A platform for research: civil engineering, architecture and urbanism
prefabricated molding and Construction method of outer wall aluminum panel using prefabricated molding
The present invention provides a prefabricated molding which can be used for outer wall construction by adjusting an interval between aluminum panels, in which the interval is generated by a cutting error generated when cutting the panel and a construction error connecting continuously in multistage. According to the present invention, the prefabricated molding can adjust the interval between the aluminum panels generated by the cutting error and construction error as much as an adjustment width by assembling a second molding to move from side to side as much as the adjustment width after inserting a first molding into the second molding in a state of combining the aluminum panel with two separated moldings respectively, thereby preventing additional operation such as re-cutting or re-constructing of the aluminum panel.
본 발명은 패널 재단시 발생하는 재단오차 및 다단으로 연속적으로 연결하는 시공오차에 의하여 발생하는 알루미늄패널간 간격을 조정하며 외벽 시공을 할 수 있는 조립식 몰딩을 제공한다. 본 발명에 따르면 분리된 2개의 몰딩 각각에 알루미늄패널 체결한 상태에서 제1 몰딩을 제2 몰딩에 삽입 후 제2 몰딩을 조정폭만큼 좌우 이동하여 조립함으로써 재단오차 및 시공오차에 의하여 발생한 알루미늄패널간 간격을 조정폭만큼 조정할 수 있음으로 다시 알루미늄패널을 재단하거나 시공하는 등의 추가적인 작업을 방지할 수 있다.
prefabricated molding and Construction method of outer wall aluminum panel using prefabricated molding
The present invention provides a prefabricated molding which can be used for outer wall construction by adjusting an interval between aluminum panels, in which the interval is generated by a cutting error generated when cutting the panel and a construction error connecting continuously in multistage. According to the present invention, the prefabricated molding can adjust the interval between the aluminum panels generated by the cutting error and construction error as much as an adjustment width by assembling a second molding to move from side to side as much as the adjustment width after inserting a first molding into the second molding in a state of combining the aluminum panel with two separated moldings respectively, thereby preventing additional operation such as re-cutting or re-constructing of the aluminum panel.
본 발명은 패널 재단시 발생하는 재단오차 및 다단으로 연속적으로 연결하는 시공오차에 의하여 발생하는 알루미늄패널간 간격을 조정하며 외벽 시공을 할 수 있는 조립식 몰딩을 제공한다. 본 발명에 따르면 분리된 2개의 몰딩 각각에 알루미늄패널 체결한 상태에서 제1 몰딩을 제2 몰딩에 삽입 후 제2 몰딩을 조정폭만큼 좌우 이동하여 조립함으로써 재단오차 및 시공오차에 의하여 발생한 알루미늄패널간 간격을 조정폭만큼 조정할 수 있음으로 다시 알루미늄패널을 재단하거나 시공하는 등의 추가적인 작업을 방지할 수 있다.
prefabricated molding and Construction method of outer wall aluminum panel using prefabricated molding
조립식 몰딩 및 이를 이용한 외벽 알루미늄패널 시공방법
JEONG YONG SU (author)
2019-01-08
Patent
Electronic Resource
Korean
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Construction method of outer wall aluminum panel using prefabricated molding
European Patent Office | 2017
|PREFABRICATED MOLDING AND METHOD FOR CONSTRUCTING OUTER WALL ALUMINUM PANEL BY USING SAME
European Patent Office | 2020
|Outer wall prefabricated panel, outer wall and construction method
European Patent Office | 2024
|Prefabricated outer wall structure and construction method
European Patent Office | 2024
|Construction method of prefabricated wall using prefabricated wall module
European Patent Office | 2021
|