.TEMPORARY PRESTRESS DECK FOR STEEL BRIDGE.
The present invention provides a construction method for a bridge. According to the present invention, the construction method for a bridge includes: a box type steel girder mounting step of mounting a box type steel girder (300) on an abutment or a pier; a deck preparing step of preparing a deck (100) manufactured in a reinforced concrete structure; a deck installing step of installing the deck (100) in the lower part of the box type steel girder (300) in order for a precompression load to be applied to the box type steel girder (300); a mold installing step of installing a mold (A) for installing a slab (1) using the deck (100) as a worktable; a concrete placing and curing step of placing concrete into a mold (A) and curing the concrete to form the slab (1); and a deck removing step of removing the deck (100) and applying an upward force to the bridge. According to the present invention, a load of the upward force can be applied to an upper structure of the bridge in which the box type steel girder and the slab are composed without an additional hydraulic device or a generation device. Also, the construction method for a bridge enables a worker to stably perform a work in a high place and prevents an accident in a site.
본 발명에 따른 교량의 시공방법은 교대 또는 교각에 상기 박스형 강재거더(300)를 거치하는 박스형 강재거더 거치단계; 철근콘크리트 구조로 제작된 데크(100)를 준비하는 데크준비단계; 상기 박스형 강재거더(300)에 선행하중이 작용하도록 상기 박스형 강재거더(300)의 하부에 상기 데크(100)를 설치하는 데크설치단계; 상기 데크(100)를 작업대로 이용하여 상기 바닥판(1)의 설치를 위한 거푸집(A)을 설치하는 거푸집 설치단계; 상기 거푸집(A)에 콘크리트를 타설하고 양생하여 상기 바닥판(1)을 형성하는 콘크리트 타설 및 양생단계; 및 상기 데크(100)를 제거하여 상기 교량에 상향력을 도입하는 데크제거단계;를 포함하는 것을 특징으로 하는 교량의 시공방법을 제시한다. 본 발명에 따르면 별도의 유압장치나 발전장치 없이 박스형 강재거더와 바닥판이 합성된 교량의 상부구조물에 상향력의 하중을 도입할 수 있다. 또한, 본 발명의 시공방법을 이용하여 안정적인 고공작업을 수행함은 물론 현장에서의 안전사고를 예방할 수 있다.
.TEMPORARY PRESTRESS DECK FOR STEEL BRIDGE.
The present invention provides a construction method for a bridge. According to the present invention, the construction method for a bridge includes: a box type steel girder mounting step of mounting a box type steel girder (300) on an abutment or a pier; a deck preparing step of preparing a deck (100) manufactured in a reinforced concrete structure; a deck installing step of installing the deck (100) in the lower part of the box type steel girder (300) in order for a precompression load to be applied to the box type steel girder (300); a mold installing step of installing a mold (A) for installing a slab (1) using the deck (100) as a worktable; a concrete placing and curing step of placing concrete into a mold (A) and curing the concrete to form the slab (1); and a deck removing step of removing the deck (100) and applying an upward force to the bridge. According to the present invention, a load of the upward force can be applied to an upper structure of the bridge in which the box type steel girder and the slab are composed without an additional hydraulic device or a generation device. Also, the construction method for a bridge enables a worker to stably perform a work in a high place and prevents an accident in a site.
본 발명에 따른 교량의 시공방법은 교대 또는 교각에 상기 박스형 강재거더(300)를 거치하는 박스형 강재거더 거치단계; 철근콘크리트 구조로 제작된 데크(100)를 준비하는 데크준비단계; 상기 박스형 강재거더(300)에 선행하중이 작용하도록 상기 박스형 강재거더(300)의 하부에 상기 데크(100)를 설치하는 데크설치단계; 상기 데크(100)를 작업대로 이용하여 상기 바닥판(1)의 설치를 위한 거푸집(A)을 설치하는 거푸집 설치단계; 상기 거푸집(A)에 콘크리트를 타설하고 양생하여 상기 바닥판(1)을 형성하는 콘크리트 타설 및 양생단계; 및 상기 데크(100)를 제거하여 상기 교량에 상향력을 도입하는 데크제거단계;를 포함하는 것을 특징으로 하는 교량의 시공방법을 제시한다. 본 발명에 따르면 별도의 유압장치나 발전장치 없이 박스형 강재거더와 바닥판이 합성된 교량의 상부구조물에 상향력의 하중을 도입할 수 있다. 또한, 본 발명의 시공방법을 이용하여 안정적인 고공작업을 수행함은 물론 현장에서의 안전사고를 예방할 수 있다.
.TEMPORARY PRESTRESS DECK FOR STEEL BRIDGE.
공장제작형 콘크리트 데크를 이용한 박스형 강재거더 교량의 시공방법.
JEONG HAE YOUNG (author)
2017-01-25
Patent
Electronic Resource
Korean