Simultaneous propulsion construction method using double pipe
The present invention relates to a construction method for simultaneously propelling a double pipe comprising a blast pipe and a main pipe, using a non-excavation type pipeline construction method which directly builds a pipeline such as a service water pipe and a sewer pipe underground without excavating the ground. The construction method for simultaneously propelling a blast pipe and a main pipe using a double pipe handles a station bed excavation process which forms a propel station and an arrival station at both ends of a pipeline to be constructed, respectively. Then, a pipeline construction process is handled by gradually drilling and filling a double pipe comprising a blast pipe and a main pipe from the propel station, so as to connect the same to each other in order to form a pipeline, before burying again the propel station and the arrival station so as to form a pipeline underground.
본 발명은 땅을 파지 않고 지중에 상수관, 하수관 등과 같은 관로를 직접 시공하는 비개착식 관로 부설공법을 이용하여 추진관과 본관으로 이루어진 이중관을 동시 추진시키는 부설공법에 관한 것으로서, 보다 상세하면 시공될 관로의 양쪽 끝에 추진기지와 도달기지를 각각 형성시키는 기지 터파기공정을 처리하고, 상기 추진기지에서부터 추진관과 본관으로 이루어진 이중관을 순차적으로 굴진 및 충진 시키며 서로 연결하여 관로를 형성키는 관로 부설공정을 처리한 후, 상기 추진기지와 도달기지를 되메움으로써 지중에 관로를 형성시킬 수 있는 이중관을 이용한 추진관과 본관의 동시 추진 부설공법에 관한 것이다.
Simultaneous propulsion construction method using double pipe
The present invention relates to a construction method for simultaneously propelling a double pipe comprising a blast pipe and a main pipe, using a non-excavation type pipeline construction method which directly builds a pipeline such as a service water pipe and a sewer pipe underground without excavating the ground. The construction method for simultaneously propelling a blast pipe and a main pipe using a double pipe handles a station bed excavation process which forms a propel station and an arrival station at both ends of a pipeline to be constructed, respectively. Then, a pipeline construction process is handled by gradually drilling and filling a double pipe comprising a blast pipe and a main pipe from the propel station, so as to connect the same to each other in order to form a pipeline, before burying again the propel station and the arrival station so as to form a pipeline underground.
본 발명은 땅을 파지 않고 지중에 상수관, 하수관 등과 같은 관로를 직접 시공하는 비개착식 관로 부설공법을 이용하여 추진관과 본관으로 이루어진 이중관을 동시 추진시키는 부설공법에 관한 것으로서, 보다 상세하면 시공될 관로의 양쪽 끝에 추진기지와 도달기지를 각각 형성시키는 기지 터파기공정을 처리하고, 상기 추진기지에서부터 추진관과 본관으로 이루어진 이중관을 순차적으로 굴진 및 충진 시키며 서로 연결하여 관로를 형성키는 관로 부설공정을 처리한 후, 상기 추진기지와 도달기지를 되메움으로써 지중에 관로를 형성시킬 수 있는 이중관을 이용한 추진관과 본관의 동시 추진 부설공법에 관한 것이다.
Simultaneous propulsion construction method using double pipe
추진관과 본관으로 이루어진 관로 부설용 이중관의 동시 추진 부설공법
YOO HYUN JUNG (author) / SONG INJAI (author) / SONG WONCHUL (author)
2019-01-30
Patent
Electronic Resource
Korean
2 Trenchless construction method of underground structures using double rows steel pipe propulsion
European Patent Office | 2022
|STEEL PIPE STEEL PIPE PROPULSION APPARATUS AND CONSTRUCTION METHOD USING THE SAME
European Patent Office | 2018
|Simultaneous injection pipe and construction method using it
European Patent Office | 2022
|CONSTRUCTION METHOD OF DOUBLE PIPE PILE AND DOUBLE PIPE PILE
European Patent Office | 2018
|