Construction method of top slab with opening for vertical shaft
The present invention relates to a construction method of a vertical shaft with an opening part on an uppermost slab which must have an opening part used for a purpose such as a vent on a slab installed on the upper most side of a vertical shaft. After a vertical shaft inner wall construction step of constructing an inner wall of a vertical shaft, while leaving an opening part after installing a support beam crossing an entrance of the vertical shaft on the upper end of the inner wall, a precast slab is mounted in a space between the support beam and the inner wall of the vertical shaft. A plurality of support beams can be used if the vertical shaft has a large cross section. The construction method includes a step of installing a first support beam crossing the entrance of the vertical shaft and a second support beam separated from the first support beam to cross the entrance of the vertical shaft on the upper end of the inner wall. A precast slab is mounted in a space between the first support beam and the inner wall of the vertical shaft and a space between the second support beam and the inner wall of the vertical shaft. While leaving the opening part, a precast slab is mounted between the first support beam and the second support beam.
수직구의 최상측에 설치되는 슬래브에, 환기구와 같은 용도로 사용되는 개구부를 구비하여야 하는, 최상단 슬래브에 개구부를 구비한 수직구의 시공방법에 관한 것이다. 수직구의 내벽을 시공하는 수직구 내벽 시공 단계 이후에, 상기 내벽의 상단에 수직구의 입구를 가로지르는 지지보를 설치한 후, 개구부를 남겨둔 채 상기 지지보와 수직구의 내벽 사이 공간에 프리캐스트 슬래브를 거치한다. 수직구가 대단면인 경우에는 복수의 지지보를 사용할 수 있는데, 상기 내벽의 상단에 수직구의 입구를 가로지르는 제1 지지보와 상기 제1 지지보와 이격되어 수직구의 입구를 가로지르는 제2 지지보를 설치하는 단계와, 상기 제1 지지보와 수직구의 내벽 사이 공간, 그리고 상기 제2 지지보와 수직구의 내벽 사이 공간에 프리캐스트 슬래브를 거치하고, 개구부를 남겨둔 채 제1 지지보와 제2 지지보의 사이에 프리캐스트 슬래브를 거치한다.
Construction method of top slab with opening for vertical shaft
The present invention relates to a construction method of a vertical shaft with an opening part on an uppermost slab which must have an opening part used for a purpose such as a vent on a slab installed on the upper most side of a vertical shaft. After a vertical shaft inner wall construction step of constructing an inner wall of a vertical shaft, while leaving an opening part after installing a support beam crossing an entrance of the vertical shaft on the upper end of the inner wall, a precast slab is mounted in a space between the support beam and the inner wall of the vertical shaft. A plurality of support beams can be used if the vertical shaft has a large cross section. The construction method includes a step of installing a first support beam crossing the entrance of the vertical shaft and a second support beam separated from the first support beam to cross the entrance of the vertical shaft on the upper end of the inner wall. A precast slab is mounted in a space between the first support beam and the inner wall of the vertical shaft and a space between the second support beam and the inner wall of the vertical shaft. While leaving the opening part, a precast slab is mounted between the first support beam and the second support beam.
수직구의 최상측에 설치되는 슬래브에, 환기구와 같은 용도로 사용되는 개구부를 구비하여야 하는, 최상단 슬래브에 개구부를 구비한 수직구의 시공방법에 관한 것이다. 수직구의 내벽을 시공하는 수직구 내벽 시공 단계 이후에, 상기 내벽의 상단에 수직구의 입구를 가로지르는 지지보를 설치한 후, 개구부를 남겨둔 채 상기 지지보와 수직구의 내벽 사이 공간에 프리캐스트 슬래브를 거치한다. 수직구가 대단면인 경우에는 복수의 지지보를 사용할 수 있는데, 상기 내벽의 상단에 수직구의 입구를 가로지르는 제1 지지보와 상기 제1 지지보와 이격되어 수직구의 입구를 가로지르는 제2 지지보를 설치하는 단계와, 상기 제1 지지보와 수직구의 내벽 사이 공간, 그리고 상기 제2 지지보와 수직구의 내벽 사이 공간에 프리캐스트 슬래브를 거치하고, 개구부를 남겨둔 채 제1 지지보와 제2 지지보의 사이에 프리캐스트 슬래브를 거치한다.
Construction method of top slab with opening for vertical shaft
최상단 슬래브에 개구부를 구비한 수직구 시공방법
KO EOM SHICK (author)
2020-08-19
Patent
Electronic Resource
Korean
VERTICAL SHAFT CONSTRUCTION DEVICE AND VERTICAL SHAFT CONSTRUCTION METHOD
European Patent Office | 2020
|