A platform for research: civil engineering, architecture and urbanism
Sewage pipe of synthetic resin and their manufacturing equipment and methods
The present invention relates to a sewage pipe of a synthetic resin cutoff wall and a manufacturing apparatus and a manufacturing method thereof. More specifically, a blocking wall is formed to be extruded and molded so as to be blocked and sealed in a hollow portion in a profile of the sewage pipe of the cutoff wall with a predetermined interval. Therefore, leakage of sewage and waste water in the sewage pipe can be blocked by the blocking wall of the sewage pipe of the cutoff wall so that soil contamination can be prevented in advance. In addition, the sewage pipe of the cutoff wall can be provided to be sealed and supported on the hollow structural profile by the blocking wall with the predetermined interval so that compressed strength and durability required in the sewage pipe of the cutoff wall embedded in the ground can be improved.
본 발명은 합성수지 차수벽 하수관과 그 제조장치 및 제조방법에 관한 것으로, 보다 상세하게는 차수벽 하수관의 프로파일의 내부 중공 부분에 일정 간격으로 차단, 밀봉되도록 차단벽을 압출, 성형되도록 형성함으로써, 차수벽 하수관의 차단벽에 의해 하수관 내의 오폐수의 누수 및 유출을 차단하여, 토양 오염을 미연에 방지할 수 있을 뿐만 아니라, 중공 구조의 프로파일에 일정간격으로 차단벽으로 밀봉, 지지되도록 구비되기 때문에, 지중에 매설되는 차수벽 하수관에 요구되는 압축강도와 내구성을 향상시킬 수 있도록 한 것이다.
Sewage pipe of synthetic resin and their manufacturing equipment and methods
The present invention relates to a sewage pipe of a synthetic resin cutoff wall and a manufacturing apparatus and a manufacturing method thereof. More specifically, a blocking wall is formed to be extruded and molded so as to be blocked and sealed in a hollow portion in a profile of the sewage pipe of the cutoff wall with a predetermined interval. Therefore, leakage of sewage and waste water in the sewage pipe can be blocked by the blocking wall of the sewage pipe of the cutoff wall so that soil contamination can be prevented in advance. In addition, the sewage pipe of the cutoff wall can be provided to be sealed and supported on the hollow structural profile by the blocking wall with the predetermined interval so that compressed strength and durability required in the sewage pipe of the cutoff wall embedded in the ground can be improved.
본 발명은 합성수지 차수벽 하수관과 그 제조장치 및 제조방법에 관한 것으로, 보다 상세하게는 차수벽 하수관의 프로파일의 내부 중공 부분에 일정 간격으로 차단, 밀봉되도록 차단벽을 압출, 성형되도록 형성함으로써, 차수벽 하수관의 차단벽에 의해 하수관 내의 오폐수의 누수 및 유출을 차단하여, 토양 오염을 미연에 방지할 수 있을 뿐만 아니라, 중공 구조의 프로파일에 일정간격으로 차단벽으로 밀봉, 지지되도록 구비되기 때문에, 지중에 매설되는 차수벽 하수관에 요구되는 압축강도와 내구성을 향상시킬 수 있도록 한 것이다.
Sewage pipe of synthetic resin and their manufacturing equipment and methods
합성수지 차수벽 하수관과 그 제조장치 및 제조방법
LEE SUNG WOO (author)
2020-04-21
Patent
Electronic Resource
Korean
European Patent Office | 2019
|European Patent Office | 2020
|