A platform for research: civil engineering, architecture and urbanism
Earth anchor of corrugated tube type and the anchor construction method
The present invention relates to a corrugated pipe type earth anchor and a construction method thereof. While strands coupled to a bearing body are accommodated in a hollow corrugated pipe, a filler is leaked to the outside of the corrugated pipe through a first leakage unit firstly opened by the pressure of the filler, such as cement paste, injected into and filled in the corrugated pipe to expand a packer of a boring hole in which the corrugated pipe type earth anchor is constructed. After a gap between an anchoring length and a free length of the boring hole is sealed, a protective tape is removed by the pressure of the filler, and then the filler is leaked to the outside through a second leakage unit opened next to the first leakage unit such that an opening or a sink hole formed around the anchoring length of the boring hole and the anchoring length are densely filled. According to the present invention, when the corrugated pipe type earth anchor is fixed to the boring hole of the ground, the opening or the sink hole formed around the anchoring length is densely filled such that the corrugated pipe type earth anchor can improve a frictional force of a foundation ground and the cement paste or the filler in the boring hole of the ground while the ground around the anchoring length of the boring hole is improved.
본 발명은 주름관식 어스 앵커 및 그 시공 방법에 관한 것으로, 중공형 주름관 내부에 내하체와 결합된 강연선들을 수용한 상태에서 주름관의 내부로 주입되어 충전되는 충전재(예컨대, 시멘트 페이스트)의 압력에 의해 먼저 개방되는 제1누출부를 통해 충전재를 주름관의 외부로 누출하여 주름관식 어스 앵커가 시공되는 천공홀의 패커가 팽창하게 하여 상기 천공홀의 정착장과 자유장 사이를 밀폐한 후 충전재의 압력에 의해 보호테이프가 제거됨에 따라 상기 제1누출부 다음으로 개방되는 제2누출부를 통해 충전재를 외부로 누출하여 상기 천공홀의 정착장과 해당 정착장 주변에 형성되어 있는 공극이나 싱크홀이 밀실하게 충전되게 한다. 본 발명에 따르면 주름관식 어스 앵커를 지반의 천공홀에 고정하는 경우 정착장 주변에 형성되어 있는 공극이나 싱크홀이 밀실하게 충전되기 때문에 천공홀의 정착장 주변 지반이 개량된 상태에서 지반의 천공홀 내에서 충전재 또는 시멘트 페이스트와 원지반의 마찰력이 증대하는 장점이 있다.
Earth anchor of corrugated tube type and the anchor construction method
The present invention relates to a corrugated pipe type earth anchor and a construction method thereof. While strands coupled to a bearing body are accommodated in a hollow corrugated pipe, a filler is leaked to the outside of the corrugated pipe through a first leakage unit firstly opened by the pressure of the filler, such as cement paste, injected into and filled in the corrugated pipe to expand a packer of a boring hole in which the corrugated pipe type earth anchor is constructed. After a gap between an anchoring length and a free length of the boring hole is sealed, a protective tape is removed by the pressure of the filler, and then the filler is leaked to the outside through a second leakage unit opened next to the first leakage unit such that an opening or a sink hole formed around the anchoring length of the boring hole and the anchoring length are densely filled. According to the present invention, when the corrugated pipe type earth anchor is fixed to the boring hole of the ground, the opening or the sink hole formed around the anchoring length is densely filled such that the corrugated pipe type earth anchor can improve a frictional force of a foundation ground and the cement paste or the filler in the boring hole of the ground while the ground around the anchoring length of the boring hole is improved.
본 발명은 주름관식 어스 앵커 및 그 시공 방법에 관한 것으로, 중공형 주름관 내부에 내하체와 결합된 강연선들을 수용한 상태에서 주름관의 내부로 주입되어 충전되는 충전재(예컨대, 시멘트 페이스트)의 압력에 의해 먼저 개방되는 제1누출부를 통해 충전재를 주름관의 외부로 누출하여 주름관식 어스 앵커가 시공되는 천공홀의 패커가 팽창하게 하여 상기 천공홀의 정착장과 자유장 사이를 밀폐한 후 충전재의 압력에 의해 보호테이프가 제거됨에 따라 상기 제1누출부 다음으로 개방되는 제2누출부를 통해 충전재를 외부로 누출하여 상기 천공홀의 정착장과 해당 정착장 주변에 형성되어 있는 공극이나 싱크홀이 밀실하게 충전되게 한다. 본 발명에 따르면 주름관식 어스 앵커를 지반의 천공홀에 고정하는 경우 정착장 주변에 형성되어 있는 공극이나 싱크홀이 밀실하게 충전되기 때문에 천공홀의 정착장 주변 지반이 개량된 상태에서 지반의 천공홀 내에서 충전재 또는 시멘트 페이스트와 원지반의 마찰력이 증대하는 장점이 있다.
Earth anchor of corrugated tube type and the anchor construction method
주름관식 어스 앵커 및 그 시공 방법
YUN YONG SU (author)
2020-04-22
Patent
Electronic Resource
Korean
Auger for earth anchor construction and Earth anchor construction method
European Patent Office | 2018
|Construction method of reinforcing anchor for corrugated pipe type
European Patent Office | 2019
|ANCHOR CONSTRUCTION METHOD, ANCHOR SYSTEM, ANCHOR CONSTRUCTION TOOL, AND ANCHOR
European Patent Office | 2019
|ANCHOR, ANCHOR CONSTRUCTION TOOL AND ANCHOR CONSTRUCTION METHOD
European Patent Office | 2017
|