A platform for research: civil engineering, architecture and urbanism
METHOD OF CONSTRUCTING BRIDGE GIRDER WITH IMPROVED ANTI-EROSION AND BRIDGE GIRDER USING THE SAME
The present invention relates to a method of manufacturing a bridge girder, and a grouting apparatus used thereby. The method of manufacturing a bridge girder comprises: a girder preparation step of preparing a girder with a sheath pipe installed thereon; a steel strand insertion step of inserting a plurality of sheathed steel strands where steel strands are formed to be moved in an axial direction in sheaths into the sheath pipe; a grouting step of injecting a grout material into the sheath pipe and curing the grout material to integrate the sheaths of the sheathed steel strands into the grout material; and a prestress introduction step of tensioning and fixing the steel strands of the sheathed steel strands to introduce prestress to the girder after the grouting step. The sheathed steel strands are used to prevent damage to the sheaths to improve corrosion resistance. Re-tensioning and steel strand replacement are possible. The steel strands in the sheath pipe are evenly dispersed or are definitely positioned on a lower side to introduce high compressive prestress.
본 발명은 교량용 거더의 제작 방법 및 이에 사용되는 그라우팅 장치에 관한 것으로, 쉬스관이 설치된 거더를 준비하는 거더 준비단계와; 피복 내에서 강연선이 축선 방향으로 이동 가능하게 형성된 피복 강연선을 상기 쉬스관에 다수 삽입하는 강연선 삽입단계와; 상기 쉬스관 내부에 그라우트재를 주입하고 양생하여, 상기 피복 강연선의 상기 피복이 상기 그라우트재와 일체화되게 하는 그라우팅 단계와; 상기 그라우팅 단계 이후에, 상기 피복 강연선의 강연선을 긴장 정착하여 상기 거더에 프리스트레스를 도입하는 프리스트레스 도입단계를; 포함하여 구성되어, 피복 강연선을 이용하여 피복의 손상을 방지하여 내부식성 효과를 확실히 높일 수 있으며, 재긴장과 강연선 교체도 가능하며, 쉬스관 내의 강연선의 배치를 골고루 분산시키거나 하측에 확실하게 위치시켜 보다 높은 압축 프리스트레스를 도입하는 교량용 거더의 제작 방법 및 이에 사용되는 그라우팅 장치를 제공한다.
METHOD OF CONSTRUCTING BRIDGE GIRDER WITH IMPROVED ANTI-EROSION AND BRIDGE GIRDER USING THE SAME
The present invention relates to a method of manufacturing a bridge girder, and a grouting apparatus used thereby. The method of manufacturing a bridge girder comprises: a girder preparation step of preparing a girder with a sheath pipe installed thereon; a steel strand insertion step of inserting a plurality of sheathed steel strands where steel strands are formed to be moved in an axial direction in sheaths into the sheath pipe; a grouting step of injecting a grout material into the sheath pipe and curing the grout material to integrate the sheaths of the sheathed steel strands into the grout material; and a prestress introduction step of tensioning and fixing the steel strands of the sheathed steel strands to introduce prestress to the girder after the grouting step. The sheathed steel strands are used to prevent damage to the sheaths to improve corrosion resistance. Re-tensioning and steel strand replacement are possible. The steel strands in the sheath pipe are evenly dispersed or are definitely positioned on a lower side to introduce high compressive prestress.
본 발명은 교량용 거더의 제작 방법 및 이에 사용되는 그라우팅 장치에 관한 것으로, 쉬스관이 설치된 거더를 준비하는 거더 준비단계와; 피복 내에서 강연선이 축선 방향으로 이동 가능하게 형성된 피복 강연선을 상기 쉬스관에 다수 삽입하는 강연선 삽입단계와; 상기 쉬스관 내부에 그라우트재를 주입하고 양생하여, 상기 피복 강연선의 상기 피복이 상기 그라우트재와 일체화되게 하는 그라우팅 단계와; 상기 그라우팅 단계 이후에, 상기 피복 강연선의 강연선을 긴장 정착하여 상기 거더에 프리스트레스를 도입하는 프리스트레스 도입단계를; 포함하여 구성되어, 피복 강연선을 이용하여 피복의 손상을 방지하여 내부식성 효과를 확실히 높일 수 있으며, 재긴장과 강연선 교체도 가능하며, 쉬스관 내의 강연선의 배치를 골고루 분산시키거나 하측에 확실하게 위치시켜 보다 높은 압축 프리스트레스를 도입하는 교량용 거더의 제작 방법 및 이에 사용되는 그라우팅 장치를 제공한다.
METHOD OF CONSTRUCTING BRIDGE GIRDER WITH IMPROVED ANTI-EROSION AND BRIDGE GIRDER USING THE SAME
강연선의 내부식성과 프리스트레스의 도입 특성이 향상된 교량용 거더의 제작 방법 및 이에 의해 제작된 교량용 거더
HONG HYUN KWON (author) / LIM CHUL WON (author)
2018-05-24
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
PRESTRESSED CONCRETE GIRDER AND METHOD CONSTRUCTING THE GIRDER BRIDGE USING THE SAME
European Patent Office | 2015
|European Patent Office | 2022
European Patent Office | 2021
|PSC the structure of constructing PSC girder bridge and the method of constructing PSC girder bridge
European Patent Office | 2018
|