INCREMENTAL LAUNCHING METHOD USING STEEL-CONCRETE COMPOSITE AND STEEL-CONCRETE COMPOSITE BRIDGE CONSTRUCTED BY THE SAME
Disclosed is a steel composite incremental launching method. The steel composite incremental launching method includes: a step (a) of steel-composing a first floor plate slab with respect to a first segment of a steel girder at a casting bed on the back side in the longitudinal direction of an abutment and incrementally launching the same to the front side in the longitudinal direction of the abutment; and a step (b) of steel-composing a second floor plate slab with respect to a second segment, which is the next segment of the first segment in the casting bed and connected to the first segment, and incrementally launching the same to the front side in the longitudinal direction of the abutment, wherein the step (a) and the step (b) are repeatedly performed at least one time.
강합성 압출공법이 개시되며, 상기 강합성 압출공법은, (a) 교대의 종방향 후방의 제작장에서 강재거더의 제1 세그먼트에 대하여 제1 바닥판슬래브를 강합성하고 상기 교대의 종방향 전방으로 압출하는 단계; 및 (b) 상기 제작장에서 상기 제1 세그먼트의 다음 세그먼트로서 상기 제1 세그먼트와 연결되는 제2 세그먼트에 대하여 제2 바닥판슬래브를 강합성하고 상기 교대의 종방향 전방으로 압출하는 단계를 포함하고, 상기 (a) 단계와 상기 (b) 단계는 적어도 1회 이상 반복 수행된다.
INCREMENTAL LAUNCHING METHOD USING STEEL-CONCRETE COMPOSITE AND STEEL-CONCRETE COMPOSITE BRIDGE CONSTRUCTED BY THE SAME
Disclosed is a steel composite incremental launching method. The steel composite incremental launching method includes: a step (a) of steel-composing a first floor plate slab with respect to a first segment of a steel girder at a casting bed on the back side in the longitudinal direction of an abutment and incrementally launching the same to the front side in the longitudinal direction of the abutment; and a step (b) of steel-composing a second floor plate slab with respect to a second segment, which is the next segment of the first segment in the casting bed and connected to the first segment, and incrementally launching the same to the front side in the longitudinal direction of the abutment, wherein the step (a) and the step (b) are repeatedly performed at least one time.
강합성 압출공법이 개시되며, 상기 강합성 압출공법은, (a) 교대의 종방향 후방의 제작장에서 강재거더의 제1 세그먼트에 대하여 제1 바닥판슬래브를 강합성하고 상기 교대의 종방향 전방으로 압출하는 단계; 및 (b) 상기 제작장에서 상기 제1 세그먼트의 다음 세그먼트로서 상기 제1 세그먼트와 연결되는 제2 세그먼트에 대하여 제2 바닥판슬래브를 강합성하고 상기 교대의 종방향 전방으로 압출하는 단계를 포함하고, 상기 (a) 단계와 상기 (b) 단계는 적어도 1회 이상 반복 수행된다.
INCREMENTAL LAUNCHING METHOD USING STEEL-CONCRETE COMPOSITE AND STEEL-CONCRETE COMPOSITE BRIDGE CONSTRUCTED BY THE SAME
강합성 압출공법 및 이에 의해 시공되는 강합성 교량
CHO KYUNG SIK (author) / KIM WOO JONG (author) / KANG SIN OH (author)
2020-02-03
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Trans Tech Publications | 2014
|British Library Online Contents | 2014
|Modelling of concrete bridge structures constructed by incremental launching
Tema Archive | 2008
|Analysis of post-tensioned concrete bridge constructed using incremental launching method
BASE | 2019
|