TEMPORARY BRIDGE CONSTRUCTION METHOD USING STEEL GIRDER AND COMPOSITE DECK-PLATE AND TEMPORARY BRIDGE THEREWITH
The present invention relates to a method for constructing a temporary bridge using a steel girder and a steel composite deck plate and a temporary bridge constructed thereby, which can manufacture a steel girder with effectively increased rigidity and mount a steel composite deck plate on the upper portion of the steel girder for the steel composite deck plate to be rapidly installed to and detached from the steel girder. The method for constructing a temporary bridge using a steel girder and a steel composite deck plate comprises: (a) constructing a pile as a temporary vent; (b) mounting and connecting the steel girder in the transverse direction between upper surfaces of the pile; and (c) sequentially installing the steel composite deck plate in the transverse direction while the steel composite deck plate provided with an upper plate extending in the transverse direction in accordance with a width of the temporary bridge and a lower steel beam integrated with the lower surface of the upper plate is mounted on and connected to the upper surface of the steel girder.
강거더의 강성을 효율적으로 증대시켜 제작하고, 강거더 상부에 강합성복공판을 거치하여 신속한 조립 설치 및 해체가 가능한 강거더와 강합성복공판을 이용한 가설교량 시공방법 및 이를 이용하여 시공된 가설교량에 관한 것으로서, 상기 시공방법은 (a) 가설벤트로서 파일을 시공하는 단계; (b) 상기 파일 상면 사이에 종방향으로 강거더를 거치하고 연결시키는 단계; (c) 상기 강거더 상면에 횡방향으로 가설교량의 폭에 따라 연장된 상부판과 상기 상부판 저면에 일체화된 하부강재빔을 포함하는 강합성복공판을 거치하고 연결시키면서 강합성복공판을 종방향으로 서로 연속하여 설치하는 단계;를 포함한다.
TEMPORARY BRIDGE CONSTRUCTION METHOD USING STEEL GIRDER AND COMPOSITE DECK-PLATE AND TEMPORARY BRIDGE THEREWITH
The present invention relates to a method for constructing a temporary bridge using a steel girder and a steel composite deck plate and a temporary bridge constructed thereby, which can manufacture a steel girder with effectively increased rigidity and mount a steel composite deck plate on the upper portion of the steel girder for the steel composite deck plate to be rapidly installed to and detached from the steel girder. The method for constructing a temporary bridge using a steel girder and a steel composite deck plate comprises: (a) constructing a pile as a temporary vent; (b) mounting and connecting the steel girder in the transverse direction between upper surfaces of the pile; and (c) sequentially installing the steel composite deck plate in the transverse direction while the steel composite deck plate provided with an upper plate extending in the transverse direction in accordance with a width of the temporary bridge and a lower steel beam integrated with the lower surface of the upper plate is mounted on and connected to the upper surface of the steel girder.
강거더의 강성을 효율적으로 증대시켜 제작하고, 강거더 상부에 강합성복공판을 거치하여 신속한 조립 설치 및 해체가 가능한 강거더와 강합성복공판을 이용한 가설교량 시공방법 및 이를 이용하여 시공된 가설교량에 관한 것으로서, 상기 시공방법은 (a) 가설벤트로서 파일을 시공하는 단계; (b) 상기 파일 상면 사이에 종방향으로 강거더를 거치하고 연결시키는 단계; (c) 상기 강거더 상면에 횡방향으로 가설교량의 폭에 따라 연장된 상부판과 상기 상부판 저면에 일체화된 하부강재빔을 포함하는 강합성복공판을 거치하고 연결시키면서 강합성복공판을 종방향으로 서로 연속하여 설치하는 단계;를 포함한다.
TEMPORARY BRIDGE CONSTRUCTION METHOD USING STEEL GIRDER AND COMPOSITE DECK-PLATE AND TEMPORARY BRIDGE THEREWITH
강거더와 강합성복공판을 이용한 가설교량 시공방법 및 이를 이용하여 시공된 가설교량
JUN HA YOUNG (author)
2019-03-27
Patent
Electronic Resource
Korean