ANCHOR, ANCHOR CONSTRUCTION TOOL AND ANCHOR CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an anchor that is improved in work efficiency when constructed, and thereby suppress the increase of construction cost.SOLUTION: An anchor 1 includes a first screw part 3 formed in one end side of a shaft part 2, a second screw part 4 formed in the other end side of the shaft part 2, an engagement part 6 formed in the end of the second screw part 4 and protruded or recessed more narrowly than the diameter of the second screw part 4, and a nut 7 pre-installed to the second screw part 4. The anchor 1 is characterized in that the shaft part 2 and the nut 7 are integrally rotated and the first screw part 3 is screwed into a hole according to that an anchor construction tool 10 is rotated while the anchor construction tool 10 is engaged with both of the engagement part 6 and the nut 7, the engagement part 6 is disengaged from an engagement state with the anchor construction tool 10 when the first screw part 3 is screwed to the hole by a predetermined depth, and the nut 7 is rotated while the shaft part 2 is not rotated, and thereby is constructed in a state where the end surface of the nut 7 is joined and secured in a slab surface.SELECTED DRAWING: Figure 3
【課題】アンカーを施工する際の作業効率を改善し、施工コストの上昇を抑える。【解決手段】アンカー1は、軸部2の一端側に形成される第1螺子部3と、軸部2の他端側に形成される第2螺子部4と、第2螺子部4の端部に形成され、第2螺子部4の直径よりも細幅に凸設又は凹設される係合部6と、第2螺子部4に予め装着されるナット7とを有する。アンカー1は、係合部6とナット7との双方にアンカー施工具10が係合した状態でアンカー施工具10が回転されることに伴い、軸部2とナット7とが一体的に回転して第1螺子部3を孔にねじ込んでいき、第1螺子部3が孔に対して所定深さねじ込まれたときに係合部6がアンカー施工具10との係合状態を離脱し、軸部2が回転しない状態でナット7が回転することにより、ナット7の端面がスラブ表面に接合して締着した状態に施工される。【選択図】図3
ANCHOR, ANCHOR CONSTRUCTION TOOL AND ANCHOR CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an anchor that is improved in work efficiency when constructed, and thereby suppress the increase of construction cost.SOLUTION: An anchor 1 includes a first screw part 3 formed in one end side of a shaft part 2, a second screw part 4 formed in the other end side of the shaft part 2, an engagement part 6 formed in the end of the second screw part 4 and protruded or recessed more narrowly than the diameter of the second screw part 4, and a nut 7 pre-installed to the second screw part 4. The anchor 1 is characterized in that the shaft part 2 and the nut 7 are integrally rotated and the first screw part 3 is screwed into a hole according to that an anchor construction tool 10 is rotated while the anchor construction tool 10 is engaged with both of the engagement part 6 and the nut 7, the engagement part 6 is disengaged from an engagement state with the anchor construction tool 10 when the first screw part 3 is screwed to the hole by a predetermined depth, and the nut 7 is rotated while the shaft part 2 is not rotated, and thereby is constructed in a state where the end surface of the nut 7 is joined and secured in a slab surface.SELECTED DRAWING: Figure 3
【課題】アンカーを施工する際の作業効率を改善し、施工コストの上昇を抑える。【解決手段】アンカー1は、軸部2の一端側に形成される第1螺子部3と、軸部2の他端側に形成される第2螺子部4と、第2螺子部4の端部に形成され、第2螺子部4の直径よりも細幅に凸設又は凹設される係合部6と、第2螺子部4に予め装着されるナット7とを有する。アンカー1は、係合部6とナット7との双方にアンカー施工具10が係合した状態でアンカー施工具10が回転されることに伴い、軸部2とナット7とが一体的に回転して第1螺子部3を孔にねじ込んでいき、第1螺子部3が孔に対して所定深さねじ込まれたときに係合部6がアンカー施工具10との係合状態を離脱し、軸部2が回転しない状態でナット7が回転することにより、ナット7の端面がスラブ表面に接合して締着した状態に施工される。【選択図】図3
ANCHOR, ANCHOR CONSTRUCTION TOOL AND ANCHOR CONSTRUCTION METHOD
アンカー、アンカー施工具及びアンカー施工方法
IKUNO MAKOTO (author)
2017-01-05
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
B25B
TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING, OR HOLDING
,
Werkzeuge oder Werkbankvorrichtungen zum Befestigen, Verbinden, Lösen oder Halten, soweit nicht anderweitig vorgesehen
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
ANCHOR CONSTRUCTION METHOD, ANCHOR SYSTEM, ANCHOR CONSTRUCTION TOOL, AND ANCHOR
European Patent Office | 2019
|EXPANSION ANCHOR, ANCHOR CONSTRUCTION TOOL AND ANCHOR CONSTRUCTION METHOD
European Patent Office | 2018
|ANCHOR, ANCHOR CONSTRUCTION TOOL AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2017
|