A platform for research: civil engineering, architecture and urbanism
PRESETTING METHOD FOR BEARING AND PRESETTING BEARING
Disclosed is a presetting method for a bridge bearing which facilitates presetting. The presetting method for a bridge bearing comprises: (a) a step of arranging a bridge bearing with a slide surface allowing a bearing unit to slide and move thereon and being formed on the upper surface of a lower plate coming in contact with the bearing unit between a substructure and a superstructure; (b) a step of considering a longitudinal length change of the superstructure in accordance with a daily temperature change to arrange a first wedge unit between a first limiting protrusion formed on one longitudinal side of the upper surface of the lower plate and the bearing unit and arrange a second wedge unit between a second limiting protrusion formed on the other longitudinal side of the upper surface of the lower plate and the bearing unit to allow the bearing unit to be relatively moved to a target position of one longitudinal side with respect to the superstructure; and (c) a step of fixing the bearing unit to prevent a longitudinal movement of the bearing unit with respect to the slide surface when the bearing unit is moved to the target position.
교량받침의 프리세팅 방법이 개시되며, 상기 교량받침의 프리세팅 방법은, (a) 상기 받침유닛이 접촉되는 상기 하부판의 상면에 상기 받침유닛이 슬라이드 이동 가능한 슬라이드면이 형성된 상기 교량받침을 상기 하부구조물과 상기 상부구조물 사이에 배치하는 단계; (b) 상기 상부구조물에 대하여 상기 받침유닛이 상대적으로 종 방향 일측의 목표 위치로 이동되도록, 상기 상부구조물의 일일 온도변화에 따른 종 방향 길이 변화를 고려하여, 상기 하부판의 상면의 종 방향 일측에 형성된 제1 제한턱과 상기 받침유닛 사이에 제1 쐐기유닛을 배치하고, 상기 하부판 상면의 종 방향 타측에 형성된 제2 제한턱과 상기 받침유닛 사이에 제2 쐐기유닛을 배치하는 단계; 및 (c) 상기 받침유닛이 상기 목표 위치로 이동되면, 상기 슬라이드면에 대한 상기 받침유닛의 종 방향 이동이 방지되도록 상기 받침유닛을 고정하는 단계를 포함한다.
PRESETTING METHOD FOR BEARING AND PRESETTING BEARING
Disclosed is a presetting method for a bridge bearing which facilitates presetting. The presetting method for a bridge bearing comprises: (a) a step of arranging a bridge bearing with a slide surface allowing a bearing unit to slide and move thereon and being formed on the upper surface of a lower plate coming in contact with the bearing unit between a substructure and a superstructure; (b) a step of considering a longitudinal length change of the superstructure in accordance with a daily temperature change to arrange a first wedge unit between a first limiting protrusion formed on one longitudinal side of the upper surface of the lower plate and the bearing unit and arrange a second wedge unit between a second limiting protrusion formed on the other longitudinal side of the upper surface of the lower plate and the bearing unit to allow the bearing unit to be relatively moved to a target position of one longitudinal side with respect to the superstructure; and (c) a step of fixing the bearing unit to prevent a longitudinal movement of the bearing unit with respect to the slide surface when the bearing unit is moved to the target position.
교량받침의 프리세팅 방법이 개시되며, 상기 교량받침의 프리세팅 방법은, (a) 상기 받침유닛이 접촉되는 상기 하부판의 상면에 상기 받침유닛이 슬라이드 이동 가능한 슬라이드면이 형성된 상기 교량받침을 상기 하부구조물과 상기 상부구조물 사이에 배치하는 단계; (b) 상기 상부구조물에 대하여 상기 받침유닛이 상대적으로 종 방향 일측의 목표 위치로 이동되도록, 상기 상부구조물의 일일 온도변화에 따른 종 방향 길이 변화를 고려하여, 상기 하부판의 상면의 종 방향 일측에 형성된 제1 제한턱과 상기 받침유닛 사이에 제1 쐐기유닛을 배치하고, 상기 하부판 상면의 종 방향 타측에 형성된 제2 제한턱과 상기 받침유닛 사이에 제2 쐐기유닛을 배치하는 단계; 및 (c) 상기 받침유닛이 상기 목표 위치로 이동되면, 상기 슬라이드면에 대한 상기 받침유닛의 종 방향 이동이 방지되도록 상기 받침유닛을 고정하는 단계를 포함한다.
PRESETTING METHOD FOR BEARING AND PRESETTING BEARING
교량받침의 프리세팅 방법 및 프리세팅이 가능한 교량받침
KIM WOOK (author) / JUNG KILJE (author) / LEE JUN KYOUNG (author) / YI JANGSEOK (author) / KIM CHONG HYUN (author)
2020-03-13
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Bridge elastic bearing capable of presetting and presetting method
European Patent Office | 2019
|Presetting cracks in fluid concrete
Engineering Index Backfile | 1958
|