Construction method of inspection passage for bridge
The present invention relates to a bridge inspection passage construction method for placing an anchor fixture on an inner side of a steel form by a magnetic module attached to an outer side of the steel form so as to be easily and stably embedded in a bridge structure, thereby increasing workability and shortening a construction period by easily fixing an inspection passage to the bridge structure without an anchor hole drilling work. The bridge inspection passage construction method comprises the steps of: (a) attaching the magnetic module to an outer side of the steel form for concrete placement for the bridge structure, and attaching an embedded anchor fixture for fixing an anchor bolt for fixing the inspection passage at a corresponding position of the inner side of the steel form by means of a magnetic force of the magnetic module; (b) constructing the bridge structure by pouring concrete in the steel form; (c) removing the magnetic module by releasing the magnetic force of the magnetic module after curing the concrete, and separating the steel form; and (d) fixing the inspection passage to the side of the bridge structure by coupling the anchor bolt to the embedded anchor fixture.
본 발명은 강재 거푸집 외측면에 부착되는 마그네틱모듈에 의하여 앵커 고정구를 강재 거푸집 내측면에 위치시켜 교량 구조물 내에 쉽고 안정적으로 매립되도록 함으로써, 앵커홀 천공 작업 없이 점검통로를 교량 구조물에 용이하게 고정하여 시공성 향상 및 공기 단축이 가능한 교량 점검통로 시공 방법에 대한 것이다. 본 발명 교량 점검통로 시공 방법은 (a) 교량 구조물의 콘크리트 타설을 위한 강재 거푸집의 외측면에는 마그네틱모듈을 부착하고, 강재 거푸집 내측면의 대응되는 위치에는 점검통로 고정용 앵커볼트를 고정하기 위한 매입형 앵커 고정구를 상기 마그네틱모듈의 자력에 의해 부착하는 단계; (b) 상기 강재 거푸집의 내부에 콘크리트를 타설하여 교량 구조물을 시공하는 단계; (c) 콘크리트 양생 후 마그네틱모듈의 자력을 해제하여 마그네틱모듈을 제거하고 강재 거푸집을 탈형하는 단계; 및 (d) 상기 앵커볼트를 매입형 앵커 고정구에 결합하여 점검통로를 교량 구조물의 측면에 고정하는 단계; 로 구성되는 것을 특징으로 한다.
Construction method of inspection passage for bridge
The present invention relates to a bridge inspection passage construction method for placing an anchor fixture on an inner side of a steel form by a magnetic module attached to an outer side of the steel form so as to be easily and stably embedded in a bridge structure, thereby increasing workability and shortening a construction period by easily fixing an inspection passage to the bridge structure without an anchor hole drilling work. The bridge inspection passage construction method comprises the steps of: (a) attaching the magnetic module to an outer side of the steel form for concrete placement for the bridge structure, and attaching an embedded anchor fixture for fixing an anchor bolt for fixing the inspection passage at a corresponding position of the inner side of the steel form by means of a magnetic force of the magnetic module; (b) constructing the bridge structure by pouring concrete in the steel form; (c) removing the magnetic module by releasing the magnetic force of the magnetic module after curing the concrete, and separating the steel form; and (d) fixing the inspection passage to the side of the bridge structure by coupling the anchor bolt to the embedded anchor fixture.
본 발명은 강재 거푸집 외측면에 부착되는 마그네틱모듈에 의하여 앵커 고정구를 강재 거푸집 내측면에 위치시켜 교량 구조물 내에 쉽고 안정적으로 매립되도록 함으로써, 앵커홀 천공 작업 없이 점검통로를 교량 구조물에 용이하게 고정하여 시공성 향상 및 공기 단축이 가능한 교량 점검통로 시공 방법에 대한 것이다. 본 발명 교량 점검통로 시공 방법은 (a) 교량 구조물의 콘크리트 타설을 위한 강재 거푸집의 외측면에는 마그네틱모듈을 부착하고, 강재 거푸집 내측면의 대응되는 위치에는 점검통로 고정용 앵커볼트를 고정하기 위한 매입형 앵커 고정구를 상기 마그네틱모듈의 자력에 의해 부착하는 단계; (b) 상기 강재 거푸집의 내부에 콘크리트를 타설하여 교량 구조물을 시공하는 단계; (c) 콘크리트 양생 후 마그네틱모듈의 자력을 해제하여 마그네틱모듈을 제거하고 강재 거푸집을 탈형하는 단계; 및 (d) 상기 앵커볼트를 매입형 앵커 고정구에 결합하여 점검통로를 교량 구조물의 측면에 고정하는 단계; 로 구성되는 것을 특징으로 한다.
Construction method of inspection passage for bridge
교량 점검통로 시공 방법
PARK HOUNG NAM (author)
2020-01-29
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
LAYING TYPE BRIDGE INSPECTION PASSAGE AND CONSTRUCTION METHOD
European Patent Office | 2019
|LAYING TYPE BRIDGE INSPECTION PASSAGE AND CONSTRUCTION METHOD
European Patent Office | 2022
|LAYING TYPE BRIDGE INSPECTION PASSAGE AND CONSTRUCTION METHOD
European Patent Office | 2023