excavation unit, and to form a space unit, from which soil on a top side is removed from the ground surface into a certain depth, thereby relaxing soil in the ground to the supporting ground with the agitation equipment, agitating the relaxed soil and the gelling agent by spraying the gelling agent with the agitation equipment, and temporarily gelling the soil; (c) a step of removing the agitation equipment to insert the pile into the gelled soil by its own load and to settle the pile on the supporting ground; and (d) a step of curing the gelled soil to fixate the pile.
본 발명은 교반장비의 회전 관입에 따라 이완된 토사를 겔화제와 교반하여 형성된 겔화된 토사에 파일을 근입하여 지지 지반에 안착시킴으로써, 파일 매입 시공시 굴착토가 발생하지 않아 주변 지반에 미치는 영향을 최소화함과 동시에 파일 시공 기간을 크게 단축할 수 있는 토사 겔화에 의한 비배토 파일 시공 방법에 대한 것이다. 본 발명은 지반에 파일을 근입하기 위한 것으로, (a) 파일이 시공될 위치를 측량하는 단계; (b) 파일 시공 지점에 배토용 연속 스크류가 형성되는 배토굴착부가 하부에 배치되고, 상기 배토굴착부의 상부에 교반날개가 형성되는 교반부가 배치되는 교반장비를 회전 관입하여 지면에서 일정 깊이까지 상부의 토사가 제거된 공간부가 형성하는 한편, 상기 교반장비로 지지 지반까지 지반 내 토사를 이완시키면서, 상기 교반장비로 겔화제를 분사하여 상기 이완된 토사와 겔화제를 교반함으로써 토사를 일시적으로 겔(gel)화시키는 단계; (c) 상기 교반장비를 제거하고 겔화된 토사 내에 파일을 자중에 의해 근입하여 지지 지반 상에 안착시키는 단계; 및 (d) 겔화된 토사를 양생하여 상기 파일을 고정하는 단계; 를 포함하여 구성되는 것을 특징으로 한다.
Construction method of non-displacement pile by gelled soil
토사 겔화에 의한 비배토 파일 시공 방법
SONG KI YONG (author)
2018-03-22
Patent
Electronic Resource
Korean