Prefabricated underground structure system for underground roadway and its construction method
The present invention relates to a construction method of a prefabricated underground structure for an underground roadway of a novel structure to effectively construct an underground roadway. According to the present invention, the construction method of a prefabricated underground structure for an underground roadway forms a pair of pits (2) laterally separated at an interval corresponding to a side plate (20) on the ground (1) to be extended in a front and a rear direction, installs a plurality of side plates (20) in the pits (2) to connect sides to each other, then injects mortar (4) or concrete between the side plates (20) to fix the side plates (20), couples an upper slab (30) to the upper ends of the side plates (20) coupled to the pits (2), covers an upper portion of the upper slab (30) with soil, then digs soil between the side plates (20) in a preset depth to form a space part (3), arranges reinforcing bars (11) on the bottom surface of the space part (3), and deposits concrete (12) to construct a lower slab (10) to construct a prefabricated underground structure for an underground roadway. Therefore, the upper slab (30) is coupled to the upper ends of the side plates (20) before forming the space part (3) by digging the soil between the side plates (20) to allow the upper slab (30) to support the side plates (20) to prevent the side plates (20) from collapsing. Therefore, construction is simplified.
본 발명은 지하차도를 효과적으로 시공할 수 있도록 된 새로운 구조의 지하차도용 조립식 지하구조물 시공방법에 관한 것이다. 본 발명에 따른 지하차도용 조립식 지하구조물 시공방법에 따르면, 지면(1)에 상기 측판(20)에 대응되는 간격으로 측방향으로 이격된 한 쌍의 구덩이(2)를 전후방향으로 연장되도록 형성하고, 상기 구덩이(2)에 복수개의 측판(20)을 상호 측면이 연결되도록 설치하한 후, 상기 측판(20)의 사이에 몰타르(4) 또는 콘크리트를 주입하여 측판(20)을 고정하고, 상기 구덩이(2)에 결합된 측판(20)의 상단에 상부슬래브(30)를 결합하고, 상기 상부슬래브(30)의 상부를 복토한 후, 상기 측판(20) 사이의 흙을 미리 설정된 깊이로 파내어 공간부(3)를 형성하고, 상기 공간부(3)의 바닥면에 철근(11)을 배근하고 콘크리트(12)를 타설하여 상기 하부슬래브(10)를 시공함으로써, 지하차도용 조립식 지하구조물을 시공할 수 있다. 따라서, 상기 측판(20) 사이의 흙을 파내어 공간부(3)를 형성하기 전에 측판(20)의 상단에 상부슬래브(30)를 결합함으로써, 상부슬래브(30)가 측판(20)이 무너지지 않도록 지지하게 됨으로, 시공이 매우 간단한 장점이 있다.
Prefabricated underground structure system for underground roadway and its construction method
The present invention relates to a construction method of a prefabricated underground structure for an underground roadway of a novel structure to effectively construct an underground roadway. According to the present invention, the construction method of a prefabricated underground structure for an underground roadway forms a pair of pits (2) laterally separated at an interval corresponding to a side plate (20) on the ground (1) to be extended in a front and a rear direction, installs a plurality of side plates (20) in the pits (2) to connect sides to each other, then injects mortar (4) or concrete between the side plates (20) to fix the side plates (20), couples an upper slab (30) to the upper ends of the side plates (20) coupled to the pits (2), covers an upper portion of the upper slab (30) with soil, then digs soil between the side plates (20) in a preset depth to form a space part (3), arranges reinforcing bars (11) on the bottom surface of the space part (3), and deposits concrete (12) to construct a lower slab (10) to construct a prefabricated underground structure for an underground roadway. Therefore, the upper slab (30) is coupled to the upper ends of the side plates (20) before forming the space part (3) by digging the soil between the side plates (20) to allow the upper slab (30) to support the side plates (20) to prevent the side plates (20) from collapsing. Therefore, construction is simplified.
본 발명은 지하차도를 효과적으로 시공할 수 있도록 된 새로운 구조의 지하차도용 조립식 지하구조물 시공방법에 관한 것이다. 본 발명에 따른 지하차도용 조립식 지하구조물 시공방법에 따르면, 지면(1)에 상기 측판(20)에 대응되는 간격으로 측방향으로 이격된 한 쌍의 구덩이(2)를 전후방향으로 연장되도록 형성하고, 상기 구덩이(2)에 복수개의 측판(20)을 상호 측면이 연결되도록 설치하한 후, 상기 측판(20)의 사이에 몰타르(4) 또는 콘크리트를 주입하여 측판(20)을 고정하고, 상기 구덩이(2)에 결합된 측판(20)의 상단에 상부슬래브(30)를 결합하고, 상기 상부슬래브(30)의 상부를 복토한 후, 상기 측판(20) 사이의 흙을 미리 설정된 깊이로 파내어 공간부(3)를 형성하고, 상기 공간부(3)의 바닥면에 철근(11)을 배근하고 콘크리트(12)를 타설하여 상기 하부슬래브(10)를 시공함으로써, 지하차도용 조립식 지하구조물을 시공할 수 있다. 따라서, 상기 측판(20) 사이의 흙을 파내어 공간부(3)를 형성하기 전에 측판(20)의 상단에 상부슬래브(30)를 결합함으로써, 상부슬래브(30)가 측판(20)이 무너지지 않도록 지지하게 됨으로, 시공이 매우 간단한 장점이 있다.
Prefabricated underground structure system for underground roadway and its construction method
지하차도용 조립식 지하구조물 시스템 및 이의 시공방법
PARK YONG SUN (author)
2020-09-11
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Expandable prefabricated underground structure system and construction method
European Patent Office | 2024
|European Patent Office | 2020
|European Patent Office | 2021
|Roadway Maintenance Underground
British Library Online Contents | 2006
Prefabricated overlapped underground garage structure and construction method
European Patent Office | 2024
|